Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC VILL SUBHAS PARK KHOWAI KHOWAI TRIPURA | KHOWAI | TRIPURA | 799201 | L1 | Accepted-AOC The rate quoted by the L1 bidder is reasonable comparing to present market rate | |
| 2 | L2₹36.9 L+₹2.2 L (6.37%)Rejected-Finance FULTALIBAZAR CHAMPAHOUR | CHAMPAHOUR | KHOWAI | TRIPURA | L2 | Rejected-Finance The bidder has quoted the rate higher than L1 bidder | |
| 3 | L3₹37.1 L+₹2.4 L (6.94%)Rejected-Finance MOHARCHERRA TELIAMURA KHOWAI TRIPURA | L3 | Rejected-Finance The bidder has quoted the rate higher than L1 bidder | |
| 4 | L4₹38.6 L+₹3.9 L (11.3%)Rejected-Finance | L4 | Rejected-Finance The bidder has quoted the rate higher than L1 bidder | |
| 5 | L5₹41.5 L+₹6.8 L (19.7%)Rejected-Finance MADHYA SINGHICHERRA KHOWAI DIST KHOWAI TRIPURA | KHOWAI | TRIPURA | 799201 | L5 | Rejected-Finance The bidder has quoted the rate higher than L1 bidder |
Tender Value
₹44.6 L
EMD Value
₹44,612
Closing Date
12 Apr 2022, 3:00 pmClosed
The Executive Engineer DWS Division Kalyanpur
O/O The Executive Engineer DWS Division Kalyanpur
Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Tulashikhar (Gr-III) (2nd call).
2022_CEDWS_27375_1
155/EE-KLP/PWD(DWS)/21-22(2nd)
Open Tender
Civil Works - Water Works
Percentage
60 days
Tulashikhar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹44,612
14 Sept 2022
26 Mar 2022
13 Apr 2022
28 Mar 2022
12 Apr 2022
28 Mar 2022
eProcurement System of Government of Tripura Created By: Anurupa Debbarma Created Date/Time: 19-Apr-2022 05:32 PM Tender Title: Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Tulashikhar (Gr-III) (2nd call). Tender ID: 2022_CEDWS_27375_1
Tender Inviting Authority:
Name of Work: Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 & 2022-23 under JJM under DWS Sub Division Tulashikhar (Gr-III)(2nd call).
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 BISHU CHARAN BISWAS(GSTN-16AQSPB2556J1ZM) 4461160.00 -16.91 3706777.84 Thirty Seven Lakh Six Thousand Seven Hundred and Seventy Seven
2.00 RATAN CHANDRA SUKLA DAS(GSTN-16CVLPS2049R1ZO) 4461160.00 -13.52 3858011.17 Thirty Eight Lakh Fifty Eight Thousand Eleven
3.00 SURAJ BHATTACHARJEE(GSTN-NA) 4461160.00 -7.00 4148878.80 Fourty One Lakh Fourty Eight Thousand Eight Hundred and Seventy Eight
4.00 PRATIK DEBBARMA(GSTN-NA) 4461160.00 -22.30 3466321.32 Thirty Four Lakh Sixty Six Thousand Three Hundred and Twenty One
5.00 ARUN DEBBARMA(GSTN-NA) 4461160.00 -17.35 3687148.74 Thirty Six Lakh Eighty Seven Thousand One Hundred and Fourty Eight
Lowest Amount Quoted BY: PRATIK DEBBARMA(3466321.32)
BOQ Summary Details Tender Title: Construction of 09(nine) nos Small Bore Deep Tube Well including extension of pipeline, FHTC with post and platform as per AAP 2020-21, 2021-22 and 2022-23 under JJM under DWS Sub Division Tulashikhar (Gr-III) (2nd call). Tender ID: 2022_CEDWS_27375_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 PRATIK DEBBARMA 3466321.32 L1
2 ARUN DEBBARMA 3687148.74 L2
3 BISHU CHARAN BISWAS 3706777.84 L3
4 RATAN CHANDRA SUKLA DAS 3858011.17 L4
5 SURAJ BHATTACHARJEE 4148878.80 L5
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_27779.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .