| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BINCE GEORGE L2 | jafad vj L1 |
|---|---|---|---|---|---|
| 1.00Pump set new rate | |||||
| 1.00 | OD316583/2025-2026:SCOPE OF WORK
1.1 The scope includes the supply, erection, installation, testing, and commissioning of one (1) set of Vertical Turbine Pump coupled with a suitable motor, including all electrical, mechanical, and safety accessories.
1.2 All works shall strictly adhere to IE Rules, KWA Standards, and instructions from departmental officers.
2.0 PUMP & MOTOR SPECIFICATIONS
2.1 Type: Vertical Turbine Pump set of approved Indian make.
2.2 Impeller: High-quality Bronze impeller with the minimum required stages for optimal efficiency.
2.3 Duty Parameters:
Discharge: 28 LPS
Total Head: 75 Meters
Suction Depth: 10 Meters
Column Pipe: 200 mm (8-inch) MS/GI heavy-duty flanged pipes.
2.4 Warranty: Minimum two (2) years comprehensive warranty from the date of commissioning.
3.0 MOTOR STARTER & CONTROL SYSTEM
3.1 Soft Starter: KWA-approved 40 HP Soft Starter (Make: Danfoss / ABB / Schneider etc) with a built-in bypass contactor.
3.2 Protections: The starter must include:
Overload & Dry Run Protection
Low Voltage Release & Single Phase Preventer
Phase Unbalance & Phase Reversal Protection.
3.3 Testing: The assembly must be pre-wired and tested for industrial-grade reliability.
4.0 ELECTRICAL PANEL BOARD
4.1 Construction: Dust-proof, cubicle-type panel fabricated from 2 mm thick CRCA sheet, finished with powder coating.
4.2 Components (KWA Standard):
Incomer: 100 Amp TPN MCCB with thermal-magnetic trip.
Protection: 63 Amp Switch Fuse Unit (SFU) with HRC fuses.
Power Factor: Heavy-duty APP Capacitor of required KVAR.
Metering: Digital/Analog Voltmeter and Ammeter with selector switches.
Indication: LED-type RYB phase indicators.
4.3 All components must bear ISI marks and be factory-tested.
5.0 CABLES & EARTHING
5.1 Cabling: Supply and laying of ISI-marked 3-core copper flexible/armoured cable of suitable rating as per IE rules.
5.2 Earthing: Double earthing for the motor and starter panel as per IS:3043 and IE regulations to ensure maximum safety.
6.0 VALVES, FITTINGS & SAFETY
6.1 Valves: 200 mm PN 1.6 D/F Non-Return Valve (NRV) and 200 mm PN 1.6 D/F Sluice Valve (ISI marked).
6.2 Instruments: Industrial-grade oil-filled Pressure Gauge (0-15 kg/cm²).
6.3 Safety: 11kV grade insulated rubber mats (to be placed in front of the panel) and necessary "Danger" caution boards.
7.0 TESTING, COMMISSIONING & COMPLIANCE
7.1 Trial Run: Performance testing (efficiency, head, and discharge) shall be conducted after installation.
7.2 Inspection: Commissioning must be done in the presence of KWA departmental officers.
7.3 Compliance: All materials and execution must conform to relevant IS standards and KWA technical specifications.
8. Include supply and fitting of soft starter.
complete | 1 | no | 10,55,594.43 ₹10,55,594.43 | 9,49,000 ₹9,49,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹28,224
Closing Date
19 Aug 2026, 3:15 pmClosed
Assistant Executive Engineer
Public Health Sub Division Perumbavoor
DEPOSIT-MLA ADS 2025 26 Supply erection commisioning of 40HP VT Motor pumpset for rural water supply scheme at Manchanad in Mazhuvanoor Panchayth
2026_KWA_865023_1
WRD KWA CE CR TR 4884 2026 5 1 1 2
Open Tender
Civil Works - Water Works
Item Wise
180 days
perumbavoor
No
7 documents required · 7 mandatory
₹2,760
₹28,224
20 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
10 Aug 2026 - 19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pump set new rate | |||||
| 1.001 | OD316583/2025-2026:SCOPE OF WORK
1.1 The scope includes the supply, erection, installation, testing, and commissioning of one (1) set of Vertical Turbine Pump coupled with a suitable motor, including all electrical, mechanical, and safety accessories.
1.2 All works shall strictly adhere to IE Rules, KWA Standards, and instructions from departmental officers.
2.0 PUMP & MOTOR SPECIFICATIONS
2.1 Type: Vertical Turbine Pump set of approved Indian make.
2.2 Impeller: High-quality Bronze impeller with the minimum required stages for optimal efficiency.
2.3 Duty Parameters:
Discharge: 28 LPS
Total Head: 75 Meters
Suction Depth: 10 Meters
Column Pipe: 200 mm (8-inch) MS/GI heavy-duty flanged pipes.
2.4 Warranty: Minimum two (2) years comprehensive warranty from the date of commissioning.
3.0 MOTOR STARTER & CONTROL SYSTEM
3.1 Soft Starter: KWA-approved 40 HP Soft Starter (Make: Danfoss / ABB / Schneider etc) with a built-in bypass contactor.
3.2 Protections: The starter must include:
Overload & Dry Run Protection
Low Voltage Release & Single Phase Preventer
Phase Unbalance & Phase Reversal Protection.
3.3 Testing: The assembly must be pre-wired and tested for industrial-grade reliability.
4.0 ELECTRICAL PANEL BOARD
4.1 Construction: Dust-proof, cubicle-type panel fabricated from 2 mm thick CRCA sheet, finished with powder coating.
4.2 Components (KWA Standard):
Incomer: 100 Amp TPN MCCB with thermal-magnetic trip.
Protection: 63 Amp Switch Fuse Unit (SFU) with HRC fuses.
Power Factor: Heavy-duty APP Capacitor of required KVAR.
Metering: Digital/Analog Voltmeter and Ammeter with selector switches.
Indication: LED-type RYB phase indicators.
4.3 All components must bear ISI marks and be factory-tested.
5.0 CABLES & EARTHING
5.1 Cabling: Supply and laying of ISI-marked 3-core copper flexible/armoured cable of suitable rating as per IE rules.
5.2 Earthing: Double earthing for the motor and starter panel as per IS:3043 and IE regulations to ensure maximum safety.
6.0 VALVES, FITTINGS & SAFETY
6.1 Valves: 200 mm PN 1.6 D/F Non-Return Valve (NRV) and 200 mm PN 1.6 D/F Sluice Valve (ISI marked).
6.2 Instruments: Industrial-grade oil-filled Pressure Gauge (0-15 kg/cm²).
6.3 Safety: 11kV grade insulated rubber mats (to be placed in front of the panel) and necessary "Danger" caution boards.
7.0 TESTING, COMMISSIONING & COMPLIANCE
7.1 Trial Run: Performance testing (efficiency, head, and discharge) shall be conducted after installation.
7.2 Inspection: Commissioning must be done in the presence of KWA departmental officers.
7.3 Compliance: All materials and execution must conform to relevant IS standards and KWA technical specifications.
8. Include supply and fitting of soft starter.
complete | - | no | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.21 MB
BOQ_1463746.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].