| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance RALLING ROAD ROPAR PB 140001 | ROPAR | RUPNAGAR | PUNJAB | 140001 | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 Cr+₹1.8 L (0.35%)Admitted-Finance 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹5.1 Cr+₹1.8 L (0.35%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified by TBOO |
| Sl No | Description | Qty | Unit | GARG & GARG CO L2 | VINITA ENTREPRENEURS L1 |
|---|---|---|---|---|---|
| 1.00PART-I ( CONSTRUTION OF MCBC -02 NOS) | |||||
| 1.01 | Excavation in trenches not exceeding 1.2m width and 1.5m depth in soil/soil mixed with boulders, including bottom and sides getting out and disposing all excavated material lead upto 3m and lift upto 1.5m | 2,910.68 | Cum | 558 ₹16,24,159.44 | 550 ₹16,00,874 Lowest |
| 1.02 | Plain Cement concrete (1 cement: 4 sand: 8 aggregate of size 4.0 cm graded downwards) in foundation or elsewhere (Excluding the cost of shuttering/ Centering). | 126.52 | Cum | 12,400 ₹15,68,848 | 12,000 ₹15,18,240 Lowest |
| 1.03 | Plain Cement concrete (1 cement: 3 coarse sand: 4 stone aggregate size 4.0 cm graded downwards) in foundation or elsewhere. Excluding the cost of shuttering/ Centering | 95.04 | Cum | 13,100 ₹12,45,024 | 12,900 ₹12,26,016 Lowest |
| 1.04 | Plain Cement concrete (1 cement: 2 coarse sand: 4 stone aggregate size 4.0cm graded downwards) in foundation or elsewhere. Excluding the cost of shuttering/ Centering | 95.04 | Cum | 13,200 ₹12,54,528 | 12,900 ₹12,26,016 Lowest |
| 1.05 | Random rubble walling in cement mortar (1:4) brought to course 45 cm to 60 cm height ( material & labour) | 90.28 | Cum | 5,300 ₹4,78,484 | 5,000 ₹4,51,400 Lowest |
| 1.06 | Providing and laying rubble including hand packing and filling interstices in aprons, rivetment pitching to any slope or profile to required thickness ( material & labour) | 189.78 | Cum | 3,400 ₹6,45,252 Lowest | 3,500 ₹6,64,230 |
| 1.07 | Random rubble walling in cement mortar (1:3) brought to course 45 cm to 60 cm ( material & labour) | 33.26 | Cum | 5,100 ₹1,69,626 Lowest | 5,200 ₹1,72,952 |
| 1.08 | Reinforced Cement concrete M-35 nearly corresponding to nominal mix, (excluding the cost of reinforcement & centering/shuttering) | 735 | Cum | 16,700 ₹1,22,74,500 | 16,500 ₹1,21,27,500 Lowest |
| 1.09 | Centering/Shuttering including strutting, propping and removal of formwork | 156.31 | 10 Sqm | 9,700 ₹15,16,207 Lowest | 9,720 ₹15,19,333.2 |
Tender Value
₹4.4 Cr
EMD Value
₹5.1 L
Closing Date
30 Mar 2023, 4:00 pmClosed
CHIEF ENGINEER PROJECT DEEPAK
HQ CE(P) DEEPAK, CHAKKAR BARRIER, HARI NAGAR , SHIMLA
CONSTRUCTION OF CONCRETE PAVEMENT WITH ILC BLOCKS AND MCBC TWO 02 NOS FROM KM 165PT410 TO KM 165 PT 810 ON MS ROAD UNDER 70 RCC38 BRTF OF PROJECT DEEPAK IN HIMACHAL PRADESH STATE
2023_BRO_584220_1
CE PROJECT DPK-26 OF 2022-23
Open Tender
Civil Works
Works
730 days
MS ROAD
AS PER TENDER DOCUMENT
9 documents required · 9 mandatory
₹0
₹5.1 L
Yes
SHIMLA
18 May 2023
3 Mar 2023
31 Mar 2023
3 Mar 2023
30 Mar 2023
14 Mar 2023
3 Mar 2023 - 13 Mar 2023
9 Mar 2023
Amount
PART-I ( CONSTRUTION OF MCBC -02 NOS)
Excavation in trenches not exceeding 1.2m width and 1.5m depth in soil/soil mixed with boulders, including bottom and sides getting out and disposing all excavated material lead upto 3m and lift upto 1.5m
Plain Cement concrete (1 cement: 4 sand: 8 aggregate of size 4.0 cm graded downwards) in foundation or elsewhere (Excluding the cost of shuttering/ Centering).
Plain Cement concrete (1 cement: 3 coarse sand: 4 stone aggregate size 4.0 cm graded downwards) in foundation or elsewhere. Excluding the cost of shuttering/ Centering
Plain Cement concrete (1 cement: 2 coarse sand: 4 stone aggregate size 4.0cm graded downwards) in foundation or elsewhere. Excluding the cost of shuttering/ Centering
Random rubble walling in cement mortar (1:4) brought to course 45 cm to 60 cm height ( material & labour)
Providing and laying rubble including hand packing and filling interstices in aprons, rivetment pitching to any slope or profile to required thickness ( material & labour)
Random rubble walling in cement mortar (1:3) brought to course 45 cm to 60 cm ( material & labour)
Reinforced Cement concrete M-35 nearly corresponding to nominal mix, (excluding the cost of reinforcement & centering/shuttering)
Centering/Shuttering including strutting, propping and removal of formwork
Laying reinforcement including cutting bending, binding, providing hooks overlaps etc ( labour only) bars upto 12 mm (labour only).
Laying reinforcement including cutting bending, binding, providing hooks overlaps etc ( labour only) bars above 12 mm (labour only).
Painting (02 Coats) coat with fie resisting approved paint to new or previously untreated surface of wood or iron posts including preparation of surface and application or priming coat
Providing/laying of weep holes using PVC pipe 4" Dia
Cost of steel
Providing & fixing of Drainage Spout
Part-II (Construction of Concrete pavement with ILC Blocks) Surfacing Work
Preparation of sub-grade in SMB by excavating upto 20 cm depth, dressing to required camber or super elevation removal of local humps for depressions and consolidating with a lead of 30 mtr
GSB 15 cm thick (compacted) with stone aggregate conforming to grading - 5 ( Total area for two layers)
Providing crushed stone aggregate ( 7.5 cm) thick depositing on a spreading surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 405 of MORT&H specification to form a layer of sub base/base ( Total area for two layers)
Providing sand blanketing to a depth of 30 mm spraying water, compacting with power roller all complete
Providing & Laying of ILC Blocks M-50 Grade Volume of one PCC Block 0.225m ( L) X 0.112 m (B) X 0.120 m (D) = 0.003024 Cum Qty of PCC Block (M-50) ( Area X 0.120)= 30.274 Cum No. of Block (M-50) required ( Qty/0.003024)= 10011 Nos
Permanent Works
Plain Cement concrete (1 cement: 4 sand: 8 stone aggregate: of size 4.0 cm graded downwards) in foundation or elsewhere (Excluding the cost of shuttering/ Centering)
Plain Cement concrete (1 cement: 2 coarse sand: 4 stone aggregate size 4.0 cm graded downwards) in foundation or elsewhere. Excluding the cost of shuttering/ Centering
Centering/Shuttering ( Steel) including strutting, propping and removal of formwork( considering 10 times to be used)
GARG & GARG CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.30 MB
TBID.pdf
Tender Documents • 0.78 MB
QBID.pdf
Tender Documents • 0.89 MB
BOQ_654510.xls
BOQ • 0.24 MB
OTHERDETAILS.pdf
Tender Documents • 0.18 MB
DRAWINGSM.pdf
Tender Documents • 6.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .