Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹2,200.03 (1.11%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
26 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
C/O Drain from House Of Nazakat to M.Akbar W7 at UROOSA Under ADP PRI for year 2026-27 , Block -PARANPILAN
2026_RDPR_319537_10
183/Xen/Rew/Bla/2026-27 Dated 05/08/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,000
4 Sept 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
26 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in trench excavation by manual in trenches for foundations, drains, pipes over areas (not 1.5 m in width ) including disposal of excavated earth lead upto 25 meters beyond 1m from cutting edge and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 31.86 | cum | - | - |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches including carriages of Stones.(Under foundation trench ) | 9.5 | cum | - | - |
| 3 | Providing and laying in position specified grade (1:3:6)of cement concrete including curing but excluding the cost of centering, shuttering, finishing t. All works upto plinth level | 18.05 | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundation footins, base of columns etc for mass concreter. | 69.68 | sqm | - | - |
| 5 | Providing 12mm mm plaster in 1:4 mix ratio ( 1cement : 4 fine sand) | 127.74 | cum | - | - |
| 6 | Carriage of materials from the approved sources to work site by mechnical | 26.1 | cum | - | - |
| 7 | Add cost of of sign board and photograph /Dewatering | 1 | Job | - | - |
stage.html
html • 0.02 MB
finance_1058927.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1058927.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .