Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹78.1 L+₹30,425.50 (0.39%)Rejected-AOC | L2 | Rejected-AOC Accepted |
Tender Value
₹70.7 L
EMD Value
₹50,000
Closing Date
18 Jun 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER OPWD ROADS DIVISION KOTTAYAM
RM 2022-23Cluster II One year RC Zone I One year Running Contract for various PWD Roads under Road Section Ettumanoor in Kottayam district 9 road stretches for a length of 46.58 km
2022_PWD_494527_1
PWD/RB/TR/7766/2022_5_1_1/RC 1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Ettumanoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
27 Sept 2022
13 Jun 2022
20 Jun 2022
13 Jun 2022
18 Jun 2022
13 Jun 2022
60 days
Amount
Appendix A - Reactive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67579/2022-2023:Mix seal surfacing:-Providing laying and rolling close -graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.90mm(Type -A) or 13.2mm to 0.90mm (Type-B) aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per technical specification Clause 509 of MORTH
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
Appendix B - Premonsoon works
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>
55.15:Refurbishment of existing signboards<br>Refurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD67580/2022-2023:Engaging man mazdoor for clearing drain, culvert and other miscellaneous items
OD67581/2022-2023:Engaging wood cutter for cutting branches of trees and removing debris from premises
OD67582/2022-2023:Engaging hydraulic excavator for removing deposited materials during monsoon season in road way and other emergent nature works for restore traffic
OD67583/2022-2023:Engaging Tipper 5.5 cum capacity from conveying the silt removed
Appendix C - Proactive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67584/2022-2023:Mix seal surfacing:-Providing laying and rolling close -graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.90mm(Type -A) or 13.2mm to 0.90mm (Type-B) aggregate using penetration grade bitumen to required line,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per technical specification Clause 509 of MORTH
OD67585/2022-2023:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 30 bags of 25 kg ready mix compound will be laid in potholes in a day
5.12.a:Providing and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. Fog Spray
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
OD67605/2022-2023:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
OD67592/2022-2023:Engaging labour with passenger not less than 1000cc for conducting and reporting routine inspection up to 20 KM per day for the entire length of project road at frequency of 7 days throughout the agreement period of running contract as directed by the departmental officers
Appendix D - Emergency works
OD67587/2022-2023:Engaging man mazdoor for clearing drain, culvert and other miscellaneous items
OD67588/2022-2023:Engaging wood cutter for cutting branches of trees and removing debris from premises
OD67589/2022-2023:Engaging hydraulic excavator for removing deposited materials during monsoon season in road way and other emergent nature works for restore traffic
OD67590/2022-2023:Engaging tipper for removing the deposited unwanted materials and earth in road way during monsoon .
8.45:Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001
OD67591/2022-2023:Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation to site etc. complete rate is arrived for a bag of 25kg Assuming a average of 30 bags of 25 kg ready mix compound will be laid in potholes in a day
MATHEW JOSEPH
Bidder Name
MATHEW JOSEPH
Toney Augustine
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .