Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 LAdmitted-Finance | ₹2.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ISHAN ELECTRICAL and MECH. ENGG. WORKS L1 | R M ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Complete cleaning/Servicing and maintenance of4 No’s air cooled Chiller Plants installed for Air Conditioning of Library and Auditorium installed at the Terrace of GMC Jammu. The Job includes complete servicing of Chiller Plants by using chemical through Pump to remove unwanted dust from it and also washing an cleaning of sir filters drainage, line cleaning etc. The job also includes washing of condenser coil using chemical wash so as to remove the accumulated impunities /dirt / blockages. Extracting and fitting of Drier Filter by way of dismantling of old Drier Filter and cleaning it in cleaning agent and fitting it back. Recharging to the Air Cooled AC Chiller plants including allied works by way of testing leakage in the plants by filling Nitrogen gas in the system at a pressure of 1.5 times the operating pressure for 24 hours . First the entire system is tested at low pressure to make sure that there are no leaks and then high pressure is applied to the high side only and tested the system for any leaks. Further the leak is detected by smearing soap/chemical solution all over the joints and pipes and observing the bubble formation. If any leak is detected then its plugged by copper brazing/gas welding method This pressure testing is repeated until there are no more leaks. The system is vaccumised before charging the refrigerant gas for removing air and moisture from the entire system. The system of both the chiller plants is charged with 90 Kg (approx) of R-22 (Refrigerant gas). The job also includes testing of cooling of the AC chiller Plants on full load. Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job. | 1 | job | 0.02 ₹2.1 L | 0.01 ₹2.2 L |
Updated dates
Tender Value
₹2.2 L
EMD Value
₹5,000
Closing Date
27 Mar 2026, 4:00 pmClosed
XEN MH DIVISION GMCH JAMMU
XEN MH DIVISION GMCH JAMMU
Complete cleaningServicing and maintenance to 4 Nos Air cooled Chiller Plants installed for Air Conditioning of Auditorium and Library installed at the Terrace of GMC Jammu.
2026_PWDJK_305443_1
MHDJ/e-NIT 394 of 2025-26
Open Tender
Repair and Maintenance Services
10 days
GMCH
as per e nit
2 documents required · 2 mandatory
₹200
XEN MH DIVISION GMCH JAMMU
₹5,000
19 May 2026
6 Mar 2026
28 Mar 2026
6 Mar 2026
27 Mar 2026
7 Mar 2026
6 Mar 2026 - 13 Mar 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer, Mechanical & Hospital Division GMCH Jammu.
Complete cleaning/Servicing and maintenance to 4 No’s Air cooled Chiller Plants installed for Air Conditioning of Auditorium and Library installed at the Terrace of GMC Jammu
MHDJ/e-NIT 393 of 2025-26 Dated: 06.03.2026 Due : 13.03.2026
Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Rate including GST to be quoted by the bidder Rs. P Currency Convertion against each Item Quoted Currency in INR / Other Currency Rebate on old parts in Percentage (%) if any Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Net Cost of item Rs. P
1 Complete cleaning/Servicing and maintenance of4 No’s air cooled Chiller Plants installed for Air Conditioning of Library and Auditorium installed at the Terrace of GMC Jammu. The Job includes complete servicing of Chiller Plants by using chemical through Pump to remove unwanted dust from it and also washing an cleaning of sir filters drainage, line cleaning etc. The job also includes washing of condenser coil using chemical wash so as to remove the accumulated impunities /dirt / blockages. Extracting and fitting of Drier Filter by way of dismantling of old Drier Filter and cleaning it in cleaning agent and fitting it back. Recharging to the Air Cooled AC Chiller plants including allied works by way of testing leakage in the plants by filling Nitrogen gas in the system at a pressure of 1.5 times the operating pressure for 24 hours . First the entire system is tested at low pressure to make sure that there are no leaks and then high pressure is applied to the high side only and tested the system for any leaks. Further the leak is detected by smearing soap/chemical solution all over the joints and pipes and observing the bubble formation. If any leak is detected then its plugged by copper brazing/gas welding method This pressure testing is repeated until there are no more leaks. The system is vaccumised before charging the refrigerant gas for removing air and moisture from the entire system. The system of both the chiller plants is charged with 90 Kg (approx) of R-22 (Refrigerant gas). The job also includes testing of cooling of the AC chiller Plants on full load. Complete job includes cost of material, taxes, skilled labour charges, to and fro charges etc. Complete Job. job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_992141.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid