| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-Finance | ₹5.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹5.9 LAccepted-Finance ARUVEETTIL HOUSE KARUVAMBRAM PO ACHIPILAKKAL MANJERI 3 MALAPPURAM 676123 | MANJERI | MALAPPURAM | KERALA | 676123 | ₹5.9 L | 2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Favas Aruveettil L2 | M P Babu L1 |
|---|---|---|---|---|---|
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 25 | cum | 359 ₹8,975 | 280.28 ₹7,007 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7 | cum | 6,959 ₹48,713 | 6,180.88 ₹43,266.16 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 70 | cum | 6,853 ₹4,79,710 | 6,500.8 ₹4,55,056 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3 | cum | 9,376 ₹28,128 | 7,763.36 ₹23,290.08 Lowest |
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 200 | kg | 99 ₹19,800 | 87.6 ₹17,520 Lowest |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 10 | sqm | 770 ₹7,700 | 654.17 ₹6,541.7 Lowest |
Tender Value
₹6.6 L
EMD Value
₹16,551
Closing Date
24 Jun 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil) Engineering Department University of Calicut Calicut University P O Malappuram District Kerala 673635
Urgent side protection work at the entrance area of UTEC, Poomala to prevent landslide near the sloped road.(Re Tender)
2026_UoC_856134_1
D1/586/2026
Open Tender
Civil Works - Others
Item Rate
60 days
CUTEC POOMALA, SULTHAN BATHERY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,723
Yes
₹16,551
Yes
27 Jun 2026
16 Jun 2026
26 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 1.006 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1447063.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
DECLARATION.pdf
Additional Documents • 0.12 MB
epaymentform.pdf
Additional Documents • 0.01 MB
PreliminaryAgreementFormat.pdf
Additional Documents • 0.24 MB
Tenderdocumentspoomala2.pdf
Tender Documents • 1.53 MB
BOQ_1447063.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].