Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹12.7 L+₹33,738.26 (2.74%)Accepted-Finance | 2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | HI-STAR BUILDERS L1 | KAVITHA A L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Compound wall for Ayilapettai High school in Kodiyalam Panchayat in Andhanallur Block.Earth work excavation and depositing on bank with in initial lead and initial lift in hard stiff clay and hard gravelly soil as per SS 20B for narrow foundations.etc | 54.28 | Cum | 242 ₹13,135.76 Lowest | 258 ₹14,004.24 |
| 2.00 | .Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 3.93 | Cum | 1,814 ₹7,129.02 Lowest | 1,849 ₹7,266.57 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 7.26 | Cum | 5,485 ₹39,821.1 Lowest | 5,519 ₹40,067.94 |
| 4.00 | Towards centering charges inclusive of all materials and labour charges etc., complete as per standard specification.below sill level | 96.05 | sqm | 517 ₹49,657.85 Lowest | 530 ₹50,906.5 |
| 5.00 | Towards centering charges inclusive of all materials and labour charges etc., complete as per standard specification.above sill level | 72.27 | sqm | 1,035 ₹74,799.45 Lowest | 1,060 ₹76,606.2 |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges etc | 1.25 | mt | 89,900 ₹1,12,375 Lowest | 89,940 ₹1,12,425 |
| 7.00 | RCC 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 20.68 | Cum | 9,274 ₹1,91,786.32 Lowest | 9,299 ₹1,92,303.32 |
| 8.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete. | 49.63 | Cum | 6,064 ₹3,00,956.32 Lowest | 6,099 ₹3,02,693.37 |
| 9.00 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete ., | 488.04 | sqm | 270 ₹1,31,770.8 Lowest | 300 ₹1,46,412 |
| 10.00 | Colour wahsing with Exterior emulsion paint Two coats including cost and conveyance to site and all labour charges etc. complete. | 485.34 | sqm | 249 ₹1,20,849.66 Lowest | 260 ₹1,26,188.4 |
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
11 Aug 2025, 3:00 pmClosed
BDOAndhanallur
BDO Andhanallur
Construction of Compound wall for Ayilapettai High school in Kodiyalam Panchayat in Andhanallur Block in Tiruchirappalli District
2025_RDTN_589107_1
A2/1350/2025
Open Tender
Civil Works - Others
Item Rate
90 days
Andhanallur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,500
Yes
21 Aug 2025
6 Aug 2025
11 Aug 2025
6 Aug 2025
11 Aug 2025
6 Aug 2025
Amount
Construction of Compound wall for Ayilapettai High school in Kodiyalam Panchayat in Andhanallur Block.Earth work excavation and depositing on bank with in initial lead and initial lift in hard stiff clay and hard gravelly soil as per SS 20B for narrow foundations.etc
.Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Towards centering charges inclusive of all materials and labour charges etc., complete as per standard specification.below sill level
Towards centering charges inclusive of all materials and labour charges etc., complete as per standard specification.above sill level
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges etc
RCC 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete .,
Colour wahsing with Exterior emulsion paint Two coats including cost and conveyance to site and all labour charges etc. complete.
Provision for Name board charges etc
Provision for Photo charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KAVITHA A (BID ID -1423635)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .