Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹85.0 L+₹0.50 (<0.01%)Accepted-AOC BAMPARBATIA P O P S TEZPUR DIST SONITPUR ASSAM | ₹85.0 L+₹0.50 (<0.01%) | L2 | Accepted-AOC Awarded |
| 2 | L1₹85.0 LRejected-Finance | ₹85.0 L | L1 | Rejected-Finance Refer Financial Minutes |
| 3 | Rejected-Technical HOUSE NO 15 ANKUR PATH PUB GANESHPARA P O P S FATASHIL GUWAHATI 25 KAMRUP M ASSAM | DIMA HASAO | ASSAM | 788107 | - | - | Rejected-Technical Not Admitted. Refer Technical minutes |
| 4 | Rejected-Technical KANAI BORA CHUBURI BESSERIA P O BESSERIA DISTRICT SUNITPUR ASSAM PIN 784150 | SONITPUR | ASSAM | 784150 | - | - | Rejected-Technical Not Admitted. Refer Technical minutes |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Admitted. Refer Technical minutes |
Tender Value
₹89.5 L
EMD Value
₹1.8 L
Closing Date
19 Jan 2024, 5:00 pmClosed
Director
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
ANTI EROSION MEASURES OF KHOLAKATI KACHARIGAON VILLAGE AT DIPOTA RIVER UNDER RIDF-XXIX FOR THE YEAR 2023-24
2023_SCD_35042_6
Tender/NIT/Pt/2023-24/8126
Open Tender
Civil Works
Item Rate
90 days
Sonitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,800
₹1.8 L
Yes
8 Aug 2024
29 Dec 2023
20 Jan 2024
30 Dec 2023
19 Jan 2024
6 Jan 2024
Amount
Part A (Earthwork Excavation)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means (Depth upto 3m) (I) Without dewatering
Part B (Boulder Spur)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means (Depth upto 3m) (I) Without dewatering
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means (Depth upto 3m) (II) With dewatering
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications
Cost of Haulage excluding loading and unloading of Man Size boulder
Part C (Boulder Revetment and Pitching)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means (Depth upto 3m) (I) Without dewatering
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means (Depth upto 3m) (II) With dewatering
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications
Cost of Haulage excluding loading and unloading of Man Size boulder
Providing & laying RCC sign board with engraved lettering
Utpal Sarmah
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .