| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹34.5 L+₹6.3 L (22.1%)Accepted-AOC NULL | ₹34.5 L+₹6.3 L (22.1%) | L2 | Accepted-AOC Work awarded |
| 2 | L3₹35.7 L+₹7.5 L (26.4%)Accepted-AOC SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹35.7 L+₹7.5 L (26.4%) | L3 | Accepted-AOC Second lowest |
| 3 | L1₹28.3 LRejected-Finance | ₹28.3 L | L1 | Rejected-Finance Non exemption granted to MSMEs regarding EMD as per order G.O.P. 1. 2021. Fin. TVM dated 3.1.2021 and no registration certificate as a category contractor |
Tender Value
₹34.7 L
EMD Value
₹50,000
Closing Date
16 Nov 2021, 4:00 pmClosed
Executive Engineer
Regional Investigation and Quality Control Laboratory, Kozhikode
All investigation works for the proposed two roads in Kozhikode
2021_PWD_452517_1
D1/Tender-06/INV/KKD/2021-22
Open Tender
Civil Works - Others
Item Rate
45 days
Kozhikode
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹50,000
Yes
22 Jan 2022
10 Nov 2021
18 Nov 2021
10 Nov 2021
16 Nov 2021
10 Nov 2021
Amount
Appendix A - Panniyankara - Pantheerankavu Road (Length 8 kms)
56.13: Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points
56.12.b: Total Station Surveying for taking detailing in heavily built up area or in roads with heavy traffic or in thick vegetation for taking ID points of roads centre, road edges, kerbs, drain, compound wall, electric post, trees, CD works, RoW, Gail pipeline bounndary ,Buildings Monuments,Religious structures at an average of 1 per 10m2 etc for a land width as specified including providing necessaryroad flags, temporary barricade and caution board etc including all necessary traffic safety measures and processing, preparation of drawings in AUTOCAD with various details in different layers and submission of finished drawings with x, y, z coordinates ensuring all objects, break lines and spot levels, topographic survey data for creation of DTM of the surveyed corridor compactible with road design softwares like MX ROAD, AUTOCADCIVIL 3D, submission of detailed survey data in MS EXCEL. dxf, .sdr format - and all other relevant data in hard copy and soft copy and as directed by the engineer at site. For road, Junction, Additional for Bridge & new proposals
Traffic Survey
Observed Data - 2 Turning movement survey at THREE ARM Junction Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision forengaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Observed Data - 3 Turning movement survey at FOUR ARM Junction Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Observed Data - 4 O D Survey Conducting origin destination survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Appendix B - Ramanattukara- Vattakkinar Road (Length - 12 kms)
Observed Data - 5 Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
Observed Data - 6 Conducting Soil Classification test, Standard Proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample
Observed Data -7 Conducting one test consisting of taking deflection at 10points at 50m interval on one km stretch according to specification given in 81-1997, number of test conducted is as directed by the engineer in charge- conducting laboratory test to get moisture content and soil classification as per IS standards - For arranging equipment for testing 1km test taking one and half hour - Calculating Charecteristic deflection of one test from one test data obtained from part 1 ( one test data means comprising of taking deflecton at 10 points at 50m interval in 1km stretch according to the specification given in IRC81-1997) and submitting in hard and soft copy.
Observed Data -8 Study of pavement composition by cutting open pit at tar edge to get the details of layers (thickness and type ) of pavement composition - at one location as suggested by the engineer in charge carefully by excavating pit of area 1.00x 0.60m through overlaying bituminous and granular layer including BC, DBM/BM, WMM and GSB at tar edge and refilling and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layers
56.12.b: Total Station Surveying for taking detailing in heavily built up area or in roads with heavy traffic or in thick vegetation for taking ID points of roads centre, road edges, kerbs, drain, compound wall, electric post, trees, CD works, RoW, Gail pipeline bounndary ,Buildings Monuments,Religious structures at an average of 1 per 10m2 etc for a land width as specified including providing necessaryroad flags, temporary barricade and caution board etc including all necessary traffic safety measures and processing, preparation of drawings in AUTOCAD with various details in different layers and submission of finished drawings with x, y, z coordinates ensuring all objects, break lines and spot levels, topographic survey data for creation of DTM of the surveyed corridor compactible with road design softwares like MX ROAD, AUTOCADCIVIL 3D, submission of detailed survey data in MS EXCEL. dxf, .sdr format - and all other relevant data in hard copy and soft copy and as directed by the engineer at site. For road, Junction & Additional for Bridge
Traffic Survey
Observed Data - 2 Turning movement survey at THREE ARM Junction Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision forengaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Observed Data - 3 Turning movement survey at FOUR ARM Junction Conducting turning movement survey at junction for one day for peak hours (7am to 11 am and 3.30 pm to 7.30 pm) by recording the classifed volume count in the prescribed format, including provision for engaging technicians and setting up of station etc and compiling the data and submitting the same in hard and soft copy etc. complete as per the instructions of PWD officials
Sub Soil Investigation
56.1.a: Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work. For machine boring (For 8 boreholes)
56.17.1: Providing access to the site, clearing site and making good for erecting and conducting soil testing tranfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing For Culverts, Farook Bridge & Mini Bridge
56.2.a: Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location. For Culverts, Farook Bridge & Mini Bridge
56.3.a.1: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals In Land - Culverts, Farook Bridge & Mini Bridge
56.3.a.2: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals Under water - Farook Bridge
56.3.b.1: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. In Land - Farook Bridge & Mini Bridge
56.3.b.2: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. Under water - Farook Bridge
56.3.c.1: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. In Land - Farook Bridge & Mini Bridge
56.3.c.2: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. Under water - Farook Bridge
56.3.d.1: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 35m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. In Land - Farook Bridge & Mini Bridge
56.3.d.2: Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 35m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals. Under water - Farook Bridge
56.9.1: Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required) Farook Bridge
56.10: Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc. Farook Bridge
56.5.a: Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit In land - Culverts, Farook Bridge & Mini Bridge
56.5.b: Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit In water - Farook Bridge
56.4: Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. Farook Bridge & Mini Bridge
56.7: Conducting standard penetration test in bore hole at any depth. Culverts, Farook Bridge & Mini Bridge
56.8: Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. Culverts, Farook Bridge & Mini Bridge
56.6: Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.(at every 3 m interval) (Undisturbed soil samples (UDS) shall be obtained at every 3.0 m interval starting from 1.0 m in all type of soil along the bore depth up to SPT 'N' values of less than 50. Sampler shall be 75 mm/100 mm internal diameter and generally 450 mm long. Thin walled open drive sampler shall be used in cohesive strata. This sampler shall be made of seamless steel. Sampling shall be done as soon as possible after the clean-out operation. Area ratio of the sample must restrict to 20% for stiff formations & 10% or less for soft sensitive clays as per IS 1892-1979.)(8*11) Farook Bridge & Mini Bridge
56.11.a: Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) Machine boring for 5 bore holes.
56.11.c: Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) Additional set for machine boring(extra for bore holes exceeding 5 nos)
56.15.a: Hydraulic and velocity calculation(MFL,OFL,LWL,HTL,LTL) Farook Bridge
56.15.b: Hydraulic and velocity calculation(MFL,OFL,LWL,HTL,LTL) Culverts & Mini Bridge
56.14.a: Cross section details. Farook Bridge
56.14.b: Cross section details. Culverts & Mini Bridge
G S Infrastructure
AA AND S CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_646722.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .