Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹4.2 L (4.27%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹89.2 L
EMD Value
₹50,000
Closing Date
27 Jul 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
ExecutiveEngineerInlandNavigationDivision Kollam
CSIND Urgent side protection of the collapsed high bund and walkway due to recent heavy down pour on the right bank of Kollam Thodu in between Ch72250m to 72750m of west coast canal.
2021_Irrig_406925_2
19/EE/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Kollam
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,280
₹50,000
Yes
27 May 2023
13 Jul 2021
2 Aug 2021
13 Jul 2021
27 Jul 2021
13 Jul 2021
60 days
Amount
Detailed estimate Appendix A
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as per the direction of Departmental officer at site.
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per the direction of Departmental officer at site.
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m as per the direction of Departmental officer at site.
od34053/2020_2021/IA : Constructing a temporary ring bund with top width of 2.0m and bottom width of 4.0m and average height of 4.0m with ½ split coconut posts of 7.5m long at 70 cm c/c diving down 3.0m below to the ground level including providing ¼ split coconut posts for wailing pieces with split and crushed bamboo full in full height including tying properly using iron wire coir altogether and supply bush wood bundle 10kg each and stacking conveniently and spreading the same and filling inside with cut earth upto 4.0m height of bund for forming the till the end of season and serve the purpose and after removing the bund etc as per the direction of departmental officers at site and including all cost of materials and hireand labour charges, all incidental and conveyance charges etc., complete.
60.2.6 : BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP - Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete as per the direction of Departmental officer at site.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil As per the direction of Departmental officer at site.
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete as per the direction of Departmental officer at site.
60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end as per the direction of Departmental officer at site.
60.64.6 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m As per the direction of Departmental officer at site.
2.27 : Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete as per the direction of Departmental officer at site.
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) As per the direction of Departmental officer at site.
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of Departmental officer at site.
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers as per the direction of Departmental officer at site.
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.as per the direction of Departmental officer at site.
od34054/2020_2021/IA : Temporary protection to the existing walkway, nearby buildings and structures from collapse due to deep excavation for carrying out retaining wall construction activities safely for depths of above 4.00 m but not exceeding 10.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipment and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipment, tools and plants and sundries etc. complete.
od34055/2020_2021/IA : Providing weep holes using 75mm dia.Poly propylene pipes working pressure 4kg /sq.cm including cost of materials,conveyance, labour charges etc as per the direction of Departmental officer at site.
Appendix B
4.1.A.1 : Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material as per the direction of Departmental officer at site.
14.1C.1.1.B : "Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer as per drawing and Technical Specification. For r solid slab super-structure - Height 5m to 10 m as per the direction of Departmental officer at site.
14.2 : Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications as per the direction of Departmental officer at site.
6.6 : Construction reinforced-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15 per cent and sand by 10 per cent, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per the direction of Departmental officer at site. Cement - Flyash Concrete Pavement -
John Abraham
Bidder Name
RTF INFRA PRIVATE LIMITED
John Abraham
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_610336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .