Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Repairing/Renew of Breakdown MH and P/L /Repairing Drainage line At Sabarmati Area, Motera Area, Nursery Area, D mart Area And Different Places Of Ward in Sabarmati wrad, WZ. (A.R.C)
338545
2/26-27 (T.N.36)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹30,000
25 Aug 2026
25 Aug 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
Name of Work:-Repairing/Renew of Breakdown MH and P/L /Repairing Drainage line At Sabarmati Area,
Motera Area, Nursery Area, D mart Area And Different Places Of Ward in Sabarmati wrad, WZ. (A.R.C)
I.No. Qty. ItemDescription Rate Per Amount
1 Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified.(GWSSB SOR 2022-23 Item
No.1 Page No.32)
A 190.00 Upto1.50 mt depth 89.00 Cmt
B 190.00 1.5 mt to 3 mt depth 98.00 Cmt
C 150.00 3.00 mt to 4.50 mt depth 103.00 Cmt
D 70.00 4.50 mt to 6.00 mt depth 109.00 Cmt
2 Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet,metal,soiling /cutting reinforcement
etc.comp. with stacking the material as directed.
(based on previously approved rate by CE sir SOR
A 100.00 up to 0.20 meter thickness (By Manual) 71.42 Smt
B 25.00 Up to 0.30 meter (By any type of Breaker Machine Smt
or R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete.
C 25.00 0.30 meter & above (By any type of Breaker Smt
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
3 Refilling the pipeline trencheds incl. ramming,
watering, consolodatingdesposal of surplus stuff as
directed within a radius of 3 km. (GWSSB SOR
2022-23 Item No.14 Page No.40)
A 313.54 Refilling as directed 22.00 Cmt
B 140.00 --do-- with selected soil brought from outside Cmt
including all lead
4 270.00 Conveyance charge of earth,lime,murrum, building Cmt
rubbish,manualgarbage,sludge ,excavatedrock,fly
ash, aggregate of any kind etc. comp. up to 5Km.
lead (Based on Building SOR 2015-16, P-589 -
Item code- 3.2.1)
5 Providing and supplying ISI marked only standard
length Stonewate pipes in standard lengths of
following class and diameter including all
taxes,insurance, transportiton, fright charges,
octroi,inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
complete (IS - 651 - 1989) (GWSSB SOR 2022-23
Item No.11.1 Page No.17)
6 Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment
at all level as directed by Engineer-in- charge
including conveyance from stone to site of work,
Jointing material etc.comp.(GWSSB SOR 2022-23
Item No.11.2 Page No.17)
7 Providing and supplying ISI Standard RCC pipes
(of sulphate resisting Cement )in standard lengths
of following class and diameter suitable for rubber
ring joints (socket and spigot) including all
taxes,insurance,
transportation,treightcharges,octroi,inspection
charges, loading,unloading, conveyance to
departmental stores, stacking etc. complete
(GWSSB SOR 2022-23 10.1.D Page No.15) Class
NP3 Test pressure 0.7 Kg/Sq.Cm
A 150.00 300 mm dia 755.00 Rmt
B 70.00 450 mm dia 1361.00 Rmt
C 0.00 500 mm dia 1485.00 Rmt
D 40.00 600 mm dia 1986.00 Rmt
8 Lowering, laying and jointing R.C.C. pipes in
C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as
directed by Engineer-in- charge including
conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code. (GWSSB
SOR 2022-23 11.2 Page No.39)
A 150.00 300 mm dia 119.00 Rmt
B 70.00 450 mm dia 171.00 Rmt
C 0.00 500 mm dia 189.00 Rmt
D 40.00 600 mm dia 228.00 Rmt
9 Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement
slurry, Brick masonary in CM 1:5 & excluding the
cost of chamber seat cover etc..completed. (Based
on Drainage SOR 2009-10)
A 4.00 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 2261.60 No
0.90meter for pipe dia<=150 mm.
B 11.00 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 2874.11 No
0.90meter for pipe dia<=20 mm.
C 17.00 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 3905.36 No
to 1.20 meter for pipe dia<=20 mm
10 Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling, Brick
Bats Cement Concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside &
outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.SteelHdpe
Coated Steps 35 Cm C/C At 35 Cm Staggered
Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X
Meter (Inside Clear, M.H. length should be parallel
to the flow) (Based on Drainage SOR 2009-10)
A 10.00 1.00 to 2.00 meter depth, (Slab at Ground level) 5651.78 No
(for pipe dia<=230 mm)
B 12.00 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. 11395.54 No
From G.L.) (for pipe dia<=300 mm)
11 10.00 Rate reduction over item of Constructing Slab Type 460.71 DM
M.H. Chamber of size 1.00 x 0.75 mt for
constructing slab @ depth more than 0.60 mt below
Ground Level (Max. 3 unit of DM should be
reduced in this item) (As Per R.A. Based on
Building SOR 2015-16)
12 Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
15 mm thick cement plaster inside & outside (Only
for shaft) in CM 1:3, finishing with cement slurry,
P/F 4 mm diaM.S.Steel HDPE coated steps 35 cm
c/c at 35 cm staggered in masonary CM 1:5, RCC
Slab in CC 1:1.5:3 of thickness 23 C.M., including
Cantering & reinforcement (double jalli at 15 C.M.
c/c bothway 12 mm dia.) but excluding the cost of
Manhole seat cover etc..completed. of Size 1.00 X
1.40 meter (Inside Clear, M.H. length should be
parallel to the flow, for pipe dia<= 800 mm) (Based
on Drainage SOR 2009-10)
A 25.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No
B 5.00 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. 19258.04 No
C 5.00 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. 26867.86 No
D 1.00 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. 44050.00 No
E 1.00 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. 66632.14 No
13 Extra rate over item of Constructing Slab Type M.H.
Chamber of following size for constructing M.H.
Chamber, per 1.00 Decimetre of additional depth or
part thereof. etc. complete. Of size 1.00 x 1.40 mt.
(inside clear) and Depth from (Based on Drainage
A 2.00 4.00 to 5.00 meter depth, 521.42 DM
B 2.00 6.00 to 7.00 meter Depth 536.60 DM
C 2.00 8.00 to 9.00 meter Depth 551.78 DM
D 2.00 9.00 to 10.00 meter Depth 564.28 DM
14 2.00 Rate reduction over item of Constructing Slab Type 586.60 DM
M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for (
MH 2 to 3 mt depth) and 1.0 mt for (MH above
mt depth) below Ground Level (Max. 5 unit of DM
should be reduced in this item) ( As Per R.A Based
on Building SOR 2015-16)
15 Dismantling of existing Arch type manhole up to
Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and &
finished 15 mm thick cement plaster inside in CM
1:3, P/F 4 mm diaM.S.Steel HDPE coated steps
cm c/c at 35 cm staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3, including Cantering
& reinforcement as directed by engineer in charge.
Rate includes carting of debris and excavated soil
(Based on Drainage SOR 2009-10)
A 10.00 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 5892.85 No
15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
B 5.00 1.00 x 0.75 mt (inside clear) RCC Slab of 8883.92 No
thickness 15 C.M& reinforcement (Single jalli at
C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth
(Slab at below 1.00 mt. From G.L.)
C 5.00 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 8080.35 No
23 CM &reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mtdepth (Slab at
D 5.00 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 17008.93 No
23 CM &reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)
E 5.00 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 24776.79 No
23 CM &reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
below 1.00 mt. From G.L.)
16 5.00 Provdg. & laying S.W. Gully trapwith brick 735.00 No
masonry chamber &water tightG.T.Stoneincluding
fixing of cover Square mouth trap 100 mm x100
mm size P-Trap ( Based on Building SOR 2015-
16, P-279 Item code- 24006B)
17 Making connectionto the ex. M.H.in
runningsewer incl. Dewatering and other required
machinery etc. of followingdia pipes at any
convenient time. All damaged work shall be well
repaired as per instructions. etc..complete. (Based
on Drainage SOR 2009-10)
A 20.00 150 mm to 300 mm dia. 1339.28 No
B 4.00 400 mm to 600 mm dia. 2232.14 No
18 Cutting the pipes of following dia coming in the new
M.H.in running sewerincluding cuttingbars,
including removing debris /silt from the M.H. and
carting at a suitable distance etc..complete as
directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect.
(Based on Drainage SOR 2009-10)
A 15.00 150 mm to 300 mm dia. 1133.92 No
B 7.00 400 mm to 600 mm dia. 1687.50 No
19 Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps andexisting
MHsheet cover, removingthe debrisfrom MHand
cartingthe sameas directed. (Based on Drainage
A 25.00 up to 0.15 mt. (@ Two Coarse) 732.14 No
B 25.00 up to 0.35mt. (@ Four Coarse) 1160.71 No
C 80.00 up to 0.65 mt. (@ Seven Coarse) 1794.64 No
D 60.00 up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
20 40.00 Repairing damaged I.C./ Raising removing 401.78 No
damaged brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing chamber sheet cover,
removing the debris from chamber and cartingthe
sameas directed. (Based on Drainage SOR
21 RCC Precast M.H.Frame& Cover Manufacture ,
supply & Delivery at store or at side of work Precast
RCC M200 Frame & Cover Suitable to drainage
M.H. and as per type design & Drawing including
cost of reinforcement M.S. Angles or Flat , cutting
mold work etc.(GWSSB SOR 2022-23 10.4 Page
1 25.00 Frame Suitable for 50 Cm opening of MH 1121.00 No.
2 25.00 Cover Suitable for 50Cm Opening Of MH 1173.00 No
1 3.00 Frame Suitable for 50 Cm opening of MH 1000.00 No.
2 3.00 Cover Suitable for 50Cm Opening Of MH 1066.00 No
C House connection Chamber Light Duty
2 25.00 Cover 920.00 No
22 5.00 Carting and Fixing M.H. Chamber or CatchpiteSeat 750.00 No
and Cover in line and level to match exisisting road
level in CC 1:2:4 and finishing smooth, watering
and protecting for 7 days etc.complete as
directed. M.H. seat cover will be supplied
byA.M.C.(from any store) (Based on Drainage
23 Providing Kachha of Pakka Dummy in the
followingdiapipes andremoving thesame
aftercompletion of the connection workas
directed. (Based onDrainage SOR 2009-10)
A 5.00 (A) 100 mm to 300 mm dia. 199.10 No
B 5.00 (B) 350 mm to 600 mm dia 302.67 No
24 5.00 Providing and fixing cast iron manhole frame of 71.42 Kg
weight 80 to 85 kg suitable for existing EHD-35
FRC MH cover, rate also incl. loading, unloading
and fixing the frame in line and level to match
exisisting road level in CC 1:2:4 and finishing
smooth, watering and protecting for 7 days etc.
complete as per instruction by engg. in charge.
(Approved Rate)
25 0.00 Raising of Existing manhole item includes,cutting of 6830.35 No
existing road surround by Manhole by diamond
cutter machine dismantling of road in confined area
by breaker machine and carting of
dismantalmaterial.item also included necessarey
brick work to raise the manhole at road level in CM
1:3 item also included fixing of Manhole frame at
exact road level by using MaserEmaco S
trowable fibre reinforced thixotropic repair mortal
material Laying of concrete made form Master
Emaco 5 346 flowable micro concrete material in
desired thickness and laying of hot bitumanous
material in Upper layer and compaction of hot
bitumanious material by palte compactor machine
.Rate also included necessary plaster at inside of
manhole in CM 1:3 in 20 MM thickness on raised
26 5.00 Brickwork using common burnt clay building bricks 2872.00 Cmt
having crushing strength notless than 35kg./Sq.Cm.
in foundation and plinth in Cement Mortar 1:5 (1-
Cement:5-finesand) (B) Conventional (upto 10 ton)
(Based onBuilding SOR 20015-16)
27 Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris
from trench back filling etc. comp. as directed by
Eng.in charge.(Based on Building SOR 2015-16)
A 170.00 Mazdoor at day /Night 292.86 No
B 65.00 Makadam/ supervision at day / Night 310.71 No
28 20.00 Providing Dead Cantering using good quality 312.50 Smt
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed.
29 30.00 Providing 15mm thick cement plaster in single coat 141.30 Smt.
on Rough (Similar)side of single or half brick walls
for interior plastering upto floor two level and
finished even and smooth in (i) Cement mortar 1:3
(1- cement:3-sand) finishing with a floating coat of
neat cement slurry.(I.No.17.6 + 17.69 R & B SOR
30 1.00 Supplying cutting, bending, binding and placing in 73398.00 MT
position steel as per plan and design and as per IS
2502 including cost of steel and binding wire for
reservoirs/ structures only including lift up to
meter height or depth below GL for all diameters
(GWSSB SOR 2021-22) TMT bars Fe-415 grade
for alldiameters
31 1.00 Providing and laying cement concrete work 1:2:4 3327.00 Cmt
(1-Cement:2-Coarsesand:4-graded stone
aggregates 20mm nominal size) and curing
complete excluding cost of formwork and rein for
cement for reinforced concrete work in
(A)Foundations,footings,Base or columns and
Mass concrete (upto 10 ton) (Based onBuilding
32 20.00 Providing and installation of barricading with retro- 654.91 Rmt
reflective paint/ film/ tapes (Minimum 3.0Mt. height)
as specified in the drawing & specifications for the
construction of road work, along with necessary
diversion arrangement for existing traffic movement
in an unobstructed condition, all relevant markings,
sign boards and illumination as per relevant
MORT&H specification. Precoated galvanised iron
profile sheets shall be of approved make and shade
having 0.50 mm (+0.05 %) total coated thickness
with zinc coating 120 grams per sqm as per IS:
277, in 550 mpa steel grade, 5-7 microns epoxy
primer on both side of the sheet and polyester top
coat 15-18 microns. Rate to be inclusive of all
materials, fabrication works, paint works for
information (retro reflective paint), foundation
works, transportation, loading, unloading,
installation, dismantling and inclusive of all taxes
and including the same design for providing
openable gates. No extra rental will be given to the
contractor in case of any delays from his part for
construction or due to any valid time limit
extensions. Each barricading sheet is to be
numbered with a unique number. The barricading
provided shall be retained in position at site
continuously i/c shifting of barricading from one
location to another location as many times as
required during the execution of the entire work till
its completion. Rate include its maintenance for
damages, painting, all incidentals, labour materials,
equipments and works required to execute the job.
The barricading shall not be removed without prior
approval of Engineerin- Charge. (Note :- One time
payment shall be made for providing barricading
from start of work till completion of work i/c shifting.
The barricading provided shall remain to be the
property of the contractor on completion of the
work). Blinkers are to be installed on the
barricading and rate for blinkers will be payable as
per relevant item. Barricading is to be cleaned by
33 200.00 Barricading the entire break down or excavated 80.35 Rmt
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item also
includes for making temporary sufficient nos of
lighting arrangement through out the work with
necessary required arrangement. ..The same shall
be removed after completion of work. (Only for
break down work from start to complete) (Based on
Drainage SOR 2009-10)
34 0.00 Manufacturing,andsupplaying steel 11660.00 No
vantilationcolums 15 cmsdia medium class pipe
with 60 x 60 cm 20 mm thick base plate and
stiffeners C.I ormamental cap 50 Kg and
necessareyfoundation nut bolts with one coat or
red lead oxide paint etc as per drawing and carting
to the work site etc. (GWSSB SOR 2021-22)
35 0.00 Labour charges for erecting steel ventilation colums 7500.00 No
15 cmsdia with ornamental cap safety with the help
of reqyuiredcapicity of hydra crane and base fixed
with necessarey foundation with coat or lead oxide
paint and two coat of any approved colour with
cmsdia stone ware of RCC pipe connecting with
MH including excavation and jointing as required
etc.(GWSSB SOR 2021-22)
36 100.00 Providing and operation dewatering Pump including 535.71 Shift
fuel charges & operator Charges etc. as directed
etc. comp. (Shift for Eight Hour) (For Each Pump
Set, No payment should be allowed for non working
condition of machinery) (Based on Previously
approved rate by C E sir )
37 1200.00 Hiring and operating Mud Pumps incl. Cost of fuel 14.29 H.P/Hr
and operator including the cost of to and fro
transportation, laying of the delivery hoses as
required, lowering and lifting the pumps as and
when required etc. complete. Set Do As Directed.
(No payment should be allowed for non working
condition of machinery )( Based on Previously
approved rate by C E sir )
38 30.00 Hiring and operating the 20 KV 3 Phase Electric 2500.00 Shift
Generator for operatingdesilting machinery,
andlighting and other requirements with
Arranging diesel to run the D.G. Set Do As
Directed. 8 Hrs Shift. (No payment should be
allowed for non working condition of machinery )(
Based on Previously approved rate by C E sir )
39 100.00 Providing & Supplying JCB Machine on rental basis 535.71 Hour
in case of emergency situation and break down
type work& also during unavoidable condition as
per instruction of engg.incharge, rate includes all
nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately
up to store. (No payment should be allowed for non
working condition of machinery and for pipe
lineexcavation andlaying work) (Based on
Previously approved rate by CE sir )
40 20.00 Providing & Supplying Hitachi Machine -110 1785.71 hr
capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery )
(Based on central work shop rate)
41 20.00 Providing & Supplying Hitachi Machine -200 2410.71 hr
capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges. (No payment should be
allowed for non working condition of machinery )
(Based on central work shop rate)
42 5.00 Providing & Supplying hydra carne Machine of 12 4910.71 Per 8
tone capacity on rental basis in case of emergency hr
situation and break down type work & also during Shift
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery)
(Based on central work shop rate )
43 10.00 Supplying electric breaker machine for RCC slab or 1071.42 Shift
asphalt demolishing work on site by using operator,
fuel, power supply etc.complete as directed. (no
payment should be allowed for non working
condition of machinery and for pipe line excavation
and M.H. work. Allowed only for break down work)
(Based on Previously approved rate by CE sir )
44 10.00 Supplying Pneumatic Breaker Machine for RCC 535.71 Hr
Slab or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) (Based on Previously approved rate by
45 10.00 Hiring of tractor with trolley considering 8 Hrs. as 1884.38 Day
working day hours incl.Driver (GWSSB SOR 2021-
46 15.00 Hiring of Three wheeler carrier (Chakado/Rixa) 1156.76 Day
considering 10 Hrs. as working day hours
incl.Driver (GWSSB SOR 2021-22)
47 5.00 Levelling or orientation of existing gully trap 71.42 No.
chamber incl. Nece. masonry in CM 1:6 and plaster
in CM 1:3 etc. using old G.T.stone and cover etc.
48 5.00 Constructing Bombay Pattern Type Catch Pit of 3125.00 No.
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and
15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with outjali etc. comp. as
directed. (As per R.A. Based on Building SOR
49 5.00 CatchPit Jali Fixing P/F FRC catch pit jali with 1383.92 No.
frame 600mm x 600mm clear opening etc. comp.
As directed by engineer in charge. (Based on
Central Store Rate)
50 Providing and casting in situ CC in grade M-20
(proportions as per mix design or as per table 9 of
IS 456 2000 in masses by weigh batching) using
granite, quartzite trap metal of size 6 mm to 20 mm
for RCC work, including scaffolding centering, form
work, needle vibrated consolidation, curing comp.
up to 6 meter depth or height (excluding cost of
reinforcement and neat finishing) with centrering
and shuttering/ deshuttering etc. comp. for structure
for other than water retaining. (GWSSB SOR 2021-
A 0.00 Footing (Without formwork) 5610.00 Cmt
51 100.00 Structural steel work riveted, bolted or welded in 115.00 kgs
built up for all type sections, inframed work,
including cutting, hoisting, fixinginpositionand
applying apriming coat of approved steel primer all
complete as per the structural designsand
directions of Engineer in charge.
52 0.00 Providing Fabricating and fixing MS Grating Jali for 13000.00 No.
Machinehole having 65 X 65 X 8 mm MS Angle
with Horizontal and Vertical 65 X 10 mm MS Flate
with 50 mm Spacing at equal distance. Work
includes with oilpaint and Transportation on site
work comp. as per Instruction by Engg. incharge.
53 Demolition incl. stacking of serviceable materials &
disposal of unserviceable materials with all lead
A 20.00 (d) Tiles or Stone flooring (20.23,page 219) 30.00 Smt
54 20.00 Providing and Laying of Rubber Moulded Paver 383.03 Smt
Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ; shape (Usually Uni-Paver Blocks) using
black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the drawing
/ instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and
laying paver blocks as per required grading and
specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in
such a way that the no cutting of the paver block to
be necessary. if cutting of paver block necessary
then it should be cut by machine only and carting.
The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall
be compacted and shall be relaid if necessary.
Gravel or such type of materials shall not be
allowed for production. Laying on 5 cms thick sand
bedding(As per ARC)
55 Provdg. & laying cement concrete 1:5:10 (1 cement
: 5 coarse sand : 10 hand broken stone aggregates
40 mm nominal size) and curing complete
excluding cost of form work in. (Bldg.Sor 2015-
16,item no.5.3.4,page no-49)
A 5.00 (A) Foundation and plinth 2048.00 Cmt
56 5.00 Labour work for fixing any kind of paving with 69.64 Smt
cement pointing in CM 1:2, including watering,
ramming etc comp. as dir.For pavement I) Laying
on Sand bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level
57 100.00 Labour work for reinstament or asphalt pavment 44.64 Smt
covering excvation watering consoldation resoiling
meating with the activity of teackcoat including
carting the mix from the nearest store pacting it with
convayance charge of excavation earth etc.comp
as directed...(Road SOR 15-16)
58 1.00 Providing, laying, spreading and compacting 1135.58 cmt.
gradedstone aggregate to wet mix macadam
specificationincluding premixing the Material with
water at OMCin mechanical mix plant carriage
ofmixedMaterialby tipper to site, laying inuniform
layers in subbase/ base course on wellprepared
surface andcompactingwithvibratory roller to
achieve thedesired density as per MoRTH clause
59 1.00 Supply of graded machine cut black trap stone 870.53 Cmt
aggregate (metal) of Sevaliya / Tima or equivalent
quality metal of size 25 mm to 40 mm. (Road SOR
60 1.00 Labour work for spreading the metal 85 mm thick in 112.81 Smt
single layer, incl. providing & applying bitumen for
semi grouting 2.5 kgs/sqm. & Providing &
spreading the key black trap aggregate of good
quality on top at the rate of 0.013 cmt. per sq.m. of
size 18 mm passing in 9.5 mm retain rolling with
10 tonne roller etc. comp. as directed.(Road SOR
(in words also)
SealandSignatureoftheBidder
Addl.CityEngineer
Date: (WestZone)
AHMEDABAD MUNICIPALCORPORATION
WestZone,ZonalOffice",2ndFloor,A.M.Office,Dr.RamanbhaiPatelBhavan,Usmanpura,A
hmedabadMunicipalCorporation,W.Z.Office,Ahmedabad-
380013.MunicipalCommissionerinvitesPercentageRatesealedtendersfrominterested
MEMORANDUMOFWORKSINBRIEF
Repairing/Renew of Breakdown MH and
P/L /Repairing Drainage line At
1. Name of Work :-
Sabarmati Area, Motera Area, Nursery
Area, D mart Area And Different Places
Of Ward in Sabarmati wrad, WZ.
2. Tender Estimated Cost :- Rs:-30,00,000.00
1% of the Tender Cost in the form of
3. Earnest Money :- Rs.30,000.00 (D.D. / Pay Order / Local Micr
4 Tender Fee Rs : Demand Draft of Rs.
6. Time-Limit : 12 months
7. Validity Period : 120 Days
8. (i) Last Date of Submission of :
Dt.01-09-2026, upto18:00 hrs
(ii) Mode of Sending : a) In Sealed cover in duplicate copies by
Registered Post A.D, or by Courier.or hand
b) Tender sent by ordinary post will be rejected
(iii) Description essential to be : a) Name of work, Tender Notice No. & Tender
made on sealed cover No.
b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in :
The Price bid shall be submitted online only.
Schedule of Quantities and It shall not be submitted Physically.
9. Date of Opening : Dt. 02-09-2026 ,15:00 PM
10 Place of Submission & Opening : Submission of EMD. Tender fee and other
of Tender Documents during office hours: On date. 02-09-
2026,12:00 pm West Zone, 2nd Floor, A.M. Office,
Dr.Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013.
11 Penalty Due to Delay of work (1) Rs.1000/- per day (for tenders amounting upto
10 Lakhs), (2) Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30 Lakhs), (3)
Rs.5000 per day (for all tenders amounting above
30 Lakhs) but not more then 10% of bill
12 Defect Liability : As per Tender Condition
Whenever a work is allotted by Engineering staff,
Time permitted to start parts of whether minor or major of part thereof of any
work amount, the contractor shall be bound to start the
works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via
Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure
of comply to start the works in 48 hours of
intimation as above by contractor the contractor
shall be levied penalty of (1) Rs.1000/- per day (for
tenders amounting upto 10 Lakhs), (2) Rs.2500 per
day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs). Three times failures
by contractor shall make contractor responsible to
be black listed unless and otherwise justified
properly in writing / binding within 15 days of last
notice of penalty.
14 GST ftuLx[t¾xhlu «J<obtlGST yjd&eåþfJJtbtkytJNu
Seal and Signature of the Bidder Add.CityEngineer(WestZone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
ુ ામ-: Repairing/Renew of Breakdown MH and P/L /Repairing Drainage line At Sabarmati
Area, Motera Area, Nursery Area, D mart Area And Different Places Of Ward in Sabarmati wrad,
તા.૦૭.૧૦.૨૦૨૩નાસરક લ ગેનાLiquidated Damage For Delay
Penalty per one
Sr no Category Category Problem SLA Period Problem per day
Engineering Drainage Rs.1000/-
1 No Drainage Machinehole Cover 24 Hours
Engineering Drainage Frequent Breakdown & Blockage Of 96 Hours
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Financedept. circular No-10 Dt.05-08-2024
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalizedBanks
(B) Guarantees issued by following banks will be accepted as SD/EMD for
the period up to March- 31, 2025. The validity cut-off date in the GR is
with respect to the date of issue of Bank Guarantee irrespective of the
date of termination of Bank Guarantee.
(I)Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
(II)Co-operative and Rural Banks OfGujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. KalupurCommerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
eal and Signature of the Bidder Addl City Engineer
AHMEDABADMUNICIPALCORPORATION
InvitationforBid(IFB)
1. TheAHMEDABADMUNICIPALCORPORATION,(hereinaftercalled“theEmployer”)
invites sealed Tender document from reputed and qualified bidders for theconstructionof
WorksdetailedintheTablebelow:-
Sr. NameofWorks Approximatev Earnest CompletionPe
No alueofworks(R Money riod
1 Repairing/Renew of Rs.30,00,000.00 Rs.30,000/- 12Months
Breakdown MH and P/L
/Repairing Drainage line
At Sabarmati Area,
Motera Area, Nursery
Area, D mart Area And
Different Places Of Ward
in Sabarmati wrad, WZ.
2. InterestedbiddersshalldownloadthetenderdocumentsfromAMC’swebsite
www.amcnprocure.com/www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 1500.00in the form
ofDemand Draft/Pay OrderfromanyNationalisedBank in favour
ofMUNICIPALCOMMISSIONER,Ahmedabad,payableatAhmedabad,whichshallbenonre
4. AllbidsmustbeaccompaniedbyEarnestMoneyDepositoftheamountspecifiedfortheWorksint
heaboveTablepayableatAhmedabadanddrawninfavourofMUNICIPALCOMMISSIONE
R,Ahmedabad,payableatAhmedabad,.EarnestMoneyDepositwillhavetobespecifiedinClau
se2ofFinancialCondition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone,
2ndFloor,Dr.RamanbhaiPatelBhavan,Usmanpura,AhmedabadMunicipalCorporati
on,W.Z.Office,Ahmedabad-380013.
6. TheBidswillbeopenedattheofficeofAddl.CityEngineer(W/Z),AhmedabadMunicipalCorpo
ration,2ndFloor,Dr.RamanbhaiPatelBhavan,Usmanpura,Ahmedabad
MunicipalCorporation, W.Z.Office, Ahmedabad-380013. in thepresenceof bidders or
their representatives who choose to attend.In the event of thespecifieddateofbid
submission/opening being declared
aholidayfortheEmployer,thebidsshallbereceived/openedonthenextworkingdayatthesamepl
aceandthesametime.
TERMS & CONDITIONS
( A )INSTRUCTIONS TO BIDDERS
(ITB)(B)GENERALTERMS&CONDITIONS
(C)FINACIALTERMS&CONDITIONS
(D)MAINCONDITION/FETURESOFTHEWORK
AHMEDABADMUNICIPALCORPORATIONTER
(A)INSTRUCTIONSTOBIDDERS(ITB)
1. ProcedureforSubmissionofTender
a). TheBiddershouldquotethepricebidintenderformbeforescheduletimeTenderDocument,tenderfee&
EMD(Draft/DD)andallotherenclosuresasaskedintender.
b).The bidder shall submit the following Tender documents physically in hard copy in
twoseparate envelope (marked as “original” and other marked as “Duplicate”) in schedule
timeby RPAD/ Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be
marked asfollows:-
TenderDocument
Registrationcertificateofclass
c).TheenvelopeshallbeaddressedtotheEmployeratthefollowingaddress:
Asst.Manager(Admin)WestZone,
2ndFloor,Dr.RamanbhaiPatelBhavan,Usmanpura,A
hmedabadMunicipalCorporation,
W.Z.Office,Ahmedabad-380013
d).Bearthefollowingidentification:
“TOBEOPENEDONLYINPRESENCEOFTHEEVALUATIONCOMMITTEE”
e).Indicatethenameandaddressofthebidder.
Iftheouterenvelopeisnotsealedandmarkedasabove,theEmployerwillassumenoresponsibilityforthemispl
acementorprematureopeningofthebid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to
beinitialedbythebidder.
g)AllTheBidDocumentEssentiallyNeedstobeProperlybinded/steppled
2. AssessmentofSubmission
The Employer will open the technical bid of physically submitted document of all the
bidsreceived for the package (except those received late) containing the sealed Tender
volumeandotherenclosuresthenannouncethenames
ofbiddersinthepresenceofbiddersortheirrepresentativeswhochoosetoattendonthedateandtimementi
onedintheNITIntheeventofspecified dateofbidopening being declared as aholiday for the
Employer,theTenderwillbeopenedattheappointedtimeandlocationonthenextworkingday.
In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first.
TheEmployer at the opening will announce bidder’s names, , the presence/or absence of
andvalidityofEMDfurnishedwitheachbid,isvalidregistrationandsuchotherdetails,astheEmployerm
ayconsiderappropriate.
TheEmployerwilldeterminewhetherthebidisaccompaniedbytherequiredEMD.
IftheEMDfurnisheddoesnotconformtotheamountandvalidityperiodasspecifiedintheInvitationfor
Bid and has not been furnished in theform,the bid shallbe rejected bytheEmployerasnon-
responsiveandtheTendervolumewillbereturnedtothebidder.
SubjecttoconfirmationoftheEMDbytheissuingbank,theTendervolumeaccompaniedwithvalid
EMDwillbetakenupforfurtherevaluation.Incase,theBankdoes not confirmtheEMD, thebid shall be
rejected as non-responsive and no furtherevaluation carried out.
Thetendervolumewillfurtherbeexaminedtodeterminewhetherthebidhasbeenproperlysigned,m
eetstheeligibilityandqualificationcriteria,hastherequiredavailablebid capacity, is accompanied by
the requisite certificates, undertaking and other
relevantinformationspecifiedinthebiddocumentsandissubstantiallyresponsivetotherequirement of
the bidding documents and provides any clarification for ascertaining
thecorrectnessoftheinformation/details.
If theTendervolumeisnot substantially responsive,it will berejectedby
theEmployerandwillnotsubsequentlybemaderesponsivebycorrectionormodificationorwithdrawalo
fthenonconformingdeviationorreservation.
3. EvaluationandComparisonofTendervolume
TheEmployerwillevaluateandcompareonlythoseTendervolumeswhicharedetermined to be
substantially responsivein accordance with Clause 2 and qualified
forawardofContractinaccordancewithClause5(GeneralTermsandCondition).
4. ProcedureforTenderOpening
Received copies of tender in physical form with in schedule time, will be open on
scheduledate and time. In the event of specified date of bid opening being declared bidders
whoqualifythecriteriathenbidderbidwillbeconsideredforopeningofpricebid.
The Employer will award the Contract to the bidder whose bid has been determined to
besubstantiallyresponsivetothebiddingdocumentsandwhohasofferedthelowestEvaluated Bid
Price, provided that such bidder has been determined to be (i) eligible
inaccordancewiththeprovisionsofClause3(GeneralTermsandCondition);and(ii)qualifiedinaccorda
ncewiththeprovisionsofClause5(GeneralTermsandCondition).
6. NotificationofAward
Prior to expiration of the period of bid validity prescribed by the Employer, the
Employerwillnotifythesuccessfulbidderbycable/faxandconfirmedbyregisteredletterthathisbid has
been accepted. This letter shall name the sum which the Employer will pay theContractor in
consideration of the execution, completion and maintenance of the Works
bytheContractorasprescribedbytheContract.
ThenotificationofawardwillconstitutetheformationoftheContract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular
afterreceivingletterofIndent.Timelimitofworkwillcommencefromthedateofissueofworkorder.
8. ClarificationofBids
To assist in the examination, evaluation and comparison of bids, the Employer may, at
hisdiscretion,askanybidderforauthenticationthecorrectnessoftheinformation/detailsfurnishedbyhi
minhisbid.SuchrequestbytheEmployerandtheresponsebybiddershallbeinwritingorbycable/fax.
Subject to aboveclause,nobiddersshall contact theEmployeronany matter relating
tohisbidfromthetimeofbidopeningtothetimecontractisawarded.
Any effort by the bidder to influence the Employer in the Employer’s bid evaluation,
bidcomparisonorcontractawarddecisionsmayresultintherejectionofhisbid.
Information relating to the examination,clarification,evaluation and comparison ofbidsand
recommendations for the award of a contract shall not be disclosed to bidders or anyother
persons not officially concerned with such process until the award to the
successfulbidderhasbeenannounced.AnyeffortbyabiddertoinfluencetheEmployer'sprocessingofbi
dsorawarddecisionsmayresultintherejectionofhisbid.
Thebidder is advised to visit and examine theSite of Works and its
surroundingsandobtainforitselfonitsownresponsibilityallinformationthatmaybenecessaryforprepar
ing the bid and entering into a contract for construction of the Works. The costs
ofvisitingtheSiteshallbeatthebidder’sownexpense.
