Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | +7.00% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹32.1 L (16.0%)Admitted-Finance ERNAKULAM KERALA 683573 UDYAM KL 02 0001988 32AAIFD1158Q1Z8 R M | ERNAKULAM | KERALA | 683573 | +24.11% | ₹2.3 Cr+₹32.1 L (16.0%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹1.1 Cr (54.2%)Admitted-Finance 1ST FLOOR BCG BUILDING THRIKKAKARA ERNAKULAM ERNAKULAM KERALA 682037 | ERNAKULAM | KERALA | 682037 | +65.00% | ₹3.1 Cr+₹1.1 Cr (54.2%) | L3 | Admitted-Finance |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
18 May 2026, 10:00 amClosed
DGM(CE)
DGM(CIIVIL) Civil Engineering Department CSL, Kochi
Repainting of SSD Fabrication Shop
2026_CSL_275993_1
Repainting of SSD Fabrication Shop
Open Tender
Civil Works
Percentage
90 days
CSL Kochi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.4 L
7 Aug 2026
28 Apr 2026
19 May 2026
28 Apr 2026
18 May 2026
28 Apr 2026
28 Apr 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Painting with two coats of aluminium paint of approved quality, over one coat of zinc chromate primer, for all exposed surfaces of the structural members (including connecting members), after rubbing and cleaning the surface of steel members using mechanical buffing machine in order to remove the rust and prepare the surface to receive the priming coat, brushes or sandpapers shall be used in locations where buffing cannot be done. Item is inclusive of cost and conveyance of all materials, labour charges, hire charges, charges of safety arrangements to carry out works at height, buffing charges, other incidentals etc. complete. | |||||
| 1.01 | By Rope Access method:- Roof truss including gusset plates, bracings, rainwater gutter supports, crane stoppers, stiffners, cleats, spacers, nuts, bolts, angles, channels etc. Height of truss 24.4 m to 31.4 m from floor level including monitors.
(Approximate 164.77m2/No.) | 39 | EA | 1,27,697 | ₹49,80,183 |
| 2Painting with two coats of aluminium paint of approved quality, over one coat of zinc chromate primer, for all exposed surfaces of the structural members (including connecting members), after rubbing and cleaning the surface of steel members using mechanical buffing machine in order to remove the rust and prepare the surface to receive the priming coat, brushes or sandpapers shall be used in locations where buffing cannot be done. Item is inclusive of cost and conveyance of all materials, labour charges, hire charges, charges of safety arrangements to carry out works at height, buffing charges, other incidentals etc. complete for all structures. | |||||
| 2.01 | For Height works by Rope Access method:- Purlins (ISMC-100, top and side purlins) and connecting rods of 16 mm dia, for Z grid, G' grid. Height from floor level up to 32 m.
(Approximate 40.78 m2/No.) | 88 | EA | 31,605 | ₹27,81,240 |
| 2.02 | For Height works by Rope Access method:- Crane girders and auxiliary girders in east side 19.80 m from floor level.
(Approximate 595.07 m2/No) | 2 | EA | 4,61,179 | ₹9,22,358 |
| 2.03 | For Height works by Rope Access method:- East side latiz girders, 24.40 m from floor level at Z & G' grid- 22metre Length, 2Nos.
(Approximate 102.42 m2/No) | 2 | EA | 79,376 | ₹1,58,752 |
| 2.04 | For Height works by Rope Access method:- East side latiz girders, 24.40 m from floor level at Z & G' grid- 18metre Length, 2 Nos.
(Approximate 73.02 m2/No) | 2 | EA | 56,591 | ₹1,13,182 |
| 2.05 | For Height works by Rope Access method:- East side latiz girders, 24.40 m from floor level at Z & G' grid- 9.75 metre length 1 No.
(Approximate 133 m2/No) | 1 | EA | 1,03,075 | ₹1,03,075 |
| 2.06 | For Height works by Rope Access method:- East side latiz girders, 26.15 m from floor level - between Z & G' grid (40 & 42 grid). Total 73metres for 2 Nos.
(Approximate 167.68 m2/No) | 2 | EA | 1,29,952 | ₹2,59,904 |
| 2.07 | For Height works by Rope Access method:- SSD Fabrication Shop - rectangular tie beam (LB - 02 & LB - 02x) connecting top of columns - Z grid & G' grid of Fabrication Shop, 24.40 m from floor level.
(Approximate 308.18 m2/No) | 2 | EA | 2,38,840 | ₹4,77,680 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
11.pdf
Tender Documents • 0.97 MB
BOQ_322327.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .