Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹41.1 L+₹1,923.61 (0.05%)Rejected-Finance KOLLAMKUDI HOUSE MAHATMA NAGAR MOTHER THERESSA ROAD KALAMASSERI P O | KALAMASSERI | ERNAKULAM | KERALA | L2 | Rejected-Finance L2 | |
| 3 | L3₹41.1 L+₹3,031.32 (0.07%)Rejected-Finance 10 423 C KOZHIKODE BYPASS RAMANATTUKARA KOZHIKODE KERALA 673633 | KOZHIKODE | KOZHIKODE | KERALA | 673633 | L3 | Rejected-Finance L3 |
Tender Value
₹41.1 L
EMD Value
₹50,000
Closing Date
7 Mar 2022, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Manager (PED)
STEEL INDUSTRIALS KERALA LTD. ATHANI P.O THRISSUR- 680 581
Modular Refreshing Room for Gents and Ladies in KSRTC Bus Stand Munnar
2022_SILK_477950_1
SILK/PED/S-005/2021-22/301
Open Tender
Miscellaneous Works
Item Rate
25 days
Munnar
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
15 Mar 2022
25 Feb 2022
8 Mar 2022
25 Feb 2022
7 Mar 2022
25 Feb 2022
25 Feb 2022 - 7 Mar 2022
90 days
Amount
Modular Refreshing Room for Gents in KSRTC Bus Stand Munnar.
CIVIL WORK
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.6.5.1 : Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
13.48.1 : Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.85.3 : Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content.With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre
11.37 : Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
25.2 : Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin- Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to – 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr” 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.” 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml” 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm” 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test” Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000ml”
od264856/2021_2022 : Supplying and fixing 1500 mm x 1200 mm x 2300 mm modular Toilet main structure supporting column at corners is made out of GI 100x40 mm pipe 16 gage thick welded between the top and base frames fixed with foundation boult .The structural base frame work made out of 60x60 mm Pipe and GI 60 x 40, GI 60 x 40 as intermediate support both ways to support the flooring and layinf 600x600 mm vertified floor tiles .wall with 50mm thick PUF Wall STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 50 mm thick shall be supplied in 1 mtr roof Supply of 30mm thick PUF Roof STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 30 mm thick shall be supplied in 1 mtr width The structural Top frame work made out of 2mm thick GI 60 x 40 pipe as peripheral frame work and GI 60 x 40 & GI 40 as intermediate support at an interval 1 no of mirror 600x800 mm,1 no coat hook with necessary plumbing in each area with ISI mark PVC Pipe and 1 number od dust bin Tube light fitting 1 no, 1 no Exhaust fan, necessary electrical wiring and ISI mark db.Standard Size puff Panel door 1 Numbers (80x210 cm )..2 handles, 2 tower bolt, 2 L galvonasied GI vendilators with exhaust.galvonasied GI vendilators including all cost of materials conveyance laying labour charge etc complete As per the direction of departmental officers
od264891/2021_2022 : Supplying and fixing 1500 mm x 1200 mm x 2300 mm modular bath room cabin main structure supporting column at corners is made out of GI 100x40 mm pipe 16 gage thick welded between the top and base frames fixed with foundation boult .The structural base frame work made out of 60x60 mm Pipe and GI 60 x 40, GI 60 x 40 as intermediate support both ways to support the flooring and layinf 600x600 mm vertified floor tiles .wall with 50mm thick PUF Wall STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 50 mm thick shall be supplied in 1 mtr roof Supply of 30mm thick PUF Roof STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 30 mm thick shall be supplied in 1 mtr width The structural Top frame work made out of 2mm thick GI 60 x 40 pipe as peripheral frame work and GI 60 x 40 & GI 40 as intermediate support at an interval 1 no of mirror 600x800 mm,1 no coat hook with necessary plumbing in each area with ISI mark PVC Pipe and 1 number od dust bin Tube light fitting 1 no, 1 no Exhaust fan, necessary electrical wiring and ISI mark db.Standard Size puff Panel door 1 Numbers (80x210 cm )..2 handles, 2 tower bolt, 2 L- galvonasied GI vendilators with exhaust.galvonasied GI vendilators including all cost of materials conveyance laying labour charge etc complete As per the direction of departmental officers
od264914/2021_2022 : OD Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work including)
od264927/2021_2022 : Providing corrugated G.I. hard colour powder coated trafford sheet 0.4 mm thick roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces),excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
od264943/2021_2022 : Supplying and fixing P V C Septic tank 1000 ltr capacity ISI Model ,including all cost of materials conveyance laying labour charge etc complete as per the direction of Engineer in Charge
Modular Refreshing Room for Ladies in KSRTC Bus Stand Munnar.
CIVIL WORK
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.6.5.1 : Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
13.48.1 : Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.85.3 : Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile Organic Compound) content.With water thinnable cement primer on walls surface having VOC content less than 50 grams / litre
11.37 : Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
25.2 : Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including: b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment , including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holding glass. d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight. e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineerin- Charge. Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub-head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves ) on the external face shall be measured in sqm. up to two decimal places. Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payable separately. The NIT approving authority will decide the necessity of testing on the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NBL Certified laboratories 1. Performance Laboratory Test for Air Leakage Test (-50pa to – 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr” 2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.” 3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01-05 testing method for a range upto 2000 ml” 4. Structural Performance Deflection and deformation by static air pressure test (1.5 times desing wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm” 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test” Tests to be conducted on site 6. Onsite Test for Water Leakage for a pressure range 50 kpa to 240 kpa (35psi) upto 2000ml”
od265310/2021_2022 : Supplying and fixing 1500 mm x 1200 mm x 2300 mm modular Toilet main structure supporting column at corners is made out of GI 100x40 mm pipe 16 gage thick welded between the top and base frames fixed with foundation boult .The structural base frame work made out of 60x60 mm Pipe and GI 60 x 40, GI 60 x 40 as intermediate support both ways to support the flooring and layinf 600x600 mm vertified floor tiles .wall with 50mm thick PUF Wall STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 50 mm thick shall be supplied in 1 mtr roof Supply of 30mm thick PUF Roof STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 30 mm thick shall be supplied in 1 mtr width The structural Top frame work made out of 2mm thick GI 60 x 40 pipe as peripheral frame work and GI 60 x 40 & GI 40 as intermediate support at an interval 1 no of mirror 600x800 mm,1 no coat hook with necessary plumbing in each area with ISI mark PVC Pipe and 1 number od dust bin Tube light fitting 1 no, 1 no Exhaust fan, necessary electrical wiring and ISI mark db.Standard Size puff Panel door 1 Numbers (80x210 cm )..2 handles, 2 tower bolt, 2 L galvonasied GI vendilators with exhaust.galvonasied GI vendilators including all cost of materials conveyance laying labour charge etc complete As per the direction of departmental officers
od265311/2021_2022 : Supplying and fixing 1500 mm x 1200 mm x 2300 mm modular bath room cabin main structure supporting column at corners is made out of GI 100x40 mm pipe 16 gage thick welded between the top and base frames fixed with foundation boult .The structural base frame work made out of 60x60 mm Pipe and GI 60 x 40, GI 60 x 40 as intermediate support both ways to support the flooring and layinf 600x600 mm vertified floor tiles .wall with 50mm thick PUF Wall STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 50 mm thick shall be supplied in 1 mtr roof Supply of 30mm thick PUF Roof STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 30 mm thick shall be supplied in 1 mtr width The structural Top frame work made out of 2mm thick GI 60 x 40 pipe as peripheral frame work and GI 60 x 40 & GI 40 as intermediate support at an interval 1 no of mirror 600x800 mm,1 no coat hook with necessary plumbing in each area with ISI mark PVC Pipe and 1 number od dust bin Tube light fitting 1 no, 1 no Exhaust fan, necessary electrical wiring and ISI mark db.Standard Size puff Panel door 1 Numbers (80x210 cm )..2 handles, 2 tower bolt, 2 L- galvonasied GI vendilators with exhaust.galvonasied GI vendilators including all cost of materials conveyance laying labour charge etc complete As per the direction of departmental officers
od265373/2021_2022 : "Supplying and fixing 1500 mm x 1200 mm x 2300 mm modular DREASSING room cabin main structure supporting column at corners is made out of GI 100x40 mm pipe 16 gage thick welded between the top and base frames fixed with foundation boult .The structural base frame work made out of 60x60 mm Pipe and GI 60 x 40, GI 60 x 40 as intermediate support both ways to support the flooring and layinf 600x600 mm vertified floor tiles .wall with 50mm thick PUF Wall STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 50 mm thick shall be supplied in 1 mtr roof Supply of 30mm thick PUF Roof STRUPAN panel made out of Inner and outer in TRYPIZOIDAL AND MICRORIBED PPGI sheet with CFC free pentane Blown polyurethane foam as the core which is injected between the 2 sheets with highly sophisticated computer controlled foaming machine. The panel is manufactured by using continuous foaming method. STRUPAN PUFF --PANEL PREFABRICATED Polyurethane sandwich panels comprising of exterior and Interior with micro ribs and 1000 mm cover width made out of 0.5 MM PPGI RMP 240MPA /0.5 mm PPGI RMP 240 MPA color coated galvanized steel, 120 GSM Zinc coating with 20 microns polyester paint. Core - CFC / HCFC free Pentane Blown Polyurethane foam density of 40 Kg / m3 in 30 mm thick shall be supplied in 1 mtr width The structural Top frame work made out of 2mm thick GI 60 x 40 pipe as peripheral frame work and GI 60 x 40 & GI 40 as intermediate support at an interval 1 no of mirror 600x800 mm,1 no coat hook with with 1 number od dust bin Tube light fitting 1 no, 1 no Exhaust fan, necessary electrical wiring and ISI mark db.Standard Size puff Panel door 1 Numbers (80x210 cm )..2 handles, 2 tower bolt, 2 L- galvonasied GI vendilators with exhaust.galvonasied GI vendilators including all cost of materials conveyance laying labour charge etc complete As per the direction of departmental officers<br>"<br><br><br>
od265312/2021_2022 : OD Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work including)
od265313/2021_2022 : Providing corrugated G.I. hard colour powder coated trafford sheet 0.4 mm thick roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces),excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
od265314/2021_2022 : Supplying and fixing P V C Septic tank 1000 ltr capacity ISI Model ,including all cost of materials conveyance laying labour charge etc complete as per the direction of Engineer in Charge
SHAHEER K A
High Rise Builders and designers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .