Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.2 Cr+₹4.1 L (1.92%)Rejected-AOC | ₹2.2 Cr+₹4.1 L (1.92%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹2.2 Cr+₹4.2 L (1.98%)Rejected-AOC | ₹2.2 Cr+₹4.2 L (1.98%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹2.3 Cr+₹12.1 L (5.67%)Rejected-AOC | ₹2.3 Cr+₹12.1 L (5.67%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹2.3 Cr+₹15.5 L (7.26%)Rejected-AOC | ₹2.3 Cr+₹15.5 L (7.26%) | L-5 | Rejected-AOC L-5 |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
24 Apr 2020, 3:00 pmClosed
Shri P.K.SUBUDHI
AGM (MECH.) CONTRACTS, CPP, NALCO, ANGUL
CHP-II, AREA-A, AREA-B AND AREA-C OPERATION ASSISTANCE AND HOUSEKEEPING JOBS.
2020_NALCO_553524_1
MC-4878
Open Tender
Miscellaneous Services
Item Rate
730 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹2.5 L
Yes
23 Feb 2021
19 Mar 2020
27 Apr 2020
20 Mar 2020
24 Apr 2020
20 Mar 2020
Amount
Operation & assistance for A-Shift: 12 no of manpower (01HSW+03SSW+08USW) to be supplied in each shift to execute the job items under item no- 1 to 3 as detailed in scope of work attached separately.
Operation & assistance for B-Shift: 12 no of manpower (01HSW+03SSW+08USW) to be supplied in each shift to execute the job items under item 1 to 3 as detailed in scope of work attached separately.
Operation & assistance for C-Shift: 12 no of manpower (01HSW+03SSW+08USW) to be supplied in each shift to execute the job items under item 1 to 3 as detailed in scope of work attached separately.
Housekeeping: 10 no of manpower (10 USW) to be supplied in G shift to execute the job items under item no-4 as detailed in scope of work attached separately.
Coal transportation: The spilled coal, debris & foreign / extraneous materials if any which could not be reclaimed back to the belt conveyor need to be piled up & to be transported back to the coal/ scrap yard. The following areas will be covered under this scope. 1. Spilled / accumulated coal deposits around (GTU) & JHs under Area-A. 2. Spilled/ accumulated coal deposits under the conveyor galleries under Area-A. 3. Accumulation of all scrapes received by MGR rakes such as foreign / extraneous materials, mines end scrapes, stones, plates, angles, pins, concreteslabs,railtrack-slippers,boulders,garbage etc. entrapped, segregated in TH as well as in CBMS, inside the chutes, Gallery sides and middle walkways and from any related work site & to be disposed off in the areas as directed by EIC. Note-The contractor has to engage the motorized vehicle not less than the capacity of a tractor (03 cum capacity)for removal of scraps and debris and to dispose it off at designated scrap bins ,Vats and to take the necessary CISF gate entry permission ahead of commencement of job with a separate gang of workmen for timely loading ,unloading & for safe disposal of debris /coal heaps.
M/s. BINAYAK CONSTRUCTION
CHAITANYA MAJHI
M/S MADHU CHAKRA CONSTRUCTION
M/s.KAMADEVI ENTERPRISERS
M/s. GANGA JAMUNA ENTERPRISE
OMM CONSTRUCTION
SAI ENGINEERING
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .