Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance | ₹1.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Al Buraaq Engineering Services L2 | MS FALCON TECHNOCRATES L1 |
|---|---|---|---|---|---|
| 1.00Detailed Route Survey including Preparation of Line Profile, Tower Schedule and Route Map for Diversion of 132kV Zainakote-Wanganpora Transmission Line Near Shalteng for Construction of Fly Over at Shalteng Srinagar In Kashmir Valley incl. of all taxes, freight, T&P, etc complete in all respects. | |||||
| 2.00 | Surveying / Line route survey, detail survey including check survey, jungle clearance & fixing of markers for plain terrain for Diversion of 132kV Zainakote-Wanganpora Transmission Line Near Shalteng | 1 | Job | 49,000 ₹49,000 | 1,10,000 ₹1.1 L |
| 3.00 | Soil Investigation at different Tower Locations for the Diversion of 132kV Zainakote-Wanganpora Transmission Line Near Shalteng for Construction of Fly Over at Parimpora, Srinagar In Kashmir Valley. (D C Work) by way of Drilling of Bore hole in Rock/ Boulder Substrata using Diamond Machine, Collection of Disturbed/Undisturbed Samples ,their complete laboratory analysis ,Preparation of Bore Hole Logs and evaluation of Safe Bearing Capacity ,Conducting Stranded Penetration Tests (SPT) at desired interval .Collection of Samples ( Rock Core Samples) in Core Boxes 0-20 Meters including Shifting of men and machinery for the purpose. preparation and submission of Detailed Technical Report. (Complete Job) | 4 | No. | 15,000 ₹60,000 | 1,000 ₹4,000 |
| 4.00 | Preparing / submitting of detailed line Route Profile and Soil Investigation Report in 3 copies including cost of stationary etc | 1 | Job | 40,000 ₹40,000 | 20,000 ₹20,000 |
Updated dates
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
18 Dec 2025, 1:00 pmClosed
Executive Engineer TLMD-VIII, Srinagar
Office of the Executive Engineer TLMD-VIII, Srinagar
Detailed Route Survey including Preparation of Line Profile, Tower Schedule and Route Map including soil testing for Diversion of 132kV Zainakote Wanganpora Transmission Line Near Shalteng for Construction of Fly Over at Shalteng, Srinagar In Kashmir
2025_PDD_293084_1
TLMD-8/TS/09 of 2025
Open Tender
Survey and Investigation Services
10 days
SHALTENG
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Executive Engineer TLMD-VIII, Srina
₹3,000
5 Feb 2026
25 Oct 2025
19 Dec 2025
27 Oct 2025
18 Dec 2025
27 Oct 2025
27 Oct 2025 - 10 Dec 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.69 MB
Tender Documents
Tender Documents • 1.04 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid