| Sl No | Description | Qty | Unit | arjun L1 | K.G. Somasundaran L2 | SREEKUMARAN V L3 |
|---|---|---|---|---|---|---|
| 1.00Culvert,side wall & allied works | ||||||
| 1.00 | 60.1.2 RING BUND Type II Putting up ring bund with earth fille gunny bags of top width
1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form
ring bund and maintaining the same leak proof till the completion of the work and
clearing the site by dismantling the bund after completion of the work.etc.complete. | 85 | metre | 1,418.09 ₹1,20,537.65 Lowest | 1,446.45 ₹1,22,948.25 | 1,474.81 ₹1,25,358.85 |
| 1.00 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 446.66 | cum | 359.72 ₹1,60,672.54 Lowest | 366.91 ₹1,63,884.02 | 374.11 ₹1,67,099.97 |
| 1.00 | 60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 400 | hour | 455.82 ₹1,82,328 Lowest | 464.95 ₹1,85,980 | 474.06 ₹1,89,624 |
| 1.00 | 2.3.1 Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50 m and lift up to 1.5 m :All kinds of soil | 227.04 | cum | 681.44 ₹1,54,714.14 Lowest | 695.07 ₹1,57,808.69 | 708.7 ₹1,60,903.25 |
| 1.00 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 28.2 | cum | 7,932.89 ₹2,23,707.5 Lowest | 8,091.55 ₹2,28,181.71 | 8,250.21 ₹2,32,655.92 |
| 1.01 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 245.99 | cum | 9,235.97 ₹22,71,937.79 Lowest | 9,420.69 ₹23,17,376.69 | 9,605.41 ₹23,62,815.6 |
| 1.01 | 5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 69.06 | cum | 12,772.18 ₹8,82,046.75 Lowest | 13,027.62 ₹8,99,687.44 | 13,283.07 ₹9,17,328.81 |
| 1.01 | 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 476.36 | sqm | 839.6 ₹3,99,951.86 Lowest | 856.39 ₹4,07,949.94 | 873.18 ₹4,15,948.02 |
| 1.01 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 14,393.7 | kgm | 112.43 ₹16,18,283.69 Lowest | 114.68 ₹16,50,669.52 | 116.93 ₹16,83,055.34 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
14 Oct 2025, 4:00 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
GENERAL-PUDUR GP-Pro.No347/2025-26 -Annual Plan - Construction of Swarnna Ghadha Culvert and Allied Works, Palakkad District-General Civil Work
2025_KEL_806509_1
KRO/BDC/2169/2025
Open Tender
Civil Works - Others
Item Rate
KEL MAMALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
16 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
7 Oct 2025 - 14 Oct 2025
Amount
Culvert,side wall & allied works
60.1.2 RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.3.1 Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50 m and lift up to 1.5 m :All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6 PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
60.5.1 DOWEL BARS - Supplying and providing MS dowel bars of size 20 mm dia , 1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
16.Rigid PVCPipes/Casing & Capping - A-ONE/REPUTED MAKE with ISI , Precession, Balco, GEO
K.G. Somasundaran (BID ID -2386039)
SREEKUMARAN V (BID ID -2387070)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .