Tender Value
₹10.3 L
EMD Value
₹25,676
Closing Date
29 Jul 2026, 5:00 pm3d left
Managing Director, KINFRA
Managing Director, KINFRA
Construction of Retaining Wall near water treatment plant, and painting of compound wall, Hi-tech Park, Kalamassery
2026_KINFR_861200_1
KIN/HIT/2026-27/23
Open Tender
Civil Works - Others
Item Rate
90 days
Hi-tech Park, Kalamassery
As per NIT
2 documents required · 2 mandatory
₹2,500
₹25,676
17 Jul 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
29 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.03 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete. | - | sqm | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and strutssurface. | - | sqm | - | - |
| 1.05 | Centering and shuttering including strutting, etc. and removal of form for Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.06 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire | 1 | Kg | - | - |
| 1.07 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.08 | Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | sqm | - | - |
| 1.09 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more | - | Kg | - | - |
| 1.1 | DRY RUBBLE MASONRY_Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1456426.xls
BOQ • 0.26 MB
Corrigendum.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].