ThebidderandanyofitspersonneloragentswillbegrantedpermissionbytheEmployertoenter
itspremisesandlandsforthepurposeofsuchinspection,but only upontheexpress condition that
the bidder, its personnel and agents, will release and indemnify theEmployer and its
personnel and agents from and against all liability in respect thereof
andwillberesponsiblefordeathorpersonalinjury,lossofordamagetopropertyandanyotherloss,da
mage,costsandexpensesincurredasaresultoftheinspection.
CheklistforsubmitionofTechnicalBid.
validRegistrationCopy.
AHMEDABADMUNICIPALCORPORATIONTER
(B)GENERALTERMS&CONDITIONS
The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites
Tenderdocument for the construction of works (as definedin these documents,hereinafter referred
toas"theWorks") detailedinthetablegivenintheIFB.
TheWorksconsistof:“asAbove"
TheexpenditureontheseWorkswillbemetbyAHMEDABADMUNICIPALCORPORATIO
3. EligibleBidders
Thisinvitationforbidsisopentobidderswhohasnecessarybidcapacityandwhomeetthefollowingrequir
Abiddershallnotbeunderadeclarationofineligibilityforcorruptorfraudulentpractice.
ThebiddersshallhavearegistrationwithStatePWD,and/orCPWD for "E-1" classand or
equivalent.If contractor is not registered with AMCin the relevantclass,onaward of
contract he shall be required to register himself with AMC within 3 month'stime.
BiddersshallprovidesuchevidenceoftheircontinuedeligibilitysatisfactorytotheEmployer,as the
Employer shall reasonably request.Subject to Submition of SuccsesfulSubmition as perClause–
4. EligibleMaterial,EquipmentandServices
At the Employer'srequest,thebidder having offeredthelowest evaluated financialbidmay be
required to provide evidence of the origin of materials, equipment, and services to
thesatisfactionoftheEmployer.
For purposes of Sub Clause 4.1, "origin" means the place where the materials are
mined,grown, produced or manufactured; similarly for equipments and from where the services
5. QualificationoftheBidder
TobequalifiedforawardofContract,biddersshall:
a)Submitawrittenpowerofattorney authorizing thesignatoryofthebidto commit thebidder; and
General information
Allindividual firms mustcompletetheinformation in this form.Nationality information
shallbeprovidedforallowner(s)orapplicant(s)thatarepartnershiporindividuallyownedfirms.
2 HeadofficeaddressWithContactno.:
3 Localofficeaddress(ifany)WithContactno.:
Telephone/ContactWithname:
5 E-mailaddress:
6 Placeofincorporation/registration:
7 Yearofincorporation/registration:
Additionalinformationregardinglitigation,debarment,arbitration,etc.
AuthorisedSignetureBidder
Disqualification
EventhoughtheBidders may meet theabovecriteria,they are subject to
bedisqualifiedforanyofthefollowingreasons:
a) Misleadingorfalserepresentationintheforms,statementsandattachmentssubmittedandincluded in
b) Record ofpoor performance such as abandoning the work, rescinding of contract forwhichthe
reasons are attributable to the non-performance of the contractor, consistent history
oflitigationawardedagainsttheapplicantorfinancialfailureduetobankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing
d) Thebidderfill(tender)inpercentagerateaboveorbelowandtotalamount(bothinfiguresandwords)o
nlyinE-Tender(Online)NottofillinhardcopyofTenderdocuments
Debarment/Blacklisting
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
theirmisleadingorfalserepresentationsintheformsstatementsetc.fortheperiodtobedecidedbytheEmp
6. OneBidperBidder
Each bidder shall submitonlyonebidpercontractpackage either by himselfor as apartner in a
joint venture. A bidder who submits or participates in more than one bid for
acontractpackagewillbedisqualified.
7. BiddingDocuments
Thebidderisexpectedtoexaminecarefullythecontentsofalltheabovebiddocuments.Failures to
comply with the requirements of bid documents will be at the bidder's own risk.Pursuant to
Clause 16, bids which are not substantially responsive to the requirements of
thebiddingdocumentswillberejected.
8. LanguageofBid
Thebid,andallcorrespondenceanddocumentsrelatedtothebidexchangedbetweenthebidder and the
Employer shall be written in the English language. Supporting documents
andprintedliteraturefurnishedbythebiddermaybeinanotherlanguageprovidedtheyareaccompanied
by an accurate translation ofthe relevant passages in the English
language,inwhichcase,forpurposesofinterpretationofthebid,theEnglishtranslationshallprevail.
Unless stated otherwiseinthebidding documents, the Contract shall be for the
wholeworksasdescribedinbiddingdocuments,basedonthepercentagerateamountintheBillofQuantiti
essubmittedonlinebythebidder.
The bidder shall fill (tender) in percentage rate above or below and total amount (both
The bidder shall fill (tender) in percentage rate above or below and total amount (both
infiguresandwords)foroverallitemsoftheWorksprovidedintheBillofQuantities
10. BidValidity
Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for
bidsubmissionspecified in Clause.TheEmployeras non-responsiveshall reject
abidvalidforashorterperiod.
Inexceptionalcircumstances,priortoexpiryoftheoriginalbidvalidityperiod,theEmployermayre
questthebidderstoextendtheperiodofvalidityforaspecifiedadditionalperiod.Therequestandthe
responsestheretoshallbemadeinwritingorbyfax. A bidder may refuse the request without
forfeiting his bidder agreeing to the requestwill not be required or permitted to modify his
bid but will be required to extend
thevalidityofhisBidSecurityfortheperiodoftheextension,andincompliancewithClause2(Finan
cialTerms&Conditions) in allrespects.
11. FormatandSigningofBid
The bidder shall prepare two copies of the documents comprising the bid as described
inInstructionsto Bidders.
Thebid shall betypedor written inindelibleinkandshallbesignedby a person
orpersonsdulyauthorizedtosignonbehalfofthebidder.
The bid shall contain no alterations, omissions or additions, except those to comply
withinstructionsissuedbytheEmployer,orasnecessarytocorrecterrorsmadebythebidder,inwhi
chcasethepersonorpersonssigningthebidshallinitialallsuchcorrections.
Allwitnessesandsuretiesshallbepersonsofstatusandprobityandtheirfullnames,Occupatio
nsandaddressesshallbeprintedbelowtheirsignatures.
12. DeadlineforSubmissionofBids
BidsmustbereceivedbytheEmployerattheaddressspecifiedabovenotlaterthanthetimeanddatespecifi
Any bid received by the Employer after the deadline for submission of bids will be
returnedunopened to thebidder.
14. SigningofAgreement
AtthesametimethattheEmployernotifiesthesuccessfulbidderthathisbidhasbeenaccepted, the
Employer will direct him to submit the Performance Security andattend
theEmployer'sofficeonadatedeterminedbytheEmployerforsigningtheFormofAgreement.
15. Theselectionprocesswilllayhighemphasisontheabilityandcompetencyofcontractorstodohighqu
alityworkwithinthegiventimeschedule.
16. The onus of providing, all necessary company / project related information, in
appropriatemanner and medium, so as to demonstrate the competency of the bidder and to allow
properevaluation,willrestentirelyontheBidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry
oforiginalandextendedtimelimit.
18. LegalCondition:-
CorruptorFraudulentPractices
TheEmployerwillrejectaproposalforawardifhedeterminesthattheBidderrecommendedfor
awardhasengagedincorruptorfraudulentpracticesincompetingforthecontractinquestion.
TheEmployer will declarethefirmineligible,eitherindefinitelyor for a stated period of time, to
be awarded a contract by AHMEDABAD
MUNICIPALCORPORATIONifitatanytimedeterminesthatthefirmhasengagedincorruptorfrau
dulentpracticesincompetingforthecontract,orduringexecution.
“corruptpractice”meansbehavioronthepartofofficialsinthepublicorprivatesectorsbywhicht
heyimproperlyandunlawfullyenrichthemselvesand/orthosecloseto them,orinduceothers to
do so,by misusing theposition in which they areplaced,and it includes the
offering,giving,receiving, or soliciting of anythingof value
toinfluencetheactionofanysuchofficialintheprocurementprocessorincontractexecution;
“fraudulentpractice”meansamisrepresentationoffactsinordertoinfluenceaProcurement
theexecutionofacontracttothedetrimentoftheBorrower,andincludescollusivepracticeamong
bidders(priortoorafterbidsubmission)designed to establish bid prices at artificial non-
competitive levels and to deprive theBorrowerofthebenefitsoffreeandopencompetition.
MunicipalCommissionerreservestherightstoreduce/increasethescopeofworkandcontractwitho
utassigninganyreasonthereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to
materialmisrepresentation or provided fraudulent information / statement, the said Bidder
will beliablefordisqualification/rejectionatanystage.
Proofforfulfillmentof eligibility criteriashouldbesubmitted along withTendervolume.If the
Tender volume is submitted without valid documents and without proof of
eligibilitycriteriaitwillberejected.
ThosewhodonotmeetwiththeeligibilitycriterianeednotsubmittheTenderdocument.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in
anyrespectorareconditionaltenders,willberejected.
ContractorshallberesponsibletoobeyallLabourLaws,EnvironmentalandSafetyLaws.(the
existing laws as well as framed from time to time). Any penalties laid due
toviolationofsuchlawsshallbedirectlydeductedfromthecontractor'soutstanding.
19. AdministrativeConditions:-
SafetyandSignage
Contractor has toarrange for the completesafetyofthepersons working for project, usersof the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fibercones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at
site.Necessaryflorescent marking on traffic signs to be provided so that it should be visible
atnight.Duringnightworkinghourssafetyinchargepersonnelshallbeprovidedwithflorescent
jackets. This shall be Provided at no extra cost by the bidder under
attachéwithspecifiedinthetenderdocumentsunderpayableiteme.
LiaisonwithlocalauthorityforelectricalconnectionsfortheAMC
Thecontractorisresponsibleforliaisonwithlocalauthorityforchangeinsupplyconnectionornewco
nnectiononbehalfofAMC.ItincludesfillingthenecessaryapplicationtopowerSupplyCompany,fo
llowupandgettingthesupply,fillingthenecessary test reports to the power supply company. All
official fees including
securitydepositsandotherexpensesshallbeofinitiallypaidbythecontractor.AMCmaysupportto
get the temporary connection and may at its diseretien get the same converted
topermanent connection at thesameofAMC if desired do,andcontractorshallasnoextra
cost support the same. In this case AMC my be as the remaining cost subject
20:-CONTINGENTFEE:
The Contractor warrants that he has not employed any person to solicit or secure
thecontractuponanyagreementforacommission,percentage,brokerageorcontingentfee.
Breach of this warranty shall give the Municipal Commissioner the right to cancelthe
contract or to take any other measure as the Municipal Commissioner may deem
fit.Thewarrantydoesnotapplytocommissionspayablebythecontractortoestablishcommercial
orsellingagentforthepurposeofsecuringbusiness.
No officer, employer of theMunicipal Corporation beadmitted to any share or part
ofthiscontractortoanybenefitthatmayrisetherefrom.
21:-OVERPAYMENTANDUNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises
outoforunderthisContractagainstthecontractorthesamemaybedeductedbytheMunicipalCorpo
rationfromanysumthendueorwhichatanytimethereaftermaybecome due to the contractor
under this contract and failing that under anyothercontractwith the Municipal Corporation
or from any sum due to the contractor with the MunicipalCorporation (which may be
available with MunicipalCorporation), or from his
retentionmoney,orheshallpaytheclaimondemand.TheMunicipalCorporationreservestherightt
ocarryoutpostpaymentauditandtechnicalexaminationofthefinalbillincludingallsupportingvou
chers,abstracts,etc.
TheMunicipalCorporation further reserves the righttoenforcerecoveryofany overpayment
when detected not withstanding the fact that the amount of the final bill may
beincludedbytheContractor.
If as a result of such audit and technical examination any over payment
isdiscoveredinrespectof any work donebytheContractor or alleged to have beendone by
himunderthecontract,it shall berecovered by theMunicipalCorporationfromthe contractor
byway of all the means prescribed above or ifany under payment is discovered by
theMunicipal Corporation, any amount due to the contractor under this contract or
underpaymentmaybeadjustedagainstanyamountthendueorwhichmayatanytimethereafterbeco
meduebeforepaymentismadetothecontractorfromhimtotheMunicipalCorporationonanyother
contractaccountwhatsoever.
If, at any time, there should be evidence of any lien or claim for which
ownermighthavebecome liable and which is chargeable to the contractor, the owner shall
have the right toretain out of anypayment then due or thereafter tobecome due an amount
sufficient tocompletely indemnify theowneragainstsuchlien or claimor if
suchlienorclaimbevalidtheowner may be orbecomedueandpayabletothecontractor.Ifany lien
orclaimsremaining,unsettledafter all payments aremade,thecontractorshallrefundorpay to
theowner all money that thelatter may be compelled to payin discharging
suchlienorclaimincludingallcostandreasonableexpenses.
Contractorshallnotsub-lettheworkwithoutpermissionoftheauthority.
JointventureandsubcontractingshallnotbeallowedunderthistenderADDE
Addendumorcorrigendumconveyinganychangeorcorrectioninrespectoftheworkshallformthepartof
thecontractdocuments.Thefullconsiderationshallbegiventosuchaddendumorcorrigendumbeforesu
bmissionoftenderdulyfilledinbythecontractor.Therefore,thecontractorsshallhavetokindlyreferthete
nderforsuchaddendumorcorrigendumpublishedbyAMCthroughitswebsitewww.amc.nprocure.co
m&www.nprocure.com48 hourspriortothedeadlineofsubmissionofthetender.Tenderersshall verify
the number of addendum issued and enclose the same with the tender documents
,failingwhichthetendersshallbeliableforrejectionandnoanycomplaintinrespecttothisshallbeentertai
nedunderanycircumstances.
SealandSignatureoftheBidder
Addl.CityEngineerD
ate: (WestZone)
AHMEDABADMUNICIPALCORPORATIONTE
(C)FINACIALCONDITION
1. CostandCurrenciesofBidding
ThebiddershallbearallcostsassociatedwiththepreparationandsubmissionofhisbidandtheEmploye
rwillinnocaseberesponsibleorliableforthosecosts.
CurrenciesofBidandPayment
TheratesandthepricesshallbequotedbythebidderentirelyinIndianRupees
Allpaymentsincludingadvances,ifany,shallbemadeinIndianRupees.
2. EarnestMoneyDeposit :-
Bank guarantees (and other instruments having fixed validity) issued as surety for the
bidshallbevalid for28daysbeyondthevalidity ofthebid.
TheEMDoftheunsuccessfulbidders,exceptforL1,L2andL3bidders,willbereturnedaspromptlyas
Earlyaspossibleasbutnotlaterthan28daysaftertheexpirationoftheperiodofbidvalidity.
The EMD of the successful bidder, along with second and third lowest tenders, will
bereturnedwhenthebidderhasfurnishedtherequiredperformancesecurityandsignedtheagreement.
EarnestMoneyDepositmaybeforfeited
a) ifthebidderwithdrawshisbidduringtheperiodofbidvalidity;
b) inthecaseofasuccessfulbidder,ifthebidderfailswithinthespecifiedtimelimitto
i) FurnishtherequiredPerformanceSecurityor
ii) SigntheAgreement.
3. (A)SecurityDeposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI)
thesuccessfulbiddershalldelivertotheEmployer,aInitialSecurityDepositShallbesubmitted
asper C.E. Circular.intheformofaBankGuarantee/DD/Locle
MICRchequeforanamountequivalentto5%(fivepercent)oftheContractPrice.
Failure of the same shall make the contractor liable for any penalty as decided by AMC.
Atpresent a policy is framed by Audit department of AMC to charge 4% interest for the
balanceperiodanddiscontinuityperiod.
TheSecurityDepositto be provided by the successful bidder inthe form of
abankguaranteeasperformatshallbeissuedasperMemorendumofwork.
Retention@2%ofthevalueofworkdonewillbedeductedfromeachRAbill.Itwillbereleaseda
longwithreleaseofpaymentofFinalBill.
4. ApprovedBank:-AsperAnnexer-I
5. Noadvanceformachineryormaterialswillbegiven.
6. Mobilizationadvancewillnotbegiven.
7. QuantitiesinB.O.Q.mayvaryuptoanyextentandcontractorshallnotclaimanyextrarateforthesame.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended
timelimit.&AsperAMCRule
9. Tax,DutiesonMaterials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax,
VAT(exculdingGST)etc. on materialprocurementor any other component forthe works
fromanysourceshallbebornebythecontractors.
AsperconstructionworkswelfarecessAct–1996non-
refundableonepercentoftenderamountshallbedeductedagainstworkswelfarecess.
SealandSignatureoftheBidder
Addl.CityEngineerD
ate: (WestZone)
Generalterms&conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or
equivalentregistration with any other stateGovt. or institutions. Copy of registration
shouldbeattachedwithtenderdocument.Tendererwhowas not registredin AMC must be
getregistred in panelofapprovedAMCcontractor.
2. AbookletofFORMB-1ofGujaratStateRoads&BuildingDepartment/WaterResources
Department with the correction slips made up to 15-08-1999 may be referred. (onlyEnglish
version) Clause No. -2 liquidated damages for delay shall be overrule by
A.M.C.’sM.C.circularno.-9 dt.18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed
/"approved"bytheEngineeringincharge.
4. Wherever areferenceto any Indian standard appears in the specifications,it shall
betakentomeanasreferencetothelatesteditionofthesameofforceonthedateofagreement.
5. In"Modeofmeasurement"inthespecificationswhereveradisputearisesintheabsence of
specific mention for a particulars point / aspect, the same in the relevant
IndianStandardsshallbereferredto.
6. Allmeasurementandcomputations,unlessotherwisespecifiedshallbecarriedoutnearesttothefo
llowinglimits:-
i) Length,widthanddepth,Height 0.01Meter
ii) Areas 0.01Sq.mts.
iii) Cubiccontents 0.01Cu.mts.
Inrecordingdimensionsofwork,thesequenceoflength,widthandheight(Depth)orthicknessshallbefoll
7. Definiteparticularscoveredintheitemsofwork,thoughnotmentionedorelucidateinitsspecific
ationsshallbedeemedtobeincludedtherein.
8. ApprovalofthesamplesofvariousmaterialsgivenbytheEngineerinchargeorAMC'sConsultan
tshallnotabsolvethecontractorfromtheresponsibilityofreplacingdefectivematerialsbroughtonsiteor
materialsusedintheworkfounddefectiveatalaterdate.Thecontractorshallhavenoclaimtoanypayment
orcompensationwhatsoeveronaccountofanysuchmaterialsbeingrejectedbytheEngineerincharge.
9. Thecontractor’sratefortheitemofworkshallbefortheworkcompletedinallrespect.
10. AllmaterialsincludingthoseofelectricalshallbegotapprovedbytheEngineerincharge/Archite
ctbeforeusingtheminthework.
11. Materials as andwhen rejected bytheEngineer
inchargeorAMC'sConsultantshallberemovedfromthesiteofworkwithin24hours.
12. Allworkshallbecarriedoutinamannerasperstandardengineeringpractice.
13. Alltools,templates,machineryandequipmentforcorrectexecutionoftheworkaswell as for
checking lines, levels, alignment of the works & all precautionary measures
duringexecutionshallhavetobekeptinsufficientnumbersandingoodworkingconditionatthesiteofthe
work.Allexcavatedtrenchshallbekeptcoveredwithbarricadeandcautiontap.
14. SpecialmodesoftheconstructionnotadoptedingeneralEngineeringpractice,ifproposed to be
adopted by the contractor shall be considered only if the contractor providedsatisfactory
evidence that such special mode of construction and completion of work to therequired strength
and quality. Acceptance of the same by the Engineer in charge shall nothowever,absolve the
contractor from theresponsibility of any adverseeffect and
concordanceofadoptingthesameinthecourseofexactionorcompletionofthework.
15. The contractor shall be responsible for observing the rules and regulation imposed under
the"MinorMineralAct",andsuchotherlawsandrulesprescribedbytheGovernmentfromtimetotime.
16. All necessary safety measures and precautions (incl. those laid down in the
variousrelevant Indian Standard) shall be taken to engrave the safety ofmen, materials and
machineryontheworkandalsooftheworkitself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking
tothequantumofactualworkforwhichnoanyclaimshallbeentertainedbyA.M.C.
18. ContractorshallhavetoexecuteextraitemifrequiredorasperneedofAMC.
19. The work in general shall be carried out as per standard specifications of the
relevantitems to be executed & as per the instruction of Engineer in charge & as per the guidance
ofAMC'sConsultantforthisproject.
20. Thegeneralterms&conditionsofthecontractshallbeapplicable&shallbebindingonthe
contractor.The contract agreement shall have to be executed
betweenAMC&theagencytowhichworkisawardedfor execution.
21. ForTenderamountingbelow10lakhLOIshallbeissueswithin3daysafterreceivedofsanctioned
tenderandresolution.Within10dayscontractorhastosubmitSDandafterreciveing SD Work order
shall be issue to contractor and the time limit shall be start from
thedateofissueofthewrittenworkordertothecontractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received
ofsanctionedtenderandresolution.Within15dayscontractorhastosubmitSDandafterreciveing SD
work order shall be issue to contractor and the timelimit shall be start from
thedateofissueofthewrittenworkordertothecontractor.
Security Deposit of5% ofsanctionedtenderamountshallbedepositedby pay order/demand draft
/ cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractorshallhaveto sign
contractpaper with AMC.The contractor shall be fined 4% of
interestperyearfordelayinsubmissionofS.Dandshallbedeductedfromcontractor’sbill.
22. In case of any ambiguity in specifications mentioned in this tender, the
interpretationgivenbyM.C.OrHisDesignetedOfficerwillbefinalandbindingtotheContractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing
orspecification and the Engineer -in-charge shall make such corrections and interpretations
asnecessarytofulfilltheintentoftheplantsandspecifications.
24. ThequantitiesofitemsinBOQ(BillofQuantities)mayvaryincaseofnecessityarises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the
MunicipalCorporation.willbepayablebythecontractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or
labourshallbepaid.
27. Contractorisrequestedtoseethesitephysicallybeforetendering.Heis also
requestedtoquotetherateskeepinginviewofallthepointsmentionedinrelevantpagesoftenderdocumen
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
pipedwater for the construction of the works and provide a satisfactory supply of potable water
fordrinking, washing, sanitation and cleaning down. The contractor will be responsible for all
thecosts where applicable of connection, meter installation, water consumed, water required
fortestingpurposes,disconnectionandthelaying,maintenancesandultimateremovalofanydistribution
systemaroundthesite.
29. Electricity: Electric supply will be made available at the site by the Contractor and
thecontractormustmakehisownarrangementswiththeCorporationandElectricitySupplyAuthoritiesa
nd with other contractorsto connect and to takeasupply from such
services,payingallcostsinconnection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
forpurposeoftheworkandshallpaysuchchargesasisfixedbytheappropriatesupplyAuthorities.
In casethereis any delay in supply ofpowersiteof any interruption or fault in thepowerduring the
work. No compensation shall be paid for idle labor staff, machineries and for use
ofdieseloperatingsetsetc.asthecasemaybe.
30. Tendersshallsubmitallthevalid/certifieddocumentsinsupportoftheirinitial/eligibility
criteria mentioned abovealong with thebid.They shall havealso to
submittheincometaxclearancecertificateandsolvencycertificate.
31. No advance such as secured advance machinery advance, mobilization advance or
materialsadvancewillbegiven.
32. ThecontractorshallgettheelectricalworksexecutedthroughtheauthorizedGovernmentapprovedlicen
sedelectricalpersonorfirminappropriatecategoryinaccordancetocontractualprovisions.
33. Theelectricalworksshallbecarriedoutstrictlyinaccordancewiththedirectivesissued
byEngineerin charge.
34. Contractorsshallnothaveanydisputeorclaimforanykindofcompensations
(i) Ifthequantitystipulatedinthetenderitemsvariesorthescopeofworkchanges&therebyt
otalamountofworkincreases/decreases.
(ii) Iftheworkgetsdelayed/postponedforsomeadministrative/technicaldecisionwhatsoever.
35. In case ofanydispute,decisionofMunicipalCommissionershallbe final and
bindingonthecontractors.
36. Tenderswhichdonotfulfillalloranyofconditionsoraresubmittedincompleteinanyrespect will be
rejected. Municipal Commissioner reserves the right to increase/decrease thescope of work. No
any claim to that effect shall be entertained. The Municipal
Commissioneralsoreservestherighttorejectanyorallthetenderswithoutassigninganyreasonthereof.
37. Thecontractorsarerequestedtoquotetheirratesconsideringabovetenderconditions.
38. Thecontractorshallhavetoexecutethecontractagreementafterreceivedworkorder.
Even though in special case, If work is not started because of monsoon or any
otherspecial reason (like site is not available and due to unavoidable circumstances
arise),afterevaluation of situation the actual date of starting of work will be consider after
approval ofDy.M.C.(West zone)
39. TheContractorshallnotclaimforincreaseordecreaseinthequantityoftheBOQitemorthescopeofwork.
40. TheR.Abill/finalbillpaymentshallbemadeasperthelatestA.M.Cpolicy/circularfortheworkdonebyth
41. Conditionaltenderswillnotbeaccepted.
Signatureofcontractorwithseal
AdditionalCityEngineer(W.Z)Date
AhmadabadMunicipalCorporation
AHMEDABADMUNICIPALCORPORATIONE
NGGNIERINGDEPARTMENT
GENERALSPECIFICATION
Timelimit for thework shall be12 months after theorder to start the
works.Progressofworkshouldbeinproportiontotimelimit.ThedetailsofreinforcementofR.C.C.work
shallbeasperdesignandinstructionsofAdd.CityEngineerandhisorderwillbeconsideredfinal.
The contractor shall have to maintain account of steel, cement and other materials that may
bebroughtbyhimonsite.Thisaccountshallberegularlymaintainedandkeptopenforinspectionby
Municipal Staff.Wateringofall the items shallbe as per instructions otherwiseno payment shall
be made to contractors. Mixing of concrete shall be done by concrete
mixermachine.ArrangementsofbindingvibratorforR.C.C.worksifrequiredshallhavetobemadebyth
Thecontractorshallberemain responsible for Workmen’s compensation ifanyaccident.The
contractor shall arrange for barricading at night and arrangement of Pagi at night to
directthetraffic. Heshallberesponsible for any damage to public.If any incident happen,
duringtheexecutionofwork.In case of dispute for unseen or overlooked items thedecision of
theDy. City Engineer shall be final.The contractor shall have to give site clean of all
rubbishduringtheworkandatthetimeofcompletionofworkandhand over thesitewithfinalfinishing
of the work as directed.Alltherejected materials shall beremoved from
sitewithin24hoursbycontractoratthisriskandcost.Debrisshallhavetocartdailyfromsite.
Formixingmortareitherformasonryorforplasterorforanyotherpurposecontractorshallhavetopre
parethroughofbiggersizeandmixthemortarintherequiredproportion.Inon case he shall be allowed
to mix the mortar either on floor or any finished surfaces.
Thecontractorshallhavetomakehisownarrangementforwaterrequiredforthework.
If any extra item crops up during the progress of work the same shall be carried out by
thecontractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based
onlatestSORorifitemisnotavailableinSORthanbasedoncurrentmarketrates.Incaseofextraitemdecis
ionofAdd.CityEngg.shallremainfinalregardingrate.
Ifin the interest ofthe Corporation it isnecessary to changeeither any siteorthedesign
oftheproposeworkthecontractorshallcarryoutthesameathisquotedrateswithoutchargesany extra
and the contractor will have to carry out the works and he will be paid at the
ratequotedbyhim.Noclaimforextrarateforsubsequentchangesinsiteanddesignisentertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractorsshallhavetopreparethemeasuresboxesaccordingtothismeasure.
Octroi exemption passes shall not be given for any materials required for the work.
ContractorwillbefullyresponsibleforcomplianceofthevariousprovisionsundercontractAct.1970an
dtheRulesframedthetounder.
Thetender for the work shall remain open for aperiod (180) days from the date of opening ofthe
tenders for this work and that the tenderer shall not be allowed to withdraw on modify theoffer
on his own during the period. If any tenderer withdraw or makes any modifications oraddition in
the terms and conditions of his tender not acceptable to the Municipal
CorporationtheMunicipalCorporationshallwithoutprejudicetoanyrightorremedy be at liberty
toforfeitinfullthesaidearnestmoneyandblacklistthecontractor.
Ifworkisnotstartedwithinspecifiedtimelimitthepenaltyasperrule&tenderconditiondelay of start
shall be recovered separately from the immediate bills payable to the
contractor.Contractorhastomakehisownarrangementforprocurementofsteelandcement.
Contractorsshouldnotethefollowingconditionscarefully:-
i) Conditionaltendershallnotbeaccepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to
iii) In case of tender downloaded from website, tender fee & EMD should be submitted
informofdemanddraft
iv) Condition of Form - B1 Standard Specification of material & code of practice will
beapplicable.FormB1canbeisavailableinwebsite.Specificationshallbeasper'R&BDept.-
Govt.ofGujaratbookletsofBuildingWorks&andRoadWorksSpecificationspublishedbyGuj
aratBookDepot,Sector-21.Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
&STAMP (WestZone)
TECHNICALSPECIFICATIONS
AHMEDABADMUNICIPALCORPORATIONEN
GINEERINGDEPARTMENT
TECHNICALSPECIFICATIONSITEMSREQUIREDDURINGEXECUTIONOFDRAINAGELINEWORK
ItemNo. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil
1 includingsorting out stacking of useful material & disposing of excavated stuff up to
tm. leadloose or soft soil, girding, lighting, fencing the trenches', and pits. (depth
measured fromGL). Etc.comp.
Excavation shall be done as per plans and alignment in all sorts of soil including all
masonary,concrete and asphalt road paving work etc. Root of trees met with during excavation
shall bestacked at lead of 4’ away from the trenches as per instruction so that it may not
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly
leveled. The excavated earth shall be stacked at any place or places shown within 50mtr. as
directed. After completion of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor
lining out and shall care to preserve the level pegs given. He shall have to arrange forshorting at
his own cost if the soil is found to be loose and sandy. He shall have to arrange forsorting out
brickbats or any serviceable materials found during excavation and shall have tostock. Nothing
extra shall be paid for this. He shall have to cart the excavated soil to site shownwithin 50 mtr. If
so ordered by officer in charge of this work. No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as
per drawing. Contractor should arrange for safely measures so that there is no danger offalling
any men or animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The
contractor should not damage any of the municipal property, water lines, electric cables etc.at
the time of excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgrossnegligenceonhispart,otherwise such
damages will be recovered from him. Excavated stuff will be stacked at the siteshown or will be
carted by the contractor immediately as per the other item of this tender.Instructions of C.E. or
his representative will be strictly followed. Measurement shall be given onCmt.basis.
Excavationforfoundationupto(a)Upto0to2.0Mt(b)from2.0to3.0mtdepth(c)from3.0to
5.0mtdepth(d)above5.0mtdepthincludingsortingoutandstackingofusefulmaterialsanddisposalof
theexcavatedstuffupto50mt.lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all
masonary,concrete and asphalt road paving work etc. Root of trees met with during excavation
shall bestacked at lead of 4’ away from the trenches as per instruction so that it may not
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly
leveled. The excavated earth shall be stacked at any place or places shown within 50mtr. as
directed. After completion of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor
lining out and shall care to preserve the level pegs given. He shall have to arrange forshorting at
his own cost if the soil is found to be loose and sandy. He shall have to arrange forsorting out
brickbats or any serviceable materials found during excavation and shall have tostock. Nothing
extra shall be paid for this. He shall have to cart the excavated soil to site shownwithin 50 mtr. If
so ordered by officer in charge of this work. No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as
per drawing. Contractor should arrange for safely measures so that there is no danger offalling
any men or animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The
contractor should not damage any of the municipal property, water lines, electric cables etc.at
the time of excavation. Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgrossnegligenceonhispart,otherwise such
damages will be recovered from him. Excavated stuff will be stacked at the siteshown or will be
carted by the contractor immediately as per the other item of this
tender.InstructionsofC.E.orhisrepresentativewillbestrictlyfollowed.
MeasurementshallbegivenonCmt.basis.
ItemNo.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement /
upto0.20meterincludingdemolishingtheasphaltcarpet,metal,soiling/cuttingReinforcemente
tc. comp.withstackingthematerialasdirected.(app.rate)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing
theasphalt carpet, metal, soiling etc. complete with stacking the materials as directed.
Theroad surface of asphalt shall carefully be opened to full width as directed by the
Engineerin charge Asphalt, popada'sspouls, metals etc shall be separately deposited in
suchplaces as may be determined by the Engineer-in-charge. In case above materials
notbeing so deposited or being mixed up with the excavated materials will not be allowed
forrefilling.Thecostofmaterialsshallbechargedfromthecontractor.Thedecisionofthe
C.E.shallbefinalandbindingtothecontractor.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:TherateshallbeforaunitofSmtBasis.
ItemNo. Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuff
3 asdirectedwithin aradiusof3km.
Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuffasdirecte
dwithinaradius of3km.
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyancecharge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavatedrock,flyash,aggregateofanykindetc.comp.Upto5.0Km.lead
Allthesurplusearthetc.shallbecarriedawayimmediatelyfromthesiteofworktoaplacewithin
5km.distanceorasdirectedandorderedbytheEngineer,soasnottocauseanyinconvenience to the
public traffic finding which in view of public safety and traffic convenience.The Corporation shall
carry out the work by any other agency at the contractor’s risk and cost.
iftheinstructionsarenotcomplied within7daysfrom thedateofordertocartthe surplusmaterials and
clear the site, the said work shall be carried out by the Municipal Corporation attherisk
andcostofthecontractorandnoclaimordisputeshallbeentertainedinthisrespect.
If the filling in trenches after settlement of the earth filling in trenches is to be done
andthesameshallbecarriedoutbythecontractorwithout asking any extra rate. The contractorshall
have to cart the surplus earth after the trenches we will watered and refilled with the sand.The
rate of carting including carting of brick bats, metal, rubble vegetable and garbage,
ifnecessarytocleartheroadsurface.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling,
transportingpipes to work site, unloading lowering in trnch such as cementsand, hemp
bitumen asdirected,incl.wateringthetrenchesspreadingandcartingawayofsurplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement
jointsin C.M.1:1 proportion in proper position , grade and alignment at all level as
directed byEngineer-in- charge including conveyance from stone to site of work, Jointing
materialetc.comp.
A)…………do…….(b)10 cm dia
lineB)………do ..... (c)15cmdialine,20cmline
C)……………do….(c)23cmdialine
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved
qualitymake and shall be brought on site after approval. (The pipes shall be laid in grade as
perinstruction.)Contractorshallhavetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun
yarndipped in hot asphalt and caulking tools. The hydraulic pressure test shall be given to
thecontractor for testing pipes and jointing. No trenches shall be filled without the approval of
theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on
theplan and section. In all sorts of soil including old masonary, asphalt roads and wet
excavation.The sewer excavation shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the
completed sewer only when directed by the engineer in charge looking to the progress ofthe
work in obtaining the formation of the bottom of the trenches the usual methods of using
signrails and boning roads shall be adopted during the whole of the process. The centre line
ofuniform height shall be carried clearly on each rail. The depth of the excavation and invert of
thesewer shall be checked by means of boning road of approved length and also by straight
edge.The bed of the trench shall be well rammed before starting laying of sewer lines and
cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by
suitabletimbering of shorting work looking to the nature of the soil near big or important
structure, thesides of the trenches shall be closely and securely timbered, if any settlement of
the buildings inanticipated the timbering shall be left in the ground. The various materials
excavated shall beseparately stacked so that in refilling that may be relayed on the same order
as before and leastpossible damage shall be done carpet on the public roads and private
properties. Surfacecovering consisting of asphalt carpet shall be kept on side and preserved for
reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused
unnecessary obstructionalong the trenches during inspection trenches etc. shall be tunneled
under only as necessary.The side of the trenches shall be nearly vertical and plumb and red
light shall be placed at eachend at intervals and instructions and further protected by rope fence.
Necessary caution boardsshallalsobecreatedandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave
to be taken in refilling the trenches so that no damage may be done no sewer, no lumpshall be
allowed to be put around the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The
measurementsof the work shall be exact length and width of the trenches as specified or as per
City Engineerinstruction and depth shall be measured vertical as per section up to invert or the
pipeline. TheCity Engineer reserves the right of extra excavation on either side if considers
necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all
directedbefore any concrete is in dia. In case the excavation is done deeper than required no
filling shallbe allowed to bring the formation to proper level but contractor shall have to lay
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost
so as to come to proper formation. In case bad formations are met with the work shall haveto be
done as per instruction of City Engineer. Necessary arrangements for watering trenchesmust be
provided by contractor and without proper watering trenches will not be allowed to befiled to
further Contractor shall have to make arrangement for access to invert of the sewer andfor
inspection of the work as ordered by the engineer. If it is required to shift or after thealignment
section of diameter of the pipe the contractor shall carry out the altered work at therates quoted
by him for the original work for items and contractor shall not claim any
expensesduetothechangesmade.
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework
must be executed vigorous day night without interruption when so ordered by the engineer.All
existing water pipe storm drains sewer line railway track, electric cables etc. which do not inthe
opinion of engineer required to be changed in location shall be supported and protected
frominjury by the contractor. The contractor shall be liable to pay all damages to water-pipe,
drainselectric and telephone cable and to private property during the execution of this contract
and thesame will be recovered from the running bills or the deposit of work change location of
anyexisting sewers drains etc. not otherwise from in these specification the contractor shall do
thework of making such change and the work shall be paid for as extra work. All places utility
etc.shallbekeptaccessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than
theinside diameter of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor.
Wherever natural soil demands winder excavation the mentioned above the same shall begiven
after approval of City Engineer. The rate for excavation for easy jointing and caulkingnothing
extra shall be paid for this. Refilling of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches
arecompletely refilled. Temping and ramming with rammers shall have to be done at all place
ofimportant work where ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo
watering satisfactory corporation shall get it done at the risk and cost of the contractor with
orwithout giving any notice and the expenses incurred in doing so recovered from the
contractoreitherincostorfromhispaymentthroughbills.
Therateshallbepermeterbasis.
TherateperCmt.inthisitemshallbepaidextraadditiontotherateforexcavation
ItemNo. ProvidingandsupplyingISIStandardRCCpipes(ofsulphateresistingCement)instandardlengt
7-8 hs offollowing class anddiametersuitable for rubber ringjoints (socketand spigot)
including all taxes,insurance, transportation,treightcharges,octroi,inspectioncharges,
loading,unloading, conveyance to departmental stores, stacking etc.
completeClassNP3Testpressure0.7Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
properposition , grade and alignment at all level as directed by Engineer-in- charge
includingconveyancefromstonetositeofwork,labourgivinghydraulictestingasperISIcode.
(a)300mminternaldiameterB)450Mm Internal
Diameter(C)500MmInternalDiameter,(D)60
0MmInternalDiameter
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The
proportion of concrete shall be one part of cement to 2 parts sand and 4 parts of blacktrapagg.
mix. of suitable size to as to produce uniform concrete through outthicknessofthepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458
classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes
withcementmortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially
preparedformation or on concrete bed and for the purpose to extra rate shall be given making
extraexcavationforbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelength. For each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop.
1:1 shall be forced into joints and chaucked completely by means of special cutting toolsuntil the
whole space is full. The mortar shall be sprayed around the collar joints so as
tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and
ifhe has any doubt as to their soundness be may required the contractors to cut open and
clearaway the cement of any joint that he may select and to make good the same at their
expensesprovided that, unless some defect be found, they shall be required to open more than
one jointsin 18mt (60’) of pipe, though if defect be found the Engineer direct them to open as
many jointsas he may deem necessary, the joints made one day will not as a rule, be inspected
until thefollowingdayandthecementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using
bestmaterials first class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofs
uitablesize soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/
classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of
thecollar shall be sufficiently large to allow a perfect joint around the outside of the pipes
withcementmortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on
speciallyprepared formation and for the purpose no extra rate shall be given for claming such
hollows inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoffintheformoffilleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly
togradient. M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in
satisfactoryworking of the same for 12months after it is put into commission, contractor must
satisfy IS458/1971andIS783/1959withreferencetoRCCpipe.
ItemNo.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
forfoundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM
1:3,finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamberseatcoveretc..completed.
(A) 0.60X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60X0.75mt.sizeInsideClear,Depthfrom0.0to0.90meterforpipedia<=20mm.
(C) 0.75x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand &10
partbrokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughlywetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quicklyrammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurinchargebeforetheworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the
case maybe all materials shall be stacked on the site as not to obstruct tra fic in any way the
masonaryshould be constructed in proper workmanship like manner with joints plunb etc. to
conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.Therateincludesallnecessarymaterualsmixinglayingandremainandwateringtheexpos
facestobefinishedwithneatcementasperinstructionthechannelshallbehalfroundandas
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneralspecifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirected
byengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunitofonenumberbasis.
Item ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling,
No.10 Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.SteelHdpe Coated Steps 35 CmC/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
15C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway
mmdia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00Meter(InsideClear, M.H. lengthshouldbeparalleltotheflow)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia<=300mm)
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcom
plywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesa
ndsizefrom 20to25m.m.
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughlywetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffi
centlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quicklyrammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurinchargebeforetheworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the
case maybe all materials shall be stacked on the site as not to obstruct tra fic in any way the
masonaryshould be constructed in proper workmanship like manner with joints plunb etc. to
conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.The rate includes all necessary materuals mixing laying and remain and watering
the exposedfacestobe finished with neat cement as per instruction the channel shall be half
round and asper drawing & instruction of Engineer in charge. proper bunching shall be provided
at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneralspecifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more
than300mmabove thebenching. Themanhole/inspectionchamberframeandcovershallbeofcast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers
andframes shall be cleanly cast and they shall be free from air and sand holes and from clod
shuts.They shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirected
byengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunitofonenumberbasis.
Item RatereductionoveritemofConstructingSlabTypeM.H.Chamberofsize1.00x0.75mtforconstruc
No.11 [email protected](Max.3unit\ofDM
shouldbereducedinthisitem)(AsPerR.A.BasedonBuildingSOR2015-16)
Item Constructing Slab type M.H. Chamber of the following size including excavation,
No.12 refilling,brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3,finishing with cement slurry, P/F 4 mm diaM.S.Steel HDPE coated steps 35 cm c/c
at 35cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
includingCantering& reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excludingthecostofManholeseatcoveretc..completed.ofSize1.00X1.40meter(InsideClear,
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Ex
cavation:ThisbedoneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand &10
partbrokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughlywetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quicklyrammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurinchargebeforetheworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the
masonaryshould be constructed in proper workmanship like manner with joints plunb etc. to
conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.The rate includes all necessary materuals mixing laying and remain and watering
the exposedfacestobe finished with neat cement as per instruction the channel shall be half
round and asper drawing & instruction of Engineer in charge. proper bunching shall be provided
at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneralspecifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedb
yengineerinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunitofonenumberbasis.
Item ExtrarateoveritemofConstructingSlabTypeM.H.Chamberoffollowingsizeforconstructing
No.13 M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof.
etc.complete.Ofsize1.00x1.40mt.(insideclear)andDepthfrom
Modeofmeasurement:
TherateshallbeforaunitofDMbasis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x
No.14 mtfor constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt
for(MHabove3.0mtdepth)belowGroundLevel(Max.5unitof DMshouldbereducedinthis
Modeofmeasurement:
TherateshallbeforaunitofDMbasis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
No.15 manholeof following size incl. excavation, refilling and & finished 15 mm thick cement
plasterinside in CM 1:3, P/F 4 mm diaM.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggeredinmasonryCM1:5,incl.costofRCCSlabinCC1:1.5:3,includingCantering&reinforce
ment as directed by engineer in charge. Rate includes carting of debris andexcavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalliat15C.M. c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth
(Slabatbelow1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt.
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM &reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt.
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand &10
partbrokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughlywetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsi
ssufficentlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding
20kms. in thickness and be well and quicklyrammend with heavy rammers, until
mortarcreams up to surface. The surface must be kept damp during and after consolidation
& inlaying consecutive layer the lower coars should be well watered & mode lough be for
thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D.
hand book No.2 The brick shall be wellburnt and free from any defects shall be
gotapprovedbytheEnginurinchargebeforetheworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book
specificationscement mortar for the brick work shall be one parts of cement to six part of sand
every brick wellsoaked in water is required to be ladi in joints of cement mortar the thickness of
which shall notexceed paints of 1.25 cm If after removal of centering any open joints are founed
these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according
toplan working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying
cement mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasurs boxes for sand and cement bag of 1.25 cft. or 1 cft. as measured the
case maybe all materials shall be stacked on the site as not to obstruct tra fic in any way the
masonaryshould be constructed in proper workmanship like manner with joints plunb etc. to
conform withgeneral specification No.45 P.W.D hand book. The face work should be neatly
finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts
ofcement 2 parts of sand 4 part of aggregates of black trap metalof other approved material
ofsizesfrom 0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the
exposedfacestobe finished with neat cement as per instruction the channel shall be half round
and asper drawing & instruction of Engineer in charge. proper bunching shall be provided at
both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts
ofsand in uniform thickness with surfaces truely in plumb. The work in general shall comply
withgeneralspecifi cations for )plaster no.64.P.W.D. hand book plastered surface shall kept
damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as
possoble. The maximum distance between inspection chambers shall beabout 25 meters.
Where the diameter of sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.The
minimuminternalsizesofmanhole/inspectionchambershallbe aspertherespective item of work.
The manhole/inspection chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstru
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M.
(1:3).The channel shall be semicircular in the bottom half and of diameter equal to the
sewer/drain.Above the horizontal diameter, the sides shall be extended vertically to the same
level as thecrown of the outgoing pipe and the top edge shall be suitable rounded off. The
branch channelsshall also be similarly constructed with respect to the benching out at their
junction with the mainchannel as appropriate fall suitable rounded off in the direction of flow in
the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection
chambersover 0.6 mtr in depth and shall be of cast iron conforming to IS:5455. These rungs
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall
be 450 mm below the manhole/ inspection chamber cover and the lowest not more than300 mm
above the benching. The manhole/inspection chamber frame and cover shall be of castiron of
specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They
shall be neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignont
he top surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner.
Thecovershallbegastight and water tight. The size of covers specified shall be considered as the
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition.
The coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover
shall be firmly embeded to correct alignment and level in cement concrete on thetop of the
masonry. The item shall be executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Mode
Therateshallbeforaunitofonenumberbasis.
ItemNo. Provdg.&layingS.W.Gullytrapwithbrickmasonry chamber
16 &watertightG.T.StoneincludingfixingofcoverSquaremouthtrap100mmx100mmsizeP-
ConstructingGullyTrapChamberWithMasonryInCementMortar1:5&PlasteringInCementMortar
1:3UsingG.T.StoneIncl.FixingCoverEtc.CompletedAsDirected.
Modeofmeasurement:
TherateshallbeforaunitofNosBasis
ItemNo. Making connection to the ex. M.H.in running sewer incl. Dewatering and otherrequired
17 machinery etc. of following dia pipes at any convenient time. All damaged
workshallbewellrepairedasperinstructions. etc..complete.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in
less. All damaged work shall be well repaired as per instruction of officer in charge.Proposed
R.C. C. line should be connected with the existing M.H. as directed. Holes made inthe well of
existing M.H. should be finished smooth and in circular shape as directed. Rate alsoincludes
making new channel or repairing existing damaged channel if instructed. Rate
isinclusiveofwateringetc.as directed.
Modeofmeasurement:
TherateshallbeforaunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in
18 runningsewerincludingcuttingbars,includingremoving debris /silt from the M.H. and
carting at a suitabledistanceetc..complete as directed. No payment for M.H. work will be
made until pipe isnotcutcompletelyinall respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshallbewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars
shall also have to be cut in existing manhole as per requirement and making good thesame. the
dis mental materials shall be carried tiplacesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshallbeforaunitofNosBasis
Item Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in
No.19- C.M.1:5andplasterinC.M.1:3andfixingC.I.stepsandM.H.andcartingthesameasdirected.A)…
B) ………………do ......................... Upto0.35mt.(@Fourcoarse)
C)………………do…………………Upto0.65mt.(@Sevencoarse)D)…
RepairingdamagedI.C./Raisinremovingdamagedbrickworkandrepairingbybrickmasonr
y in C.M. 1:5 and plasterinC.M.1:3andfixingC.I. steps andexistingchamber sheet
cover,removing the debris from chamber andcartingthesameasdirected.
Required level shall be achieved in brick work as specified including plaster, the thickness
ofjoints shall not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or
brokenbrickorasphaltmix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface
ofan asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the
brickworkwithsplayedfillerall around.
Water:Gullyframesbeingontheedgeofroadshallbefixedtothecorrectroadlevelatitsupperendandthes
lopeshouldbesuchitmustbeabout(12mm)(1/2”)lowerthanwatertable.
A concrete pavement should be case around the frames and covers of man-
holes,chambersetc. incaseofasphlaticroad.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4)
asspecified and directed. The pavement shall be at least 8 mm (3”) wider than the outer most
edgeof the circular frame no pavement will be made of this pavement under the item of
cementconcrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’)
inexternal measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the
longerdimensionbeingalongthedirectionofthemain.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4
C.C.No payment will be made for the pavement should be at least 8 cm (3”) wider than the
outermostedgeoftheframe.
After removing the top portion of the manholes, the proper brick masonry layer with
c.m.(1:4) should be constructed for proper bondage with old masonry and 8 cms thick PCC
work(1:2:4) should be laid on the top of brick layer an up to the bottom of the seat. After fixing
theseatthemanholeshouldbeproperlyleveledwithroadlevel.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall
becleanwithin48hoursofconcretingday.
M/SshallbegivenonNobasis.
ItemNo. RCC Precast M.H.Frame& Cover Manufacture, supply & Delivery at store or at side ofwork
21 Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type
design&DrawingincludingcostofreinforcementM.S. AnglesorFlat,cuttingmoldworketc.
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
3) HouseconnectionChamberLightDutyFr
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
22 matchexisisting road level in C.C. 1:2:4andfinishing smooth, watering and protectingfor
7days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from anystore)
Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
matchexisisting road level in C.C. 1:2:4 and finishing smooth, watering and protectingfor 7 days
etc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. ProvidingKachhaOfPakkaDummyIn TheFollowing Dia Pipes And Removing
23 TheSameAfterTheConnectionOfTheWorkAs Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the
sameafter the connecting of the work as per instruction of engineer in charge. If kachcha or
pakkadummy is not removed by the contractor then the penalty shall be laid as per municipal
rules orderivedbythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for
24 existingEHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in
line andleveltomatchexisisting road level in CC1:2:4and finishingsmooth,
wateringandprotectingfor7days etc.completeasperinstructionbyengg.incharge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-
35FRC MH cover, rate also incl. loading, unloading and fixing the frame in line and level to
matchexisisting road level in CC 1:2:4 and finishing smooth, watering and protecting for 7 days
etc.completeasperinstructionbyengg.incharge.
MeasurementsshallbegivenonKgbasis.
ItemNo. Raising of Existing manhole item includes,cutting of existing road surround by
25 Manholeby diamond cutter machine dismantling of road in confined area by breaker
andcartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanhole
at road level in CM 1:3 item also included fixing of Manhole frame at exact roadlevel by
using MaserEmaco S 488 trowablefibre reinforced thixotropic repair mortalmaterial
Laying of concrete made form Master Emaco 5 346 flowable micro concretematerial in
desired thickness and laying of hot bitumanous material in Upper layer andcompaction of
hot bitumanious material by palte compactor machine .Rate also
includednecessaryplasteratinsideofmanholeinCM1:3in20MMthicknessonraisedbrickwork.
Raising of Existing manhole item includes,cutting of existing road surround by
Manholeby diamond cutter machine dismantling of road in confined area by breaker machine
cartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanholeatroadlevelin
CM1:3itemalsoincludedfixingofManholeframeatexactroadlevelbyusingMaserEmacoS488
trowablefibre reinforced thixotropic repair mortal material Laying of concrete made
formMasterEmaco 5 346 flowable micro concrete material in desired thickness and laying of
hotbitumanousmaterialinUpperlayerandcompactionofhotbitumaniousmaterialbypaltecompactor
machine .Rate also included necessary plaster at inside of manhole in CM 1:3 in
20MMthicknessonraisedbrickwork.
Measurementsshallbegivenonno.basis.
ItemNo. Brickworkusingcommonburntclaybuildingbrickshavingcrushingstrengthnotlessthan35kg/
26 Sq.cm.incementmortar1:5(1cement:5finesand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-
6.Brickshall conformtoM-15Cementmortarshall conformtoM-11.
Theproportionofthecementmortarshallbe1:6(1cement:5finesand)byvolume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean
waterfor about two hours before use or as directed. The cessation of bubbles, when the bricks
arewettedwithwaterisanindicationofthroughwettingof bricks.
BricksshallbelaidinEnglishbondunlessdirectedotherwise.Halforcutbricksshallnotbeusedexcept
when necessary to complete to bond; closer in such case shall be cut to required
sizeandusedneartheendsofwalls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each
brickshall first be properly bedded and set home by gently tapping with handle of trowel or
woodenmallet.Itsidefaceshallbeflushedwithmortarbeforethenextbrickislaidandpressedagainst
it.Oncopletionofcourse,theverticaljointsshallbefullyfilledformthetopwithmortar.
Thewallsshallbetakenuptrulyinplumb.Allcoursesshallbelaidtrulyhorizontalandallverticaljoint shall
be truly vertical. Vertical joints in alternate course shall generally be directly one
overtheother.Thethicknessofbrickcourseshallbekeptuniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight
edges,mason’s sprit level, square half meter rub, and pins, string and plumb shall be kept on the
site ofworkforfrequentcheckingduringtheprogressofwork.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
theconnectedbrickworkshallbekeptnotmorethanonemeterovertherestofthework.Wherethisis not
possible, the work shall be raked back according to bond (and not left toothed) at an anglenot
steeperthan45degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to
bebuiltinwallshallbeembeddedincement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall
notexceed 12 mm. The face joints shall be raked out as directed by taking tools daily during
theprogress of work, when the mortar is still green so as to provide key for plaster or pointing
The face of brick shall be cleaned the very day on which the brick work is laid and all
mortardroppingremoved.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all
thefaces for a period seven days. The top of masonry work shall be kept well wetted at the close
Preparationoffoundationbed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared
ofall loose materials, cleaned and wetted before starting masonry. If masonry is to be laid
onconcrete footing, the top of concrete shall be cleaned and moistened. The contractor shall
obtainthe engineer'’ approval for the foundation bed, before foundation masonry is started.
Whenpuccas flooring is to be provided flush with the top to plinth, the inside plinth offset shall be
keptlowerthantheoutsideplinthtopbythethicknessoftheflooring.
Modeofmeasurementsandpayment:
Themeasurementsofthisitemshallbetakenforthebrickmasonryfullycompletedinfoundationuptoplint
h. Thelimitingdimensionsnotexceedingthoseshownontheplansorasdirectedshallbefinal.Battered,
tapered andcurvedportionsshallbemeasurednet.
No deduction shall be made from the quantity of brick work nor any extra payment made
forembedding in masonryormakingholesinrespectoffollowing items:
Endsofjoints,beams,posts,girders,rafters,purlins,trusses,corbelstepsetc.wherecrosssectionalarea
doesnotexceed500Sq.cm.
Openingnotexceeding1000Sq.cm.
Wallplatesandbedplates,bearingofslabs,chhajasanthelikewhosethicknessdoesnotexceed10Cms.a
nd thebearingdoesnotextendtothefullthicknessofwall.
Drainageholes,andrecessesforcementconcreteblockstoembedholdfastsfordoors,windowsetc.
Ironfixtures,pipesupto300mmdiaholdfastsanddoorsandwindowsbuiltintomasonryandpipesetc.forco
Formingchasesofsectionnotexceeding350Sq.Cm.inmasonry.
Aperturesforfireplacesshallnotbedeductednorshallextralabourrequiredtomakesplayingofjambs,thro
atingandmakingArchesovertheaperturebepaidforseparately.
Therateshallbeforaunitofonecubicmeter.
ItemNo. Supplying,labourforbreakdownrepairingworkforactivitieslikeexcavation,disliting,removing
27 debrisfromtrenchbackfillingetc.comp.asdirectedbyEng.incharge.
1) Mazdooratday/Night
2) Makadam/supervisionatday/NightM
odeofmeasurement:
TherateshallbeforaunitofNoBasis.
ItemNo. ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequiredthickne
28 ss and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc.comp.
ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequired
thickness and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc. comp.
TherateshallbeforaunitofSmtBasis
ItemNo. Providing15mmthickcementplasterinsinglecoatonRough(Similar)sideofsingleorhalfbrickw
29 allsforinteriorplasteringuptofloortwolevelandfinishedevenandsmoothin
(i)Cementmortar1:3(1-cement:3-sand)finishingwithafloatingcoatofneatcementslurry.
WaterM-1.TheCementmortarofproportion1:3shallconformtoM-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be
sound.These shall be properly examined before erection and use Stage scaffolding shall be
providedforceilingplaster, whichshallbeindependentofthewalls.
Preparationofback-ground:
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae,
afflorescenceand other foreign matter by water or by brushing. Smooth surface shall be
roughened by wirebrushing if it is not hard and by racking if it is hard. In case of concrete
surface, if a chemicalretarder has been applied to the form work, the surface shall be roughened
by wire brushing andall the resulting dust and loose particles cleaned off and care shall be taken
theretarderisleftonthesurface.Trimmingofprojectionsonbrick/concretesurfacewherenecessaryshal
lbecarried outtogetanevensurface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for
sufficientperiodbeforecarryingouttheplasterwork.
The work shall not be soaked but only damped evenly before applying the plaster. If the
surfacebecomesdrysuchareashallbemoistenedagain.
Forexternalplaster,theplasteringoperationshallbestartedfromtopfloorandcarrieddownwards. For
internal plaster, the plastering operations may be started wherever the buildingframe and
cladding work are ready and the temporary supporting ceiling resting on the wall
ofthefloorhavebeenremoved,Ceilingplastershallbecompletedbeforestartingplastertowalls.
ApplicationsofPlaster:
Theplasterabout15x15cms.Shallbefirstappliedhorizontallyandverticallyat notmorethan2metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall
betrulyinplane of the finished plastered surface. The mortar shall then be applied in
uniformsurface slightly more than the specified thickness, then brought to a true surface by
awoodenstraightedgereachingacrossthegaugeswithsmallupwardandsidewaysmovementata
time. Finally, the surface shall be finished off true with a trowel or wooden float according as
asmooth or a sandy granular texture is required. Excessive trowelling or overworking the
floatshall be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as
thecase may be and shall be carefully finished. Rounding or chamfering corners,
arrisesjunctionsetc.shallbecarriedoutwithpropertemplatestothesizerequired.
Cement plaster shall be used within half an hour after addition of water. Any mortar or
plasterwhichispartiallysetshallberejectedandremovedforthwithfromthe site:
In suspending the work at the end of the day, the plaster shall be left out clean to the line
bothhorizontally and vertically. When recommending the plaster, the edges of the old work shall
bescraped clean and wetted with cement putty before plaster is applied to the adjacent area
toenable the two to properly joint together. Plastering work shall be closed at the end of the day
onthe body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints
inplasterworkshallnotalsooccuronparapettopsandcopingsastheseinvariablyleadtoleakage.Noporti
onofthesurfaceshallbeleftoutinitiallytobepackeduplateron.
Eachcoatshallbekeptdamcontinuously tillthenextcoatisappliedorforaminimumperiodof7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of wallsshall be
avoided and only as much water as can be readily absorbed shall be used
excessiveevaporationonthesunnyorwindwardsideofbuildingin hot airordry weather shall
beprevented by handling mattings or gunny bags on the outside of the plaster and keeping
Modeofmeasurement&payment:
The rate shall include the cost of all materials, labour and scaffolding etc, involved in
theoperationsdescribedunderworkmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth
orheightshallbemeasuredcorrecttoacentimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open
jointsin brick work, stone work etc. or space between laths. Thickness of plaster shall be
averagethicknesswithminimum 10mm.atanypointonthissurface.
Thisitemincludesplasteringuptofloortwolevel.
The measurement of wall plastering shall be taken between the walls or partition
(dimensionsbefore plastering being taken) for length and from the top of floor or skirting to
ceiling for height.Depthofcoverofcornicesifanyshallbededucted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be
measuredseparately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of
joints,beams, posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for
openingsexceeding 0.5 sq.mt. and not exceeding 3.0 sq. mt. in each area deductions and
additions shallbemadeinthefollowingmanner:
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding
0.5sq. mt. each and no addition shall be madefor reveals, jambs, soffits, sills etc. of these
openingforfinishtoplasteraroundendsofjoints,beams,postsetc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made
asfollowsandnoadditionshallbemadeforreveals,jambs,soffitsetc.sillsetc.oftheseopenings.
When both faces of all wall are plastered with same plaster,
deductionshallbemadeforonefaceonly.
When two faces of wall are plastered with different types of plasters or
ifone faces is plastered and the other pointed, deductions shall be made from the plaster
orpointing on the side of frame for door, window etc. on which width or reveals is less than that
ontheothersidebutnodeductionsshallbemadeontheotherside.Wherewidthofrevealsonbothfaces of
all are equal, deductions of 50% of area of opening on each face shall be made
fromareaofplasterand/orpointingasthecase maybe.
For openings having door frames equal to projecting beyond the thickness of wall, full
deductionforopeningshallbemadefromeachplasteredfaceofthewall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening
butjambs, soffitsandsillsshallbemeasured.
The rate shall be for a unit of one sq.
metre.finishingwithafloatingcoatofnetcementslurr
y.Materials&Workmanship:
Thisworkisonlyofprovidingsmoothcementfinishwithfloatingcoatofneatcementslurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be
appliedto the plastered surface with a trowel to provide uniform texture while the base coast is
In any continuous face of wall the finishing treatment should be carried out continuously and
daytodaybrakedmadetocoincidewitharchitecturalbreaksinordertoavoidunsightlyjunctions.
Curing:Alltheplasterworkshallbekeptdampcontinuouslyforaperiodof7days.
Modeofmeasurements&payment:
Thepaymentshallbemadeforaunit of 1.0sq. mt. ofworkdoneoverandabovethefinishingofworkof
Therelevantspecificationsofitemofbasecoatshallbefollowedformeasurements andpayment.
Therateshallbeforaunitofonesq.metre.
ItemNo. Supplying cutting, bending, binding and placing in position steel as per plan and
30 designand as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonlyincluding lift up to 6 meter height or depth below GL for all diameters TMT
bars Fe-415gradeforalldiameters
The scope of work consists of providing and laying mild steel reinforcement and
TMTCRS Fe-500 reinforcement for RCC works of various components of the structure. This
beTiscooranyotherapprovedmanufacturerbranchandcorrosionresistantsteelbarsapprovedbythe
Engineer Incharge. This includes cuttings, bending, binding, placing, with all
equipmentsandlabour required for the work as directed by the City Engineer, Ahmedabad and
all operationscoveredwithintheintentandpurposeofthespecification.
BeingofReinforcement
Reinforcingsteel shall conform accurately to the dimensions shown on relevant
drawingsandconformingtotherelevantIScodes(latestrevision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the
CityEngineer, AMC, Ahmedabad using a proper bar bender, operated by hand or power to
attainproperradiiofbends.
Barsshallnotbebentorstraightenedinamannerthatwillcauseinjurytothematerial.
Bars bent during transport or handling shall be straightened before being used on
work;theyshallnotbeheatedtofacilitatebending.
ThebendingoftheTMTbarsshallbecarriedoutasperthefollowing:
S.No Operation Size TMTCRS-Fe-500
1 Bend Upto22 mmdia 3d
Over22 mmdia 4d
2 Rebend Upto10mmdia 4d
Over10 mmdia 5d
PlacingofReinforcement:
Allreinforcingbarsshallbeaccuratelyplacedintheexactpositionshownonthedrawings, and
shall be securely held in position during placing of concrete by annealed bindingwire not less
than 1 mm in size and conforming to IS:280 and by using stays blocks or metalchairs, spacer,
metal hangers, supporting wires or other approved devices at sufficiently closeintervals. Bars
will not be allowed to sag between supports nor displaced during concreting orany other
operation over the work. All devices used for positioning shall be of non-corrodiblematerial.
Wooden and metal supports will not extend to the surface of concrete, except
whereshownonthedrawings,placingbarsonlayersoffreshlylaidconcreteastheworkprogressesforadj
usting bar spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shallnot
be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or
otherapproveddevices.
Reinforcement after being placed in position shall be maintained in a clean
conditionuntilcompletelyembeddedinconcrete.Specialcareshallbeexercisedtopreventanydisplace
mentofreinforcementinconcretealreadyplaced.
To protect reinforcement from corrosion, concrete cover shall be provided as
indicatedon the drawings. All bars protruding from concrete to which other bars are to be spliced
andwhich are likely to be exposed for an indefinite period shall be protected by a thick coat of
neatcement grout.
In the case of columns and walls, vertical bars shall be kept in normal position
withtimbertemplateshavingslotsaccuratelycutinforbarposition.Suchtemplatesshallberemovedafter
theconcretinghasprogresseduptoaleveljustbelowthem.
Barscrossingeachother,whererequired,shallbesecuredbybindingwire(annealed)ofsize not
less than 1 mm and conforming to IS;280 in such a manner that they do not slip overeach other
at the time of fixing and concreting. As far as possible, bars of full length shall beused. In case
this is not possible, overlapping of bars shall be done as directed by the CityEngineer, AMC,
Ahmedabad. When practicable, overlapping bars shall not touch each other, butbe kept apart by
25 mm or 1 ¼ times the maximum size of the coarse aggregates whichever isgreater, by
concrete between them. Where this is not feasible, overlapping bars shall be boundwith
annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around
thelappedbars.Theoverlapsshallbestaggeredfordifferentbarsandlocatedatfixedlocationsonlyalong
thespanwhereneithershearnorbeingmomentismaximum.
WeldingofTMTbarscanbepermittedifspecifiedonthedrawings,jointsofreinforcement bars
shall be butt welded so as to transit their full strength. Welded joints shallpreferably be located at
points where steel will not be subject to more than 75 percent of
themaximumpermissiblestressesandweldssostaggeredthatatanyonesection,notmorethan
33 per cent of the rods are welded. No –pre-warning or post heat treatment is
necessary.Interpass temperature should be limited to 200º C with low heat input and equivalent
strength lowhydrogen type electrode. Suitable means shall be provided for holding the bars
securely inposition during welding. It must be ensured that no voids are left in welding and when
welding isdone in 2 or 3 stages, previous surface shall be cleaned property. Ends of the bars
shall becleaned of all loose scale, rust, grease, paint and other foreign matter before welding.
Onlycompetentweldersshallbeemployedonthework.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from
theactual site and their number and frequency of tests shall be as directed by the City
Engineer,AMC, Ahmedabad.
TheTMTbarsshallbetestedforanyorallofthefollowingtestsasdirectedbytheEngineerIncharge
Alternate immersion
testAtmosphericexposuret
estSulphur dioxide
testPotentiodynamictest.
ItemNo. Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
31 stoneaggregates20mmnominalsize)andcuringcompleteexcludingcostofformworkandreinfo
rcementforreinforcedconcreteworkin
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4proportion
measured by volume shall conform to relevant specification or ordinary grade1:2:4concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the sitecondition.
The concrete shall be mixed in a mechanical mixer at the work. Hand
mixermayhoweverbeallowedforsmallerquantitiesofworkandincaseoffailureofmachinesor as
permitted by the engineer-in-charge. It shall carried out on a water tight platformand care shall be
taken to ensure that mixing is continued until the mass is uniform
incolourandconsistency.Howeverin such cases 10% more cement than
otherwiserequiredshallhavetobeusedwithoutanycost.Themechanicalmixingshallbedone
foraperiodof /to2minutes.Thequantityofwatershallbethussufficientofproducea
dense concrete required workability for the purpose. Flooring of specified thickness
shallbelaidinaccordancewithapprovedpatternorasdirected.Finishingoperationshallstartsh
ortly after the cessation of beating and shall be spread over a period of one to
sixhoursdepending upon the temperature and atmospheric conditions. The
surfaceshallbe left for some time till moisture disappears from it. Fresh quantity of
cement shall bemixed with water to form a thick slurry and spread over the surface while
the concrete isstill green. Use of dry cement or cement and sand mixture sprinkled on
this surface tostiffen the concrete or absorb excessive moisture shall not be permitted.
The cementslurry shall than be properly paste twice by means of iron flats, once, when
the slurry isapplied and the second time when cement starts setting and finished
smooth. Thesurface shall be marked with string or B.R.C. fabric jali to make the surface
non slipperyas and when directed. The junction of floors with wall plaster dado or
skirting shall berounded where so required upto 25 mm. radius. Flooring in lavatories
roomsshallbelaidafterfixingofwaterclosetandsquattingpansandfloortraps,whichshallbeplu
gged while laying the floors and opened after the floors, are completed. Any
damage,donetowatersupplysanitaryfittingsduringtheexecutionofworkshallbemagegood.
Afterthefinalset,theconcreteshallbekeptcontinuouslywet,ifrequiredpondingfora
periodofnotlessthan7daysfromthedateofplacement.
The form work shall be provided if necessary as directed by the engineer in
charge.Concreting shall be done as per alternate bay method with necessary centering
witherbymasticorcementmortarasdirected.
Modeofmeasurement&payment:
The rate shall include the cost of all material and labour involved in all the
operationsdescribed above. No deduction shall be made or extra paid for any opening upto
sq.metreinareainthefloor,nothingextrashallbepaidforlayingtheflooratdifferentlevelsinthesameroom
or thecourt yard.
TherateshallbeforunitofoneCmt
ItemNo. Providing and installation of barricading with retro-reflective paint/ film/ tapes
32 (Minimum3.0Mt. height) as specified in the drawing & specifications for the construction
of roadwork, along with necessary diversion arrangement for existing traffic movement in
anunobstructedcondition,allrelevantmarkings,signboardsandilluminationasperrelevantM
ORT&H specification. Precoatedgalvanisedironprofilesheetsshallbeofapproved make and
shade having 0.50 mm (+0.05 %) total coated thickness with zinccoating 120 grams per
sqm as per IS: 277, in 550 mpa steel grade, 5-7 microns
epoxyprimeronbothsideofthesheetandpolyestertopcoat 15-18microns.Rate tobeinclusive
of all materials, fabrication works, paint works for information (retro reflectivepaint),
foundation works, transportation, loading, unloading, installation, dismantling
andinclusive of all taxes and including the same design for providing openable gates.
Noextrarentalwillbegiventothecontractorincaseofanydelaysfromhispartforconstruction or
due to any valid time limit extensions. Each barricading sheet is to
benumberedwithauniquenumber.Thebarricadingprovidedshallberetainedinpositionat
sitecontinuouslyi/cshiftingofbarricadingfromonelocationtoanotherlocationasmany
times as required during the execution of the entire work till its completion. Rate
includeits maintenance for damages, painting, all incidentals, labour materials,
equipmentsandworks required to execute the job. The barricading shall not be removed
without priorapproval of Engineerin- Charge. (Note :- One time payment shall be made for
providingbarricadingfromstartofworktillcompletionofworki/cshifting.Thebarricadingprovi
ded shall remain to be the property of the contractor on completion of the work).Blinkers
are to be installed on the barricading and rate for blinkers will be payable as
perrelevantitem. Barricadingistobecleanedbymeansof
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Barricading theentirebreakdownorexcavatedareaonrentalbasisusingwoodenballies
33 / M.S.angles at max. 2.00 metercentre to centre, C.G.I. Sheet, reflective paint / Board
outside to avoid accident & for smooth traffic diversion & movement including
cautionaryboard etc. Item also includes for making temporary sufficient nos of lighting
arrangementthrough out the work with necessary required arrangement. ..The same shall
be removedaftercompletionofwork.
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Manufacturing,andsupplaying steel vantilationcolums 15 cmsdia medium class pipewith
34 60 x 60cm 20 mm thick base plate and stiffeners C.I ormamental cap 50 Kg
andnecessareyfoundationnut bolts with one coat or red lead oxide paint etc as per
drawingand carting to theworksiteetc.
Modeofmeasurements&payment:
TherateshallbeforaunitofNos
ItemNo. Labour charges for erecting steel ventilation colums 15 cmsdia with ornamental
35 capsafety with the help of reqyuiredcapicity of hydra crane and base fixed with
necessareyfoundation with coat or lead oxide paint and two coat of any approved colour
with 15 cmsdia stone ware of RCC pipe connecting with MH including excavation and
jointing asrequired etc.
Modeofmeasurements&payment:Th
erateshallbeforaunitofNos
ItemNo. Providing and operation dewatering Pump including fuel charges & operator Charges
36 etc.asdirectedetc.comp. (ShiftforEightHour)(ForEachPumpSet)
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Hiring and operating Mud Pumps incl. Cost of fuel and operator includingthe
37 costoftoandfro transportation, laying of the delivery hoses as required, lowering and
liftingthe pumps as and when required etc. complete. Set Do As Directed. (No
paymentshouldbeallowedfornonworkingconditionofmachinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofHP/Hr.
ItemNo. Hiring and operatingthe 20 KV 3 Phase Electric Generator
38 foroperatingdesiltingmachinery,andlightingand otherrequirements with Arranging diesel
D.G.SetDoAsDirected.8HrsShift.(Nopaymentshouldbeallowedfornonworkingconditionofm
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation
39 andbreak down type work& also during unavoidable condition as per
instructionofengg.incharge,rateincludesallnece.shifting,fuelandoperatingchargesandstac
kingofuseful & non-useful materials separately up to store. (No payment shouldbe
allowed for non working condition of machinery and for
pipelineexcavationandlayingwork)
The item is for supplying JCB on rent for various construction activities The rate includes
variousoperational cost such asoperatinggenerater/electricity diesel,petrol, operater's salary,
when machine is in working condition all precautions shall be taken by contractor to avoid
theaccident.if any accident occurs contractor shall be fully resonsible for that. the payment shall
begiven on hour basis.No payment shall be given for idle hour and no time shall be counted
forcarryingmachinetositeandfromshiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-110capacityonrentalbasisincaseofemergency
40 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesallnece. shifting, fuel and operatingcharges
TheitemisforsupplyingMachinerentforvariousconstructionactivitiesTherateincludes
various operational cost such as operating generater/electricitydiesel,petrol, operater'ssalary,etc
comp. when machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall
be given on hour basis.No payment shall be given for idle hour and no time shall
becountedforcarryingmachinetositeand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-200capacityonrentalbasisincaseofemergency
41 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesallnece. shifting, fuel and operatingcharges.
The item is for supplying Machine rent for various construction activities The rate
includesvarious operational cost such as operating generater/electricitydiesel,petrol,
operater'ssalary,etc comp. when machine is in working condition all precautions shall be taken
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall
be given on hour basis.No payment shall be given for idle hour and no time shall
becountedforcarryingmachinetositeand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case
42 ofemergency situation and break down type work & also during unavoidable condition
asper instruction of engg.incharge , rate includesallnece. shifting, fuel and
operatingcharges.
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in
caseof emergency situation and break down type work & also during unavoidable condition as
perinstructionofengg.incharge,rateincludesallnece. shifting,fuelandoperatingcharges.
thepaymentshallbegivenonPer8hrShiftbasis.
ItemNo. SupplyingElectricBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
43 Operator, fuel, power Supply etc. Complete as Directed. (No payment should beallowed for
non working condition of machinery and for pipe line excavation and
M.H.work.Allowedonlyforbreakdownwork)
Modeofmeasurements&payment:Th
erateshallbeforaunitofShift
ItemNo. upplyingPneumaticBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
44 Operator,fuel,powerSupplyetc.CompleteasDirected.(Nopaymentshouldbeallowed for non
working condition of machinery and for pipe line excavation and
M.H.work.Allowedonlyforbreakdownwork)
Modeofmeasurements&payment:
TherateshallbeforaunitofHour
ItemNo. Hiringoftractorwithtrolleyconsidering8Hrs.asworkingdayhoursincl.Driver
45 Modeofmeasurements&payment:Th
erateshallbeforaunitofShift
ItemNo. HiringofThreewheelercarrier(Chakado/Rixa)considering10Hrs.asworkingdayhoursincl.Driv
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Levellingororientationofexistinggullytrapchamberincl.Nece.masonryinCM1:6andplasterinC
47 M1:3etc.using oldG.T.stoneandcoveretc. comp.
Modeofmeasurements&payment:
TherateshallbeforaunitofNos
ItemNo. ConstructingBombayPatternTypeCatchPitofsize0.60x0.60depthupto
48 1mtincludingexcavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of
CM (1:6) with40 mm thick IPS flooring in the propM15 at bottom and 15 mm thick cement
plasterinsidethecatchpitintheproportionofCM(1:3)withoutjalietc.comp.asdirected.
Catchpit shall be provided at every change of alignment, gradient or diameter
ofstormwaterdrains,Bendsandjunctionsinthesewer/drainshallbegroupedtogetherinchamberas far
as possoble. The maximum distance between inspection chambers shall be about
25meters.Wherethediameterofsewer/drainisincreased,thesoffitofthepipeshallbefixedatthesame
level and necessary slope given to the channel of manhole/inspection chamber. Theminimum
internal sizes of manhole/inspection chamber shall be as per the respective item
ofwork.Themanhole/inspectionchambershallbeconstructedasperthedetaileddrawingsandasdirect
ed by Engineer. The bed concrete and the brick masonry shall be constructed of suchthickness
as shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plasteredon both
faces with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in thebottom
half and of diameter equal to the sewer/drain. Above the horizontal diameter, the sidesshall be
extended vertically to the same level as the crown of the outgoing pipe and the top
edgeshallbesuitableroundedoff.Thebranchchannelsshallalsobesimilarlyconstructedwith
respecttothebenchingoutattheirjunctionwiththemainchannelasappropriatefallsuitable
rounded off in the direction of flow in the main channel shall be given. The channel at the
bottomof manhole/inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungsshall be provided in all manholes/inspection chambers over 0.6 mtr in
depth and shall be of castiron conforming to IS:5455. These rungs shall be fixed staggered
in two vertical runs,
mmaparthorizontallyand300mmc/cvertically.Thetoprungshallbe450mmbelowthemanhole/in
spection chamber cover and the lowest not more than 300 mm above the benching.The
manhole/inspection chamber framing and cover shall be of cast iron of specified weight
andshall conform to the requirements given in IS:1726. The covers and frames shall be
cleanly castand they shall be free from air and sand holes and from clod shuts. They shall
be neatly dressedand carefully trimmed. All castings shall be free from voids whether due
to shrinkage, gasinclusion or other causes.Covers shall have a raised chequered design
on the top surface toprovide an adequered nonslip grip. Cover shall be capable of easy
opening and closing and itshall be fitted in the frame in workmanship like manner. The
cover shall be gas tight and watertight. The size of covers specified shall be considered as
the clear internal dimensions of theframe.Coversandframesshall be coated with a
blackbituminous composition. The coatingshall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmlyembeded to correct alignment and level
in cement concrete on the top of the masonry. The
itemshallbeexecutedasperthedetaileddrawingandasdirectedbyEngineer
Modeofmeasurements&payment:TherateshallbeforaunitofNos
ItemNo. CatchPitJaliFixingP/FFRCcatchpitjaliwithframe600mmx600mmclearopeningetc.comp..Asdi
49 rected byengineerincharge.
Modeofmeasurements&payment:
TherateshallbeforaunitofNos
Providing and casting in situ CC in grade M-20 (proportions as per mix design or as
per table 9 of IS 456 2000 in masses by weigh batching) using granite, quartzite trap
metal of size 6 mm to 20 mm for RCC work, including scaffolding centering, form
work, needle vibrated consolidation, curing comp. up to 6 meter depth or height
(excluding cost of reinforcement and neat finishing) with centrering and shuttering/
deshuttering etc. comp. for structure for other than water retaining (Footing
(Without formwork)
Themodeofpaymentforthisitemshallbeoncm
Structural steel work riveted, bolted or welded in built up for all type sections,
inframed work, including cutting, hoisting, fixinginpositionand applying
aprimingcoat of approved steel primer all complete as per the structural designsand
directions of Engineer in charge..
Themodeofpaymentforthisitemshallbeonkgs
Providing Fabricating and fixing MS Grating Jali for Machinehole having 65 X 65 X
mm MS Angle with Horizontal and Vertical 65 X 10 mm MS Flate with 50 mm Spacing
at equal distance. Work includes with oilpaint and Transportation on site work
comp. as per Instruction by Engg. incharge.
ThemodeofpaymentforthisitemshallbeonNOS. Basis.
ItemNo. Demolitionincl.stackingofserviceablematerials&disposalofunserviceablematerialswith all
53 leadandlift.
(c) TilesorStoneflooring(20.23,page219)
Demolishing work shall be carried out as per instructions given by the Engineer in
charge.Demolishing of stone slab pavement or any other type of paving, proportion of
cement or lime,sorting out materials, carting them up to lead of 50 mts. &Stacking the
materialsseparatelyasdirectedbytheEngineerinchargeofwork.Theworkshallbedonecarefully
I.S.Sieve Percentbyweightpassingthe
CoarseAggregate
ItemNo. ProvidingandLayingofRubberMouldedPaverBlockGrey/Coloured60mmthick,M-
54 35Gradeofanysize;shape(UsuallyUni-
PaverBlocks)usingblacktrapgoodqualityaggragateof20mmnominalsizeforfootpath,parking
areas,servicelanesandotherareasasmentionedinthedrawing/instructionofengineerincharge
.Costincludesformworksusingrubbermould,Rateprovidingandlayingpaverblocksasperrequi
redgrading and specification. The paver block shall be mechanically compacted. The work
ofpavingblocksshallbeexecutedinlineandlevelbyskillmasonofflooringworkonly.Itshould be
laid in such a way that the no cutting of the paver block to be necessary.
ifcuttingofpaverblocknecessarythenitshouldbecutbymachineonlyandcarting.Thefinisheds
urfaceofthepaverblockshallhaveresonablygood,plainfinished.Paverblocksshallbecompact
edandshallberelaidifnecessary.Gravelorsuchtypeofmaterialsshallnotbeallowedfor
production. Laying on5cms thick sandbedding(AsperARC)
PaverBlockManufacturingFacilities:
ThePaverBlockshallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
ThemachineshouldbecapableofproducinghighqualityPaverBlocksbyobtaininghighlevel of
compaction by application of hydraulic compaction and also by high intensity vibration
tothemoulds.Themachineshouldhaveautomaticcontrolpanelforuniformityinstrength.
ConcreteBatching&MixingPlant:(Notessential)
The concrete Mix Design should be followed for each batch of materials. The
concreteingredient should be mixed in concrete Batching & Mixing plant with minimum
capacity of 30cum/hour. The plant should equipped with automatic control panel for
maintaining water cementratio from batch to batch to obtain concrete of uniform quality
and strength. The plant should beequipped with adequate mechanism for mechanized
loading of raw materials into mixer andconveyor belt for transportation of concrete from
mixer to concrete block making machine tomaintainqualityofwetcement.
1.3. Curing:-Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringof
Laboratory(Desirablebutnotessential):
Thefactoryshouldhavethefollowing:
Compressiontestingmachineofadequatecapacity.
Othertoolsandequipmentfortestingrawmaterialsandpaverblocks.
(1).Systematicrecordoftestresultsofvariouspaverblocksmanufacturedinthefactory.
I.S.Sieve Percentbyweightpassingthe
(2).ConcreteMixDesignforvariousgradeofconcreteusedformakingof paver
II) SPECIFICATIONSFORCOLOUREDPAVERBLOCKS:
Coloured concrete paver blocks shall be manufactured as per attached specifications
usingapprovedcolourPigmentof“BAYER”Make“BAYFERROXIRONOXIDEPIGMENTS”withminim
umcolour pigment of 3% by weight of cement. The colour shade shall be “RED” asselected by
HPCL before commencement of the work. White cement shall be used for coloredpavers to
obtain the desired colour shade. The job also includes providing 50 mm thick
sandbeddingtomatchtheshadeofthepaverblock.
The colour of the paver block shall be guaranteed against fading of colour for period of
12monthsfrom thedateoflayingofthesameat site.
All other technical specifications & Procedure for testing, laying & sampling of
colouredpaverswillbeasperattachment.
III) PAVERSBLOCKCHARACTERISTICS:
Theconcretepaversshouldhaveperpendicularitiesafterreleasefromthemouldandthesameshouldberetai
neduntilthelaying.
The surface should be reasonably smoothe and of anti skid and anti
glaretype.Thepavershouldhaveuniformchamferstofacilitateeasydrainagesurfacerun
Thepaversshouldhaveuniforminterlockingspaceof2mmto3mmtoensurecompactedsandfillingaftervibra
tiononthepaverSurface.
Theconcretemixdesignshouldbefollowedforeachbatchofmaterialsseparatelyandautomaticbat
chingplantistobe usedtoachieveuniformityinstrengthand quality.
Thepaversshallbemanufacturedinsinglelayeronly.
Skilled labour should be employed for laying blocks to ensure line and level of laying,
desiredshapeofthesurfaceandadequatecompactionofthesandinthejoints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers
refer“specificationsforcolouredpavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm
X250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used
forkerbingshallbecuredproperlyfor7daysminimum.
IV) PaverBlockDimensions:
Thickness 60mmor80mm
Shape Uniregular(UniformH Shape with no
ollowOrCreacks)
Chamfer 4mmto6mmalongtopedges
Colour Naturalcementgreycolourwithoutuseofa
For coloured pavers refer
“specificationsforcolouredpavers”
DimensionalTolerance (+/-)2mmforlength&width,
(+/-)3mmforHeight(Thickness)
V) TestingofPaverBlocks:
NO. Values(AverageofMi
nimumFiveSamples/
1. CompressiveStrength Min.45N/Sqmmfor80mmthi
ckORMin.30N/Sqmm
2. FlexuralStrength Minimum4.5N/Sqmm
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum5.80%
380 Kg/Cum (Not
5. MinimumCementContact
*SamplingandTestingprocedureasperenclosedspecifications
SAMPLINGANDTESTINGPROCEDURESFORPAVERBLOCKS.
INTERNAL–Averageofminimum3samplesper5000Blocks.
Essential–Minimum2Blocksper10000bocks.Averageofminimum8blockspersite.
1. SamplingForTesting
SamplingfortestingofpaverblocksshallbedoneinaccordancewithAppendix-
A.CompressiveStrength
TestingforcompressivestrengthshallbeundertakeninaccordancewithAppendix-
B.Theaveragecompressivestrengthofthebockstestedshallbe40N/Sqmm.
AbrasionResistance
TestingforabrasionshallbeinaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles)–
FlexuralStrength
TestingforflexuralshallbenaccordancewithIS1237(SpecificationsforCementConcreteFloorTiles)–
WaterAbsorption
TestingforwaterabsorptionshallbeinaccordancewithIS2185:1979:PartI(Specifications
forConcreteMasonryUnits)–AppendixE.
ItemNo. Provdg. & laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 hand
55 brokenstoneaggregates40mmnominalsize)andcuringcompleteexcludingcostofformworkin
.(Bldg.Sor2015-16,itemno.5.3.4,pageno-49)
(A)Foundationandplinth
Before starting the concrete the bed of the foundations trenches shall be cleared of all
loosematerialsandwateredandrammedasdirected.
The proportion of cement, sand and coarse aggregate shall be one part of cement, 3 parts
ofsand,6partsof stone aggregatesandshallsomeasuredbyvolume.
The concreteshall be mixedin a mechanical mixer at the site of work. Hand mixing mayhowever
be allowed for smaller quantity of work if approved by the Engineer-incharge. Whenhand mixing
is permitted by the Engineer-in-charge incase of breakdown of machinery’s and inthe interest of
the work. it shall be carried out on a water tight platform and care shall be taken toensure that
mixing is continued until the mass is uniform in colour and consistency. Howeverinsuch cases
10% more cement than otherwise required shall have to be used without any extracost. The
mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity
ofwatershallbesufficienttoproduceadenseconcreteofrequiredworkabilityforthepurpose.
The concrete shall be handled from the place of mixing to the final position in not more than
15minutes by the method as directed and shall be placed into its final position, compacted
andfinishedwithin30minutesofmixingwithwateri.e.beforethesetting commences.
Theconcreteshallbelaidinlayersof15cms.to20cms.
Theconcreteshallberammedwithheavyironrammersandrapidlytogettherequiredcompaction
andtoallowalltheinterstrieestobefilledwithmortar.
Afterthefinalset, theconcreteshallbekept continuously wet, ifrequiredby pounding foraperiodof
not lessthan7daysfromthedateof placement
Theconcreteshallbemeasuredforitslengthbreadthanddepth,limitingdimensionstothosespecifiedonp
lanorasdirected.
Therateshallbeforaunitofonecubicmeter.
ItemNo. LabourworkforfixinganykindofpavingwithcementpointinginCM1:2,includingwaterin
56 g,rammingetccomp.asdir.ForpavementI)LayingonSandbeddingasperrequirementto
fixtheC.C.Block/NibhadaStoneinLine&Level
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm
thsandbedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp.
A)LayingonsandbeddingasperrequirementfofixtheCCblock/nibhadaStoneinlinelevel
Themeasurementshallbeforaunitofonesq.metre.basis.
ItemNo. Labour work for reinstament or asphalt pavment covering excvationwateringconsoldation
57 resoiling meating with the activity of teackcoat including carting the
mixfromtheneareststorepactingitwithconvayancechargeofexcavationearthetc.compasdire
Labour work for reinstament or asphalt pavment covering excvation watering
consoldationresoilingmeatingwiththeactivityofteackcoatincludingcartingthemixfromtheneareststore
pactingitwithconvayancechargeofexcavation earthetc.compasdirected.
Modeofmeasurements&payment:
TherateshallbeforaunitofSmt
ItemNo. Providing,laying,spreadingandcompactinggradedstoneaggregatetowetmixmacadamspeci
58 ficationincluding premixing the Material with water at OMCin mechanical mix
plantcarriageofmixedMaterialbytippertosite,layinginuniformlayersinsubbase/ basecourse
on wellprepared surface andcompactingwithvibratory roller to achieve
thedesireddensityasperMoRTHclause406
TheprovisionofMORTHClause406shallapplyduringconstructionofWetMixMacadam.
TherateshallbeforaunitofoneCmt
ItemNo. Supplyofgradedmachinecutblacktrapstoneaggregate(metal)ofSevaliya/Timaor
59 equivalentqualitymetalofsize25mmto40mm.
The Aggregates shall consist of Black trap machine crushed stone only, obtained
fromquarries situated in Sevaliya /Timba or equivalent.It shall remain visibly black on immersion
inwater. They shall be clean, strong, durable of fairly cubical shape and free from
disintegratedpieces, organic or other deleterious matters and adherent coating. They shall be
free fromelongated and flakypiecealso.Thesizeoftheaggregateshall be below.
AsshownintheTable-500-7
Specific gravity: minimum.
2.5WaterAbsorption:Maximum2
%Impact Value:Maximum30%
LosanglesabrasionValue:Maximum40%Cr
ushingStrength:Maximum30%
Flakiness&ElongationCombined:Maximum30%
ForstackingrelevantSpecificationofItemNo.A-
3shallbeapply.Therateshallbepaidoncubicmetrebasis.
Labour workforspreadingthemetal85mmthickinsinglelayer,incl.providing&applying
ItemNo. bitumen for semi grouting 2.5 kgs/sqm. & Providing & spreading the key blacktrap
60 aggregate of good quality on top at the rate of 0.013 cmt. per sq.m. of size
mmpassingin9.5 mmretainrollingwith10tonnerolleretc.comp.asdirected
The metal shall be screened of any rubbish, dust or grass. Then metal shall be
laiduniformly in two layers of 50 mm each, to the required grade and camber as directed by
theEngineer in charge. Laying of metal shall be started after
theconsolidatingsolinglayersprepared perfectly to the proper line level and camber. Where
camber of soling is founddoubtful it shall be corrected prior to spreading metal. Metal filled in
the basket shall be spreadevenly in required number of layers as directed. Metal shall be
spread in proper grade andcamber if required using camber boards, so as to ensure the
corrected surface. The surfaceshall be checked at every 15 mts. by means of template and
string for correctness of thecamber. The consolidation of metal shall be done by the contractor
with a minimum 8 to 10 Troller. The contractor shall provide required number of labors at the
time of rolling to rectify theundulation that might have occurred during rolling.To carryout
grouting of the above said 50mm thick metalling coat the contractor shall bring all the required
equipment and materials asdirected. Bitumen of VG10 grade penetration of approved quality
heated to a temperature ofabout 150 C. and shall be applied hot by means of a sprayer
uniformly over the surface at therate of 1.5 kg./sq. mt. up to the satisfaction of Engineer in
charge. Immediately following theapplication of bitumen and while it is still hot second layer of
metal shall be spread in properthickness and again application of bitumen at the rate of
kg./sq. mt. as above for secondlayer shall be done. Key aggregate of as specified in below
table and of approved quality shallbe evenly spread out at rate of 0.013 cum. per sq. mt. After
spreading the chipping the wholearea shall be rolled over thoroughly with a 8 T to 10 T. roller It
is important that the rollingshould be done while the bitumen is still soft and it should be
continued until the road sets andthereisnosettlementundertheroller.
During the period between the initial compaction of coarseaggregateand
compaction of the surface course shall be protected form all traffic other than essential toits
construction, till the final compaction level is attained. All above operation shall be carried
bythe contractor using his equipments and material including fuel or wood required for
burningetc.andasdirected up totheentire satisfaction of Engineerin charge.
AsshownintheTABLE-500-7
I.S.Sieve Percentbyweightpassingthe
Themodeofpaymentforthisitemshallbeonsq.mt.basis.
I.S.Sieve Percentbyweightpassingthe
CoarseAggregate
CONTRACTOR'S SIGNATURE ADDL.CITYENGINEER
&STAMP (WestZone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATIONS
Name of Work :- Repairing/Renew of Breakdown MH and P/L
/Repairing Drainage line At Sabarmati Area, Motera Area, Nursery
Area, D mart Area And Different Places Of Ward in Sabarmati
wrad, WZ. (A.R.C)
(1) The work shall be completed within 12 Months.(ARC Tender)
(2) The contractor shall be remain responsible for Workmen’s compensation if any when such
case occurs. The contractor shall arrange formed iampasant night and fencing and pagi
and shall be responsible for any damage of life and limb or property if any happen, during
the execution of work. In case of dispute for unseen or overlooked items the decision of the
city Engineer shall be final. The contractor shall have to give site clean of all rubbish on
completion of work and have over the building with final finishing of the work as directed.
All the rejected materials shall be removed from site within 24 hours by contractor at this
(3) For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In
oncase he shall be allowed to mix the mortar either on floor or any finished surfaces.
(4) The contractor shall have to make his own arrangement for water required for the work and
shall pay the water charges as per water meter.
(5) If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by C.E. as per the rate analysis based on
current market rates.
(6) If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without
charges any extra and the contractor will have to carry out the works and he will be paid at
the rate quoted by him and no claim for extra for subsequent changes may be entertained.
(7) Retetion money at the rate of 2% shall be deducted from every running bill of the
contractor and which will be paid at the time of final bill, for works costing More than Rs.
(8) The tender for the work shall remain open for a period (120) days from the date of opening
of the tenders for this work and that the tenderer shall not be allowed to withdraw on
modify the offer on his own during the period. If any tenderer withdraw or makes any
modifications (s) or addition (s) in the terms and conditions of his tender not acceptable to
the Municipal Corporation the Municipal Corporation shall without prejudice to any right or
remedy be at liberty to forfeit in full the said earnest money absolutely.
(9) As per Circular No. MCR 2176 (96) 2418 (ii) GHH dated 31-03-77 issued by Government
of Gujarat contractors are requested to produce their quarry materials for construction work
through legal sources. i.e. only form the quarry lease holders, permit holder or middle man
who satisfies the contractor as to the legality of the source of purchase by him on these
(10) If the work is not carried out within the specified time limit in clause no.1 the penalty of
% per day of remaining work after Stipulated time limit and maximum 10% of
remaining work for the entire period of delay shall be recovered from the immediate bills
payable to the contractor.
(11) Contractor has to make his own arrangement for procurement of steel and cement.
(12) Conditional tender will not be accepted.
(14) All tenders are to be submitted in duplicate without which the tenders are liable to be
(15) Condition of form B1 Standard Specification of material & code of practice will be
applicable. Form B1 & B2 can be is available on website.
Contractor’s Signature Add. City Engineer
ybœtJtœBgwÂlÂmvjftuvtuohuNl
bntldhmuJtmœl–vrùbÍtul
vrùbÍtulÍtuljytuVem,
1. Wvhtuf<xuLzhtusu<u JdobtkbtLghSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuChJt.
2. xuLzhlerlg<xuLzh Ve <&t R.yub.ze. ck^ fJhbtkkWvhltmhltbuÁcÁ / hSMxhyu.ze./MvezvtuMx/ fwhegh&erlg<mbgbtkbtufjJtlthnuNu.
3. ftuLx[tfxh©eytuyuxuLzhlemt&uBGþrlrmvjbtLghSMx[uNlle/ dJobuLxhSMx[uNlleftuve, (xuLzhftuve<&t yLgvwhtJtmt&u)
yawfmtbujfhJtlehnuNuylufJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.ck^ fhJhWvhxuLzhltuxemlkch, xuLzhlkch,
ftblwkltb<&t, ftuLx[[tfxhlemkM&tlwkltb<&t ftuLxufxlkchyJ~gœNtoJJtlthnuNu. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch,
btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
4. xuLzh Ve vu ytuzoh / zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.
5. ytuAehfblexuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
6. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhLxe / zebtLzz[tVx / vu ytuzoh / jtufjbtRfhauf&e s
MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt. yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh
auf, rzbtLzz[tVx, vu ytuzoh fu cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLzz[tVx, vu
ytuzoh fu ckufduhkxeltMJYvbtkytvJtlehnuNu.
7. cukfduhuLxebtºtybœtJtœNnuhle s MJefthJtbtkytJNu.
8. xuLzh Ve <&t R.yub.ze.lehfbltze.ze./auflevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwkltb<&t btuctRjlkchyJ~gjFJtltuhnuNu. ftuLx[t¾xhu
vtu<tlemkkM&tlt auf <&t ze.ze. xuLzhR~gw><theFctœlt s ytvJt.
9. Nh<e xuLzhtuhœct<j dKtNu.
10. stuxuLzhbtkMvÐWÕjuFfhtgujntug<tuatubtmtlufthKu Ft<tfegMËaltyLJgußgthußgthuftb ck^ htFJtLþk&tg<u
mbgluftbleBþÆ<btkbshuytvJtbtkytJNu. vhkðþytyLJguftuECtJJ^thtuytvJtbtkytJNulne. suleltuk^ >hufxuLzhhujuJe.
11. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJt fu lrnkMJefthJt<ule mkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
12. xuLzhbtkstuftuRmwDthtJDthtntug<tu<u ykdxuLzh Ch<t vnujtAuÕjuœJmurlg<JucmtRxy&JtfauheyusYhe<vtmfhelu s xuLzhbtufjJw.
13. mefgtuhexezevtuÍex/ vVtuboLmduhuLxelehfbYt. yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh fu
cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxumefgtuhexezevtuÍex/ vhVtuboLmduhkxelehfbbtºtrzbtLzz[tVx, vu ytuzo h
fu ckufduhkxeltMJYvbtkytvJtlehnuNu.
14. ytuljtRlyul-«tufgwhJucmtRxvh&eChJtlt&<t xuLzhbtkftuLx[tfxh/
yusLmeyuxuLzhlentzoftuvebtkCtJCgtoJdhlemnemefftfhemcbexfhJtlehnuNu. stu<ubtkCtJChujnNu<tu<uJtxuLzhhœfhJtbtkytJNu.
15. mœhxuLzhbtk ”GST rl<e rlgbbwscjtdwvzNu ”<u bwscdK<he fhexuLzhtuChJtlthnuNu.
zebtLzz[tVx / auf “BgwÂlÂmvjfÂb§h©e, ybœtJtœ” ltltbltufZtJJtu.
16.dwsht<mhfth©elt ©b,ftu~ÕgrJftmyluhtusdthrJCtdXhtJ ¢btflk. LED/WRT/e-
file/11/2024/0293/M2 mraJtjg,dtk^eldh<t.15/02/2024 bwscfboathe
©bgtudlestudJtRvhevqKo&tg<u mwrlrµ<fhJtlwk hnuNu.
ybœtJtœBgwÂlÂmvjftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtkJfoytuzhytÃgtctœftb NY fhJtlembgbgtoœtbtkftuLx[tfxhîthtftb NY fhJtleòKfgtoctœ
24 fjtfltftb NY
lrnfhJtbtkytJu<tuyLgftuLx[tfxhvtmubtfuoxhux&eftuLx[tfxhltFaouylustuFbuftbdehefhtJJtbtkytJNu.
2. ftuLx[tfxhluJfoytuzohytÃgtctœ yu.yth.me. «fthlkwxuLzhntuRftblesYhegt<bwscxujeVtulefòKfhesu<u ftb NY
fhJtfnuJtbtkytJNuylusuftbleòKfgtolt 24 fjtfbtk NY
fhJtbtklrnytJuylurlg<mbgbgtoœtbtkvwKofhJtbtklrnytJu<tusu<u ytRxbltSOR CtJ&e
dKevulÕxeJmwjjuJtbtkytJNu.
3. ºtK fu J^wJthWvhbwscleyLgftuLx[tfxhvtmu&eftbdehefhtJJtleVhsvzNuylu/y&Jt ºtK fu
J^wJthvulÕxefhJtleVhsvzNu<tu<u mkstudtubtkftuLx[tfxhluçjufjeMxfhJtbtkytJNusuleykr<b m•tt Bgw.frb¹lh©elu
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide
lines. If child labour is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw
enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then action will be taken for
contempt of Supreme Court Judgement and also will be prosecuted by concerned authority. Because of the breach
of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal Corporation
becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is
taken and the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to
follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be
entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C.
The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the
tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the
documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the
contract documents. The full consideration shall be given to such addendum or corrigendum or correction before
submission tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or
corrigendum or correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the
number of addendum issued and enclose the same with the tender documents,failing which the tender shall be
liable for rejection and no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 36.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].