Tender Value
₹2.9 Cr
EMD Value
₹1 L
Closing Date
11 Aug 2023, 4:00 pmClosed
The Superintending Engineer
KWA, PH Circle, Muvattupuzha
JJM-ERATTAYAR AND KAMAKSHI PTS IN IDUKKI. S.L CWPM, Construction of reservoirs, steel tanks at Kurisumoottilpady, Heropady
2023_KWA_592175_1
Re-146/2023-24/SE/PHC/MVPA
Open Tender
Civil Works - Others
Item Rate
365 days
KWA, PH Circle, Muvattupuzha
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,270
₹1 L
29 Nov 2023
2 Aug 2023
14 Aug 2023
2 Aug 2023
11 Aug 2023
2 Aug 2023
Amount
Part I - Supply and Laying CWPM 200 mm DI Pipe from WTP to Heropady and CWPM 150 mm DI Pipe from Heropady to Adayalakkallu- Cost of materials
100.98.116:Supply of DI K9 Pipe Conforming to IS 8329/2000, 150mm Dia.
100.98.117:Supply of DI K9 Pipe Conforming to IS 8329/2000, 200mm Dia.
100.98.460:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 150mm.
100.98.461:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 200mm.
100.98.444:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Large Orifice Type S2, Size 50mm.
100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm.
100.98.469:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.0, Size 80mm.
Part II - Working charges
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
100.14.2:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 150mm diameter Ductile Iron Class K-9 Pipes.
100.14.3:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 200mm diameter Ductile Iron Class K-9 Pipes.
18.30.4:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:150 mm diameter pipe
18.30.5:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:200 mm diameter pipe
18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
18.67.1:Providing and laying S & S C.I. Standard specials suitable for mechanical jointing as per IS 13382:Upto 300 mm dia
18.70.2:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:150 mm dia pipes
18.70.3:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:200 mm dia pipes
OD107091/2022-2023:Labour for Cutting DI Pipe with steel saw 150 mm diameter DI Pipe
OD107078/2022-2023:Labour for Cutting DI Pipe with steel saw 200 mm diameter DI Pipe
100.35.2: Testing 150mm DI/CI pipeline with potable water to the required test pressure 150 mm dia Observed Data derived from item no.1018 of PHED DATA
100.35.3:Testing 200mm DI/CI pipeline with potable water to the required test pressure 200 mm dia Observed Data derived from item no.1020 of PHED DATA
100.32.3:Conveying and fixing C. I. Double Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 50mm Double Acting Air Valve.
100.32.2:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 40mm Single Acting Air Valve.
100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I.
100.31.1.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class I.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
100.37.6.1:In situ fabrication of M.S. pipes of size 150mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete.
100.37.6.2:Fabricating M.S. flanges of diameter 150mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.3:Cutting 150mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.4:Welding 150mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.6.5:Grinding cut and weld edges of 150mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.7.1:In situ fabrication of M.S. pipes of size 200mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete.
100.37.7.2:Fabricating M.S. flanges of diameter 200mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.7.3:Cutting 200mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.7.4:Welding 200mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.7.5:Grinding cut and weld edges of 200mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
OD111602/2022-2023:Supply and Installation of Surge Arrestor 200 mm as per direction
Part III - Construction of 2.6LL GLSR AND PUMP HOUSE at Heropady
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
OD76090/2022-2023:DOWEL BARS - Supplying and Providing MS dowel bars of size 16 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia and filling the gap with cement grout( 0.50kg/each) etc
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
13.71:Lettering with black Japan pint of approved brand and manufacture
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
100.41.34:Supplying and fixing Rectangular C.I. manhole cover 455mm x 610mm with frame (low duty) charges including all cost, labour charges etc., complete.
50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
21.1.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionAnodised aluminium (anodised transparent or dyed to required shade according to IS : 1868, Minimum anodic coating of grade AC 15)
21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron)
21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness
21.15.2:Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary necessary screws etc. complete.Powder coated minimum thickness 50 micron aluminium
9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding
Part - IV - Road restoration charges
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
5.8.a:Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder (VG 30) laid on the prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. Grading I - 19 mm nominal chipping size
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>
Construction of Steel Tanks in Nanguthotty,Vazhavara,Adayalakkallu and Kurishumoottil pady
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD78600/2022-2023:Supply of Sand including loading, unloading, transportation and other incidental charges as per the direction of departmental officers.1
OD78727/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 104250 L(1Nos.) thickness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body &amp; the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hotdip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 7.768m in diameter and 2.200m in height DESIGN LIFE: The tanks shall have a design life of 50 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 200mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purposedesigned and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to onepiece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel&39;,Cost for Poly ethylene infinity liner ,Geo synthetic Fibre with food grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components including charges of extra 1 no 200 mm MS HDG Nozzle type BS10E table and 200 mm MS HDG anti vortex type E table and Transportation charges.
OD78968/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 137420 L(1Nos.) thichness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavyduty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 7.768m in diameter and 2.9 m in height DESIGN LIFE: The tanks shall have a design life of 50 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 200mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multilayer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components and including charges of extra 1 no 200 mm MS HDG Nozzle type BS10E table and 200 mm MS HDG anti vortex type E table and Transportation charges.
OD78979/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 131941L(1Nos.) thichness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavyduty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 8.739m in diameter and 2.200m in height DESIGN LIFE: The tanks shall have a design life of 50 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 150mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multilayer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components including charges of extra 1 no150 mm MS HDG Nozzle type BS10E table and 150 mm MS HDG anti vortex type E table and Transportation charges.
OD78992/2022-2023:Supply,installation and commissioning of a pre-engineered, pre-fabricated, factory manufactured steel storage Water Tank having a capacity of 26062 L(1Nos.) thichness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavyduty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided with Hot-dip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness.Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 3.884m in diameter and 2.20m in height DESIGN LIFE: The tanks shall have a design life of 50 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 150mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose-designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to one- piece construction, fabricated from multilayer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel',Cost for Poly ethylene infinity liner ,Geo synthetic Fibre withfood grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components and Transportation charges
Bidder Name
George Martin Jose
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_877140.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .