Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 CrAccepted-AOC | ₹7.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.8 Cr+₹40.6 L (5.52%)Rejected-Finance 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹7.8 Cr+₹40.6 L (5.52%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Jai Shree Balaji Constn Co. L1 | Umesh Kumar Contractor L2 |
|---|---|---|---|---|---|
| 1.00Sub Head No.2 N.S.Items | |||||
| 1.01 | Design construction, erection, testing and commissioning of 11.25 MLD MPS and following components including peak factor 2.50 RCC inlet chamber, Screen Chamber, rectangular collecting tank suitable for 4.50 MLD (For 30 years) average flow with peak factor of 2,50 landscaping of the campus providing and installing of 01 nos. Pumping Sets of capacity 8000 LPM x 15mtr. head (2.5 DWF), 02 no. pumping sets of capacity 3200 LPM x 15mtr. head (DWF) and 02 nos. pumping sets of capacity 1600 LPM x 15 mtr. head (0.5 DWF) as per CPHEEO manual with suitable gantry and LT panel equipped with all safety devices, automatic capacitor and submersible cable from LT panel to pump sets K9DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked DI fittings Sluice valve, non return valves as per requirements and for bye pass arrangements complete in all respect. 03 Nos.CI Gear Operated Sluice Gate with SS Spindle (SS410) and seats (SS304) , 4 screens (2 manual and 2 mechanical) as per design. i)The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in this scope of work. ii) All the infra structure excluding Pump chamber of size 9.15x4.57m except construction of and work covered under schedule and pathways / roads required to be executed at site to make the MPS functional is included in the scope of work for lump sump job. iii) All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panel sat MPS site through broad band internet facility. iv) The size and quantities of all the above components will be as per approved structural / Hydraulic /Mechanical /Electrical design to be approved by Departmental before actual execution of work. | 1 | Complete Job | 1,15,00,000 ₹1,15,00,000 | 48,00,000 ₹48,00,000 Lowest |
Tender Value
₹7.9 Cr
EMD Value
₹15.9 L
Closing Date
13 Aug 2025, 3:00 pmClosed
DINESH GABA
Yamuna Nagar PHED No.2
Radaur Town, Estimate for balance sewer line in newly approved colony of Radaur Town, District Yamuna Nagar. Laying of 200mm, 250mm and 300mm SW sewer line, 350mm RCC NP 3 sewer line, Construction of manhole etc.
2025_HRY_460475_1
2025383A4040 B205 4273 987B 06371345AC6F548PUH
Open Tender
Civil Works
Works
740 days
Radaur
3 documents required · 3 mandatory
₹15,000
₹15.9 L
Yes
Yamuna Nagar
11 Nov 2025
23 Jul 2025
13 Aug 2025
23 Jul 2025
13 Aug 2025
23 Jul 2025
5 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.83 MB
BOQ.xls
BOQ • 0.26 MB
Tenderdocument_2.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .