Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
31 Aug 2026, 3:00 pm7d left
Sudipta Bose (EE/EL)
nbdd uttarkanya
Supply Installation Testing Commissioning of On-Grid rooftop solar PV plant include allied electrical works in Buniadpur Mahavidyalaya in the district of Dakshin Dinajpur.
2026_NBDD_1038264_2
NBDD/BS/EE /NIQ-16- (EL) of 2026-2027(SL No. 01 to 10)
Open Tender
Electrical Work/ Equipment
Item Rate
120 days
Dakshin Dinajpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹60,000
Yes
14 Aug 2026
14 Aug 2026
3 Sept 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines with DCR compliance, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of Mono/Poly Crystalline silicon solar cells module Make – Neosole / Waaree / Tata BP / Vikram Solar/ Adani /Panasonic/Novasys/HR Solar/Websol or equivalent as per the selection of the EIC) Submission of test report and warranty certificate from OEM for atleast 5 years is mandatory. Indigenously manufactured PV module with DCR (Domestic Content Requirement) compliance. Submission of test report and warranty certificate from OEM for atleast five years is mandatory. , net metering facility, necessary control, protections, earthing, cabling, mounting structure, junction boxes, power conditioning units, Real time online web interfaced Data Monitoring System, Distribution panels, grid connecting arrangement, conduits, pipes, cable trays and other accessories etc. as required. a) High Energy Efficiency Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 23% at STC with temperature coefficient of Pmax better than -0.30% per 0C. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 0C and +85 0C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module), I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF, name of test lab issuing IEC certificate. b)Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC with a variation of 10% at nominal voltage. Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 0C, Minimum IP-65 for outdoor and Minimum IP 21 for indoor, Built-in meter and data logger, MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP. PCU/inverter shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode. It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection. Minimum protections: Mains Under / Over Voltage, Over current, Over/Under grid frequency, Over temperature, Surge voltage induced at output due to external source, Short-circuit, Lightening, Anti Islanding (for grid synch. Mode) and other protections as per applicable standards. LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485 / RS 232. c) Module mounting structure: The roof top solar plant generation units shall be installed by using supporting Aluminium/Galvanized MS structure (mass of zinc coating shall be as per IS4759 ) having minimum head room clearance of 2.4 meter above the terrace level / ground level. The mounting structure would be designed to sustain wind load and seismic parameter of the site of installation. All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts. The suitable arrangements for maintenance and cleaning shall be provided.d) Real time online web interfaced Data Monitoring System complete with accessories for various parameters such as Solar Irradiance, temperature, AC Output Voltage and current, Output Power, Power factor, DC Input Voltage and Current, Time Active, Time disabled, Time Idle, Power produced and other parameters as per standard practices. e) Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminium /cast aluminium alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors(MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc. f) Lightning, surge voltage protection, earthing protection and grid islanding. g) Cables: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required. h) DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection-interconnection, etc. as required. i) Solar inverter of 25 KW in two no.s (Make Thea/Sungrow/Polycab/ABB as per the choice of EIC) | - | KWp | - | - |
| 2 | Wiring for circuit/ submain wiring along with earth wire with the following sizes of FRLS/HFFR PVC insulated copper conductor, single core cable ( Make Havells/Polycab/Standard/Kei) in surface/
recessed medium class PVC conduit as required.
2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire | - | Meter | - | - |
| 3 | 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire | - | Meter | - | - |
| 4 | Rewiring for light point/ fan point/ exhaust fan point/
call bell point with 1.5 sq.mm FRLS/HFFR PVC
insulated copper conductor single core cable (Make Havells/Polycab/RR Cabel) and 1.5
sq.mm FRLS/HFFR PVC insulated copper conductor
single core cable as earth wire in existing surface/
recessed steel/PVC conduit including dismantling as
required.Group C | - | Point | - | - |
| 5 | Supplying, installation, Testing & Commissioning of the integrated type solar PV lighting system on the existing pole structure, comprising of 30 watt, 6V Mono Passivated Emitter and Rear Contact (PERC) Solar Panel (minimum efficiency 21%), Pulse with modulation (PWM) Maximum Power point tracking (MPPT) charge Controller in the box with a sleek appearance and a sturdy structure, is weather-proof, and is simple to install, With Lithium- Iron Phosphate Battery (LiFePO4), charging time 8-10 hours, Battery backup time 12 hours (minimum), LED fixture watt 30 watt, Input voltage: 12V DC , Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%, IP-66,IK-08, CRI >70 , under voltage and over voltage protection, Electro Magnetic Interference (EMI) Electro Magnetic Compatibility (EMC) As per CISPER 15 A, lenses for beam angle as per Illuminating Engineering Society of North America (IESNA) type I/II/III as per the width of the road and the project requirement, Correlated Colour Temperature (CCT) 5700°K (As per American National Standard Institute (ANSI Bin)) , life time (LED,Driver & electrical circuitary) of 50K hours lamp buring hours till the 70 % of initial Lumen maintained as per LM80 extrapolation IES TM-21-11 report, automatic swich on/off, Alliuminium or Acrylonitrile Butadiene Styrene (ABS body), can be installed on a pole or wall. System lumen efficacy >150 lm/Watt output. LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted.. All as per pre approved by Engineer in-charge complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required, complete with mounting structure for the battery and accessories suitable for withstand wind storm speed as per the site location. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). 30 Watt (System lumen efficacy >150 lm/Watt) (Make Halonix/Havells/Orient Electric/Panasonic as per the choice of EIC) Submission of test report and warranty certificate from OEM for atleast 5 years is mandatory. | - | Nos | - | - |
| 6 | GI pipe as par IS/1239 ISI MARKED C Class(heavy) | - | Meter | - | - |
| 7 | Erection of RCC/ PCC pole of following length in brick
ballast and ramming the foundation, finishing with
150mm thick cement concrete (1:3:6) layer on top with
including excavation and refilling etc as required.
Above 4.5 Meter and upto 6.5 Meter | - | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2550511.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].