| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | ₹17.7 L | L1 | Accepted-AOC FirstLowestBidder |
| 2 | L2₹20.1 L+₹2.4 L (13.6%)Rejected-Finance FLAT NO 1301 2 6 ARJUN DROPATI COMPLEX AUCHIT WADDO TIVIM BARDEZ GOA | ₹20.1 L+₹2.4 L (13.6%) | L2 | Rejected-Finance SecondLowestBidder |
| 3 | L3₹20.7 L+₹3.1 L (17.5%)Rejected-Finance | ₹20.7 L+₹3.1 L (17.5%) | L3 | Rejected-Finance ThirdLowestBidder |
| Sl No | Description | Qty | Unit | M/S BUILD GREEN ENGINEERS L1 | SHABNAM CONSTRUCTIONS L3 | M s Noor Engineering L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 110 Sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be leveld and neatly dressed including providing barricating, danger lighting guarding as directed in: All kinds of soil. | 81 | Cu.m. | 102.56 ₹8,307.36 Lowest | 220.09 ₹17,827.29 | 200 ₹16,200 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 33 | Cu.m. | 800.41 ₹26,413.53 Lowest | 1,840.01 ₹60,720.33 | 1,500 ₹49,500 |
| 3.00 | Providing at site 1.8m long RCC standard posts with wooden plugs or 6mm bar nibs. | 846 | Each | 650 ₹5,49,900 | 630 ₹5,32,980 Lowest | 640 ₹5,41,440 |
| 4.00 | Supplying at site 2.00 m long RCC standard struts. | 168 | Each | 400 ₹67,200 Lowest | 540 ₹90,720 | 500 ₹84,000 |
| 5.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:
All works upto plinth level. | 49 | Cu.m. | 6,500.02 ₹3,18,500.98 | 6,500 ₹3,18,500 | 6,000 ₹2,94,000 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of formwork for:
Foundations, footings, bases for columns and mass concrete. | 730 | Sq.m. | 79.99 ₹58,392.7 Lowest | 380 ₹2,77,400 | 300 ₹2,19,000 |
| 7.00 | 1.2 m. height fencing with 1.20mt. R.C.C. posts of standard 30 design placed at 3 m. apart embedded in cement concrete blocks, corner, end & every 10th post to be strutted with 9 horizontal lines & two diagonals of barbed wire 9.33 kg/100 m. minimum between `two posts, fitted and fixed with G.I. staples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately).
M.S. barbed wire. | 2,540 | R.mt. | 184 ₹4,67,360 | 181 ₹4,59,740 Lowest | 195 ₹4,95,300 |
Tender Value
₹22.1 L
EMD Value
₹44,134
Closing Date
8 Jan 2025, 11:00 amClosed
Executive Engineer, W.D.VIII, W.R.D.
Karaswada, Bardez, Goa.
Fifth Revised Estimate of Tillari Irrigation Project (Land Acquisition). Providing barbed wire fencing 1.20m height on LHS and RHS of LBMC of TIP from ch.34.430 km to 35.700 km at Guirim of Bardez Taluka.
2025_WRD_19181_1
WRD/WDVIII/A/F6/24-25/TN-20(2)
Open Tender
Civil Works
Item Rate
60 days
Guirim Village, Mapusa, Bardez
As per Tender Notice, Form 6, Eligibility Criteria etc.
3 documents required · 3 mandatory
₹3,000
₹44,134
28 Oct 2025
2 Jan 2025
9 Jan 2025
2 Jan 2025
8 Jan 2025
2 Jan 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .