Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -54.56% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹57,383.50 (51.4%)Admitted-Fee/PreQual/Technical/Finance AT TELIYABANDH KATRAS AREA DHANBAD JH 828114 | DHANBAD | DHANBAD | JHARKHAND | 828114 | -31.21% | ₹1.7 L+₹57,383.50 (51.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 L+₹57,899.58 (51.8%)Admitted-Fee/PreQual/Technical/Finance AT SIJUA MORE P O SIJUA DHANBAD JH 828121 | DHANBAD | DHANBAD | JHARKHAND | 828121 | -31.00% | ₹1.7 L+₹57,899.58 (51.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹3,100
Closing Date
21 Aug 2026, 5:00 pmClosed
Area Civil Engineer
Katras Area Office
Repairing and maintenance of Shahid Asthal and premises of stadium at Gaslitand under Katras Area
2026_BCCL_363267_1
GM/KA-IV/Civil/eNIT/2026-27/14
Open Tender
Civil Works - Others
Percentage
15 days
Katras Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,100
22 Aug 2026
7 Aug 2026
22 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
7 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | 214.15 | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | 1,292.2 | ₹1,290.91 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | - | cum | 5,120.95 | - |
| 4 | Fly ash brick work 1:6 cm. F/P | - | cum | 5,002.05 | - |
| 5 | Fly ash brick work 1:6 cm. S/S | - | cum | 5,483.5 | - |
| 6 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 1 | sqm | 222 | ₹221.78 |
| 7 | Cement concrete flooring 1:2:4 ( 1 cement :2 coarse sand : 4 graded stone aggregate ) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete 25mm thick with 20mm nominal size stone aggregate. | - | sqm | 323.59 | - |
| 8 | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats @ 2.20 kg/10 sqm) complete. | 0.8 | sqm | 46.4 | ₹37.07 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 0.8 | sqm | 68.3 | ₹54.64 |
| 10 | Colour washing | 0.6 | sqm | 20.05 | ₹12.03 |
stage.html
html • 0.02 MB
finance_376182.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_376182.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .