Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
22 Sept 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
8K AND 24K ROUTINES OF AC PLANTS - INS KOCHI
2020_NAVY_376813_1
DYT/RAC/20-21/106(A)/PL-INCOD/ KOCHI-AC PLANTS/101
Single
Miscellaneous Services
Item Rate
150 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.9 L
Yes
NAVAL DOCKYARD MUMBAI
23 Sept 2020
11 Sept 2020
23 Sept 2020
11 Sept 2020
22 Sept 2020
15 Sept 2020
15 Sept 2020
180 days
Amount
Mandatory Spare parts kit for 8K hourly routines AC Plant – XRV204 (EK3330B-4100122163108K01440)
Mandatory Spare parts kit for 24K hourly routines AC Plant – XRV204 (EK3330B-4100122163124K01440)
8K hourly routines on 144 TR AC Plant. (a) Screw compressor XRVN204. (i) Checking /correction of loading unloading mechanism. (ii) Checking of Axial thrust clearance of screw compressor for wear. (iii) Checking /rectification of hot gas by pass system mechanism. (iv) Calibration /testing liner position indicator. (v) Cleaning of compressor suction gas strainer. (vi) Checking of Axial thrust (inlet end) clearance (overhaul the compressor if required, not included in scope of 8K routines). (vii) Checking of acceptable float in the compressor bearing (Overhaul the compressor if required, not included in scope of 8K routines). (b) Compressor motor. (i) Greasing of motor. (c) Condenser. (i) De - scaling of condenser tubes by brush cleaning. (ii) Replacement of cathode protector and condenser gaskets. (iii) Pressure testing of tube side. (d) Oil tank separator and Duplex Oil Filter. (i) Oil draining and flushing of oil tank separator and Nitrogen. (ii) Cleaning/Replacement of oil filter element. (e) Local Control Panel. (i) Servicing of the Local Control Panel. (f) Soft Starter Panel. (i) Servicing of the starter panel. (g) Refrigeration system. (i) Alignment of compressor and motor. (ii) Replacement of filter drier cores. (iii) Calibration / replacement of pressure / temperature gauges/ switches and instruments wherever applicable. (iv) Checking refrigeration valves for leakages and functioning/ replacement of valve seat. (v) Pressure testing of system and rctification of leakages. (vi) Checking healthiness of holding down bolts/ fasteners. (h) STW, Testing and Plant trials.
24K hourly routines on 144 TR AC Plant. (a) Compressor motor. (i) Greasing of motor. (b) Condenser. (i) De- scaling of condenser tubes by brush cleaning. (ii) Replacement of cathode protector and condenser gaskets. (iii) Pressure testing. (c) Oil tank separator and duplex oil filter. (i) Oil draining and flushing of oil tank separator with nitrogen. (ii) Pressure testing of oil tank separator. (iii) Cleaning /replacement of oil filter element. (d) Chiller (evaporator). (i) Cleaning of refrigerant side by flushing nitrogen. (ii) Pressure testing. (a) Local control panel. (i) Servicing of the local control panel. (b) Soft starter panel. (i) Servicing of the starter panel. (c) Refrigeration system. (i) Alignment of compressor and motor. (ii) Replacement of filter drier cores. (iii) Calibration / replacement of pressure / temperature gauges/ switches and instruments wherever applicable. (iv) Checking refrigeration valves for leakages and functioning/ replacement of valve seat. (v) Pressure testing of system and rectification of leakages. (vi) Checking healthiness of holding down bolts/ fasteners and replacement if required. (vii) Replacement of shock mounts. (d) STW, testing and plants trials.
24K hourly routines on 144 TR AC Plant. Overhauling of compressor (To be overhauled in KPCL, Saswad, Pune). (a) Screw compressor XRVN204. (i) Inspection and major overhauling. (ii) Checking / rectification of hot gas by pass system mechanism. (iii) Cleaning of compressor suction gas strainer. (iv) Checking / correction of loading unloading mechanism. (v) Cheking / correction of Axial thrust (inlet end) clearance. (vi) Checking /correction of acceptable float in the compressor bearing.
Anticipatory spare parts for compressor motor(a) Bearing (Drive end) for 160kw motor 51004.180.412.334.01600
Anticipatory spare parts for compressor motor(a) Bearing (Drive end) for 160kw motor 51004.180.412.334.01600
Anticipatory services for compressor motor(a) Replacement of bearings of 160kw motor
stage.html
html • 0.02 MB
finance_420365.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .