Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹31,013
Closing Date
31 Oct 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Naval Base Karwar 581308
REPAIRS / OVERHAULING OF VARIOUS COMPRESSORS ONE NAVAL VESSEL
2023_NAVY_624892_1
REG-4001-COMPRESSORS
Limited
Marine Services
Item Rate
90 days
Naval Ship Repair Yard Naval Base Karwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹31,013
Yes
1 Nov 2023
25 Oct 2023
1 Nov 2023
26 Oct 2023
31 Oct 2023
26 Oct 2023
Amount
HPAC-1 Scope of work
i. Dismantle complete compressor units and measure. ii. Dismantling and assembling procedures are to be correctly followed as per maintenance manual art 4.4. iii. Carry out performance check after completion. Iv. Carry out overhauling of compressor along with replacement of all consumables and critical sub components.
i. Carry out full functional test of safety valves. Check set pressure, full flow and reset pressure.
Check servicebility and calibration of following measuring instrumentation and safeties. i. PD Pressure sensor range 0-100 Bar ii. Pressure gauge range 0-125 Bar iii.Pressure gauge range 0-250 Bar
i. Remove first, second, third and four stage suction and delivery valves. ii. Check for wear down and pitting. iii. Clean all components in kerosene and gauging . Iv. Repair / replace as necessary.
HPAC-2 Scope of Work
i. Dismantle complete compressor units and measure. ii. Dismantling and assembling procedures are to be correctly followed as per maintenance manual art 4.4. iii. Carry out performance check after completion. Iv. Carry out overhauling of compressor along with replacement of all consumables and critical sub components.
i. Carry out full functional test of safety valves. Check set pressure, full flow and reset pressure.
Check servicebility and calibration of following measuring instrumentation and safeties. i. PD Pressure sensor range 0-100 Bar ii. Pressure gauge range 0-125 Bar iii.Pressure gauge range 0-250 Bar
i. Remove first, second, third and four stage suction and delivery valves. ii. Check for wear down and pitting. iii. Clean all components in kerosene and gauging . Iv. Repair / replace as necessary.
DD Compressor Scope of Work
i. Dismantle complete compressor units and measure. ii. Dismantling and assembling procedures are to be correctly followed as per maintenance manual art 4.4. iii. Carry out performance check after completion. Iv. Carry out overhauling of compressor along with replacement of all consumables and critical sub components.
i. Carry out full functional test of safety valves. Check set pressure, full flow and reset pressure.
Check servicebility and calibration of following measuring instrumentation and safeties. i. PD Pressure sensor range 0-100 Bar ii. Pressure gauge range 0-125 Bar iii.Pressure gauge range 0-250 Bar
i. Remove first, second, third and four stage suction and delivery valves. ii. Check for wear down and pitting. iii. Clean all components in kerosene and gauging . Iv. Repair / replace as necessary.
BA Charging Compressor Scope of Work
i. Remove and transportation of compressorunit from workshop for overhaul.
ii. Dismantaling of compressor and cleaning internal parts.
iii. Examine pistons, liners,cylinders, piston rings, crankshaft and connecting rods. Renew parts as necessary.
iv. Remove and clean air cooler.
v. Change the compressor lubricant oil.
vi. Examine moisutre trapper and 2nd stage relief valve. Renew if required.
vii. Inspection of check valves, NRV and SRV.
viii. Box up compressor, fitment of check valves, NRV and SRV.
ix. Carry out comprehensive performance trail of the compressor including capacity trails.
Mercury Ship Repairs Pvt ltd
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .