Tender Value
₹20.9 L
EMD Value
₹21,000
Closing Date
8 Jun 2026, 4:01 pmClosed
EXECUTIVE ENGINEER, ELECTRICAL (R&B) DIVISION, GODHARA
SITC of Grid Tied Solar Power Plant on Taluka Seva Sadan Singvad at Ta.- Singvad Dist.- Dahod.
307977
E Tender TC-01-02 of 2026-27
Open
Electrical
Works
Panchmahal
11 documents required · 11 mandatory
₹900
EXECUTIVE ENGINEER, ELECTRICAL (R&B) DIVISION, GODHRA
₹21,000
22 May 2026
22 May 2026
22 May 2026
8 Jun 2026
22 May 2026
Name of Work:- SITC of Grid Tied Solar Power Plant on Taluka Seva Sadan Singvad at Ta.- Singvad Dist.-
Qty. Description. Per. Amount.
No. In Figure In Words
50 Kw 1 Supply, Installation, Testing & Commissioning of following size of Grid 41792.79 Rupees Forty Per
Tied Solar Power Plant with One Thousand Kw
Solar Panels (ALMM approved): Frame Material : Anodized Aluminum Seven hundred
alloy Frame With Twin Wall Profile, Front Cover : High Transmission Low- Ninety Two
Iron Tempered Glass (AR Coated), High efficency and positive power Paise Seventy
tolerance Pmax: 0/+5, Module Efficiency should be approx. 19.5%-22%, Nine Only
Normal operating temperature 45'C, Junction Box with Waterproof IP67
& MC4 Compatible and Enclosed with Bypass diodes, 100%
Electroluminescence test to ensure error free Modules, Thep. temp. co-
efficient of the PV module shall equal or better than -0.45%/degree C.
Solar PV modules of minimum fill factor 75% to be used. Unit
Production:- More than 4.5 Unit /kw /day (Actual)(1Year Avg) With
year Product warranty and 25 year Linear Power Warranty includes all
mechanical and electrical parameters of the Solar panel. Modules must
be complied to the DCR(Domestic content requirements). The Ration of
AC to DC is 5:6 for the Installation capacity which are given in AC KW.
Solar Inverter: MPPT Range: MPPT Range: 80-1000 V , Max efficiency:
97.5% - 98.9%, O/p Frequency: 50/60Hz, Operating Altitude (m) ≤4000,
O/p Power Factor: ~1, O/P THDi: <3%, Operating Tempreture Range: -
25~60°C, Integrated protection of Inverter are Anti-islanding Protection,
Ground fault protection, PV array string fault Protection Integrated,
Input Reverse Polarity Protection Integrated, Insulation Resistor Rupees Only
Detection Integrated, Residual Current Monitoring Unit Integrated,
Output Over Current Protection Integrated, Output Short Circuit
Protection Integrated, Output Over Voltage Protection Integrated,
Protection Degree: IP65, User Interface LCD & APP, Datalogger &
Communication: GPRS / Wi-Fi, Module Mounting Structure: The
mounting (Rectangular pipe / square pipe / circular pipe) with requisite
cross bars, nuts and bolts, etc. shall be Hot deep galvanized with
minimum 80micron coating. The Rectangular / square /circular hollow
pipe section used for the structure should have a minimum thickness of
2.0 mm. other than above, the material thickness should be minimum
2.5 mm. A certificate of a structural engineer certifying the strength and
stability of the mounting structure to withstand the weight and wind
speed of 150 km/hour throughout the life span of 25 years of the
system, shall be submitted by the vendors.
DTP of SITC of Grid Tied Solar Power Plant on Taluka Seva Sadan Singvad. Page 1 of
Hot Dipped Galvanized steel coils. suitable arrangement for base plate Rupees Only
for foundation , solar panel mounting, the structure should be suitable
for carry the load of solar panel,wiring, sprinkler system etc. with
necessary foundation work/wall mount, j bolt, anchor fastner etc. the
nut bolt used for installtion of stucture should be (SS 304) quality.
The ground clearance of the bottom most edge of solar panel shall not
be less than 300 mm to 1200 mm or as per site’s technical/feasibility
a. Column –The minimum section (thickness) should be 60MM*40MM
b. Rafter - The minimum section (thickness) should be 60MM*40MM
c. Purlin - The minimum section (thickness) should be 40MM * 40MM
Balane of System with necessary Swichgears (Suitabel size and
protection of ACDB & DCDB), inter connecting wiring, earthing system as
per the CEIG drawing approval, lightining arrester system as per the CEIG
drawing approval, all liasoning work with various gov. dipartment like
state nodal agency,DISCOM & CEIG is included in agency scope
(Excluding All charges namely GEDA Application fees, Solar connectivity Rupees Only
Charges, Meter connectivity Charges, Meter testing Charges and system
stability/strenthning charges.)
(D) Grid Tied Solar Power System: 26 - 50 kW (3 - phase) Rupees Only
(Signature of Contractor)
Executive Engineer Deputy Executive Engineer
Godhra Electrical Division Dahod Electrical Sub Division
R & B Deptt. Godhra R & B Deptt. Dahod
DTP of SITC of Grid Tied Solar Power Plant on Taluka Seva Sadan Singvad. Page 2 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01.Notice Inviting Online tender-Solar Work.pdf
02.SBD SOLAR WORK Singvad Dist Dahod.pdf
03.SCHEDULE - B.pdf
04.General Terms and Conditions for Tender.pdf
05.SOLAR CONDITION.pdf
06. ELIGIBILITY CRITERIA SOALR WORK.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .