Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAccepted-AOC | ₹68.8 L | L1 | Accepted-AOC The bidder won the transparency lottery among the qualified bidder so that the work has been awarded to him |
| 2 | L1₹68.8 LRejected-AOC | ₹68.8 L | L1 | Rejected-AOC Rejected |
| 3 | L1₹68.8 LRejected-AOC AT RUPADEIPUR PO RUPADEIPUR PS BALANGA DIST PURI PIN 752105 | PURI | ODISHA | 752105 | ₹68.8 L | L1 | Rejected-AOC Rejected |
| 4 | L1₹68.8 LRejected-AOC | ₹68.8 L | L1 | Rejected-AOC Rejected |
| 5 | L1₹68.8 LRejected-AOC | ₹68.8 L | L1 | Rejected-AOC Rejected |
Tender Value
₹68.8 L
EMD Value
₹68,773
Closing Date
28 May 2026, 5:00 pmClosed
Er.Soumya Ranjan Dwibedi
O/o the S E R and B Division Puri
Repair and renovation of Toilet Block with Corridor Connection, New compound wall and Drain of Biswambar Govt. High School, Puri. Building
2026_EICCL_129499_1
SERANDB PURI-06/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Puri
2 documents required · 2 mandatory
₹10,000
₹68,773
Yes
7 Sept 2026
19 May 2026
29 May 2026
19 May 2026
28 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in ordinary soil including dressing of sides and levelling the bed and depositing the excavated materials away from the work site within initial lead & lifts etc. complete as directed by the Engineer in charge. | 301.48 | cum | 210.52 | ₹63,467.57 |
| 2 | Supplying and filling in foundation and plinth with sand, laying in layers, well watered and rammed including cost, conveyance, royalties and taxes of all materials, cost of all labour and T&P etc. complete in all respect as per direction by the Engineer in charge. | 210.21 | cum | 904.44 | ₹1,90,122.33 |
| 3 | Providing and laying PCC (1:3:6) in foundation and floors using 4cm size crushed stone granite aggregates including laying in layers, ramming, watering and curing etc. complete including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in-charge. | 53.53 | cum | 6,642.6 | ₹3,55,578.38 |
| 4 | PCC / RCC work of (1:1.5:3) in all floors floors using 12mm size crushed stone granite aggregates including laying in layers, ramming, watering and curing etc. complete including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in-charge. (Ground Floor) | 2.6 | cum | 8,976.84 | ₹23,339.78 |
| 5 | Fly ash brick masonry in all floors with cement mortar (1:4) using bricks of 25cm size, after immersing Bricks before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge. (Ground Floor) | 8.99 | cum | 5,948 | ₹53,472.52 |
| 6 | Fly ash brick masonry in all floors with cement mortar (1:6) using bricks of 25cm size, after immersing Bricks before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge.(Foundation) | 57.7 | cum | 5,680.43 | ₹3,27,760.81 |
| 7 | Ground Floor | 84.43 | cum | 5,718.77 | ₹4,82,835.75 |
| 8 | Back Filling of surplus excavated earth at work site by initial lead and lift of 1.50mtr including cost of all labour T&P required for the work etc. complete as directed by Engineer-In-Charge | 185 | cum | 116.95 | ₹21,635.75 |
| 9 | R.C.C. work of M.25 in different work using 20 mm & down graded size crushed stone granite aggregates including hoisting lowering, laying concrete and compacting by using vibrators, watering, curing and necessary centring & shuttering for smoth finishing of work excluding steel reinforcement work including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in-charge. (Column footing) | 27.69 | cum | 7,479.06 | ₹2,07,095.17 |
| 10 | Plinth Band | 13.58 | cum | 8,353.48 | ₹1,13,440.26 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.92 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_591936.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .