Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹10,583
Closing Date
10 Jun 2026, 1:00 pm5d left
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER PWD BUILDINGS SUBDIVISION THRISSUR
Tree Pruning Works
2026_PWD_853994_1
PWD/BLDG/TR/6147/2026
Open Tender
Civil Works - Buildings
120 days
Ayyanthole
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,583
Yes
3 Jun 2026
3 Jun 2026
12 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1ESTIMATE | ||||||
| 1.001 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 377.65 | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | 675.98 | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 919.09 | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | 2,454.32 | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | 11,391.49 | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | - | each | 22,821.34 | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | OD23570/2026-2027: Engaging wood cutter | - | each | 1,161.5 | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | OD23569/2026-2027:Engaging coolies | - | each | 1,082.18 | - | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1443330.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid