Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC VILLAGE BARSARA DISTRICT SURAJPUR CHHATTISGARH PIN 497331 | BARSARA | SURAJPUR | CHHATTISGARH | 497331 | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical GROUND FLOOR JUNAPARA NEAR INDRAPRASTH SCHOOL BAIKUNTHPUR CHHATTISGARH 497339 | KOREA | CHHATTISGARH | 497339 | - | - | Rejected-Technical Not evaluated |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not evaluated |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not evaluated |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not evaluated |
| Sl No | Description | Qty | Unit | PIYUSH RANJAN L3 | VINAY KUMAR JAISWAL L1 | Mithilesh Kumar Singh L10 | TULACHAND GUPTA L8 | rakesh prasad L4 | BAIKUNTH ENTERPRISES L6 | MERAJ AHMAD L9 | Rohit Kumar Singh L2 | GOPAL SONI L5 | M/s Arti Trading Company L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 62.1 | cum | 100.23 ₹6,224.42 | 90 ₹5,589 | 133.77 ₹8,306.99 | 70 ₹4,347 Lowest | 101.54 ₹6,305.63 | 111.4 ₹6,917.94 | 118.2 ₹7,340.22 | 92.6 ₹5,750.46 | 101.5 ₹6,303.15 | 111.66 ₹6,934.12 |
| 2.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.09 | cum | 2,760.95 ₹72,033.13 | 2,487 ₹64,885.83 | 3,684.7 ₹96,133.93 | 2,300 ₹60,007 Lowest | 2,797 ₹72,973.73 | 3,070.6 ₹80,111.95 | 3,256.37 ₹84,958.69 | 2,549.8 ₹66,524.28 | 2,797.1 ₹72,976.34 | 3,075.75 ₹80,246.25 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 24 | cum | 3,062.63 ₹73,503.22 | 2,759 ₹66,216 | 4,087.33 ₹98,095.89 | 2,600 ₹62,400 Lowest | 3,102.7 ₹74,464.8 | 3,406.1 ₹81,746.4 | 3,612.2 ₹86,692.8 | 2,828.5 ₹67,884 | 3,102.7 ₹74,464.8 | 3,411.83 ₹81,883.96 |
| 4.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 10.8 | cum | 3,532.18 ₹38,147.51 | 3,182 ₹34,365.6 | 4,713.97 ₹50,910.88 | 2,700 ₹29,160 Lowest | 3,578.4 ₹38,646.72 | 3,928.3 ₹42,425.64 | 4,165.9 ₹44,991.72 | 3,262.2 ₹35,231.76 | 3,578 ₹38,642.4 | 3,934.91 ₹42,497.04 |
| 5.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars | 1,080 | kg | 48.02 ₹51,857.55 | 43 ₹46,440 Lowest | 64.08 ₹69,208.02 | 67 ₹72,360 | 48.6 ₹52,488 | 53.4 ₹57,672 | 56.6 ₹61,128 | 44.3 ₹47,844 | 48.6 ₹52,488 | 53.49 ₹57,770.28 |
| 6.01 | "Brick work with fly ash bricks in super structure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand) Cement mortar 1:6 (1 cement : 6 coarse sand)" | 8.83 | cum | 3,319.19 ₹29,308.48 | 2,990 ₹26,401.7 | 4,429.73 ₹39,114.49 | 2,600 ₹22,958 Lowest | 3,362.6 ₹29,691.76 | 3,691.4 ₹32,595.06 | 3,914.7 ₹34,566.8 | 3,065.4 ₹27,067.48 | 3,362.6 ₹29,691.76 | 3,697.64 ₹32,650.19 |
| 7.01 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 80 | sqm | 118.53 ₹9,482.34 | 106 ₹8,480 | 158.19 ₹12,654.94 | 90 ₹7,200 Lowest | 120 ₹9,600 | 131.8 ₹10,544 | 139.8 ₹11,184 | 109.4 ₹8,752 | 120 ₹9,600 | 132.04 ₹10,563.5 |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 87 | sqm | 146.38 ₹12,734.71 | 131 ₹11,397 | 195.35 ₹16,995.48 | 90 ₹7,830 Lowest | 148.3 ₹12,902.1 | 162.7 ₹14,154.9 | 172.6 ₹15,016.2 | 135.1 ₹11,753.7 | 148.4 ₹12,910.8 | 163.07 ₹14,186.71 |
| 9.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 3,709.35 | kg | 55.27 ₹2,04,999.08 | 49 ₹1,81,758.15 Lowest | 73.76 ₹2,73,587.56 | 67 ₹2,48,526.45 | 55.9 ₹2,07,352.66 | 61.4 ₹2,27,754.09 | 65.1 ₹2,41,478.68 | 51.04 ₹1,89,325.22 | 56 ₹2,07,723.6 | 61.57 ₹2,28,372.81 |
Tender Value
₹14.7 L
EMD Value
₹18,400
Closing Date
27 Apr 2026, 5:00 pmClosed
SO(Civil), SECL, Baikunthpur Area
SO(Civil), SECL, Baikunthpur Area
Making Motor cycle stand shed at Jhilimili mine of Jhilimili Sub Area of Baikunthpur Area
2026_SECL_358369_1
SECL /BKP/ DGM(C) / e-T / 05
Open Tender
Civil Works - Others
Item Rate
45 days
Jhilimili
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,400
31 Jul 2026
16 Apr 2026
29 Apr 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
16 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 62.1 | cum | - | - |
| 2.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.09 | cum | - | - |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 24 | cum | - | - |
| 4.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 10.8 | cum | - | - |
| 5.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Cold twisted bars | 1,080 | kg | - | - |
| 6.01 | "Brick work with fly ash bricks in super structure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand) Cement mortar 1:6 (1 cement : 6 coarse sand)" | 8.83 | cum | - | - |
| 7.01 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 80 | sqm | - | - |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 87 | sqm | - | - |
| 9.01 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 3,709.35 | kg | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_371243.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.84 MB
BOQ_371243.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .