Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC ALUKKA MOOKKANNOOR | ERNAKULAM | KERALA | 680667 | ₹11.8 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ELDO ALIAS L1 |
|---|---|---|---|---|
| 1.001. Ramp | ||||
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 15 | each | 307.38 ₹4,610.70 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 139.11 | cum | 214.03 ₹29,773.71 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 70.86 | cum | 3,491.47 ₹2.5 L |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 71.75 | cum | 525.83 ₹37,728.30 |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 12.25 | cum | 902.34 ₹11,053.67 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 18.38 | cum | 7,990.85 ₹1.5 L |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 4.63 | cum | 8,588.5 ₹39,807.70 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 14.7 | sqm | 335.31 ₹4,929.06 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 324.45 | kilogram | 98.3 ₹31,893.44 |
Tender Value
₹11.8 L
EMD Value
₹2,760
Closing Date
28 Feb 2025, 5:00 pmClosed
Sobini T.V
Assistant Executive Engineer, Angamaly Municipality
LAC-ADS-MLA ADS 2022-23 Ward 29 Vadakkan Vettiyadkulam side protection work and new ramp construction-MLA ADS 2022-23 Angamaly Municipality Vadakkan Vettiyadkulam side protection work and new ramp construction in Ward 29 -General Civil Work
2024_LSGD_657925_3
AEE/AMC/MLA/23-24/3
Open Tender
Civil Works - Others
120 days
O/O The Asst Ex Engineer, Angamaly Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹29,607
Yes
₹2,760
Yes
3 Mar 2026
20 Feb 2025
3 Mar 2025
20 Feb 2025
28 Feb 2025
20 Feb 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1189468.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid