| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC FLOOR NO GROUND FLOOR BUILDING NO FLAT NO EP X130A CHEMBANKOLLY P O MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | ₹10.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 L+₹10,652.19 (1.01%)Rejected-AOC | ₹10.6 L+₹10,652.19 (1.01%) | L2 | Rejected-AOC L2 |
Tender Value
₹10.7 L
EMD Value
₹26,700
Closing Date
17 Jun 2026, 4:00 pmClosed
Executive Engineer,PMU Nilabur
Executive Engineer ,PMU Nilambur,near Kodathipadi ,Minivydyuthi Bhavanam Nilambur-679329
11 KV LINE CONSTRUCTION USING ABC 120 SQ.MMUNDER MALAPPURAM PACKAGES-No .2 under ES Karuvarakundu.
2026_KSEB_852806_1
PMU/NBR/E-TENDER NO 14/26-27/DTD 30.05.2026
Open Tender
Electrical Works
Percentage
120 days
Karuvarakundu
Please refer tender documents
8 documents required · 8 mandatory
₹5,900
₹26,700
24 Jul 2026
8 Jun 2026
20 Jun 2026
8 Jun 2026
17 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Fitting and providing one HT Stay for 11kV pole, including digging and
back filling pit in ordinary soil. | 42 | No | 1,373.73 | ₹57,696.66 |
| 1.02 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole
including digging and back filling pits in ordinary soil, drawing sufficient
length of GI earth leads to the ground for earthing (excluding provision of
earthing).. | 1 | No | 4,805.95 | ₹4,805.95 |
| 1.03 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT
pole including dismantling existing cross arm and insulators, refitting the
same on the new pole, binding etc. complete. | 60 | No | 1,778.32 | ₹1,06,699.2 |
| 1.04 | Disconnecting and lowering down the single phase WP service
connection with guy wire from the OH line and reconnecting the same
after completing the line work. | 32 | No | 96.18 | ₹3,077.76 |
| 1.05 | Disconnecting and lowering down the three phase WP service connection
with guy wire from the OH line and reconnecting the same after
completing the line work. | 9 | No | 149.5 | ₹1,345.5 |
| 1.06 | Providing WP support with PSC pole including digging & back filling pit
in ordinary soil. excluding transportation of poles. | 3 | No | 1,943.5 | ₹5,830.5 |
| - | Dismantling (without damage) one LT PSC/RCC pole after disconnecting
stays, strut etc. attached thereon and stacking the same. | 47 | No | 1,923.64 | ₹90,411.08 |
| - | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,
strut etc. attached thereon and stacking the same. | 10 | No | 1,008.86 | ₹10,088.6 |
| - | Key no 113 fitting of Atype pole with V cros arm, Pin Insulator and F
clamp is Rs 4143 /- . While stringing AB cable in PSC pole these items
like fitting V cros arm, Pin Insulator and F clamp can be eliminated. The
rate of Key no 169 fitting V cross arm is 482, Key no 179 fitting pin
insulator is 450( 3 nos), Key no 180 fitting F clamp is 150. | 12 | Each | 3,061 | ₹36,732 |
| - | Fitting and erecting 9M PSC pole with out V cross arm,pin insulator and f
clamp for AB Cable stringing | 78 | Each | 2,193 | ₹1,71,054 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1444605.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
doc14.pdf
Tender Documents • 0.41 MB
BOQ_1444605.xls
BOQ • 0.35 MB
Corregendum14.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .