| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC | ₹5.9 Cr Quoted ₹6.2 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹6.2 Cr+₹1.1 L (0.18%)Rejected-Finance | ₹6.2 Cr+₹1.1 L (0.18%) | L2 | Rejected-Finance Being L2 |
Tender Value
₹6.0 Cr
EMD Value
₹11.9 L
Closing Date
16 Jan 2023, 10:00 amClosed
Er. K.K. Sharma
Superintending Engineer 6th Circle HP.PWD Kullu
Up gradation of Fojal Neri Kathi Kukri road Km 0/0 to 6/400 in district Kullu HP including 5 year routine maintenance under PMGSY-III Batch-I 2022-23
2023_CEHP_122523_1
PW-SEVI/PMGSY-III-9768-9818dt 5/1/23
National Competitive Bid
Civil Works - Roads
Item Rate
365 days
Manali
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
₹11.9 L
Yes
21 Feb 2023
7 Jan 2023
16 Jan 2023
7 Jan 2023
16 Jan 2023
7 Jan 2023
Amount
Cutting in earth work soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work (both in soft and hard rock ) with chiselling/wedging out of rock( where blasting is prohibited) and their intermediate classification of soil including, dewatering wherever required setting out to the required lines grades, side slopes and levels as shown on the drawings and as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 sorting out useful/un useful materials and stacking the same in all leads and lift and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excavated earth in acquired width of roads or on approved dumping sites through all modes of transportation including head load,animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means and labour (if any required) Recovery for useful stone of 2329.58 Cum @ 300/- per cum amounting to Rs.698874/- only shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respects.
Preparation of sub grade by dressing to camber (earth work for the cutting involved for sub grade to be paid for separately) depending upon the clasification of soil complete as per HPPWD specification including carriage of material with in all leads, lifts and other incidentas, as per the Engineer-In -Charge.
Consolidation of sub grade with road roller including making good the undulation etc with earth or quarry soil etc. and re- rolling the sub grade completed as per HPPWD specification including carriage of material with in all leads and lifts and other incidentas, as per the Engineer-In -Charge.
Preparing and applying of water soluble organo silance nanotechnology (or bitumen emulsion application IRC accredited) with cationic bitumen CRSI and water (< 1000 ppm TDS) in ratios of 1 kg organo silance : 100 kg cationic bitumen emulsion CRSI : 200 ltr ( Two hundred litre). water. Mixing & Spraying : Take 1.4 kg or organo silane nanotechnology and add in 200 ltr. water while filling water in tanker / drum and then add 100 kg cationic bitumen under circulation. Mix the solution completely. Spray the solution @ 0.3-0.4 ltr. per sqm on compacted stone base. Rate including all materials labour hire charges of machineries etc. complete as per MORD speciication clouse 503 including carriage of material with in all leads and lifts and other incidentas, as per the direction of Engineer - in - charge.
Preparing and applying of water soluble organo silane Nano technology (or bitumen emulsion application, IRC accredited) with cationic bitumen emulsion CSSI and water (< 1000 ppm TDS) in the ratio of 1 kg organo silane nanotechnology : 100 kg cationic bitumen emulsion CSSI : 200 ltr( Two hundred litre). water mixing & Spraying : Take 1 kg of organo silane nanotechnology and add in 200 ltr. water while filling water in tanker / drum and then add 100 kg cationic bitumen under circulation. Mix the solution completely. Spray the solution @ 1 kg per sqm on compacted stone base. Rate including all material labour hire charges of machineries etc. complete as per MORD speciication clouse 503 including carriage of material with in all leads and lifts and other incidentas, as per the Engineer-In -Charge.& direction of Engineer - in - charge.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement as per Technical Specification Clause 303 including carriage of material with in all leads and lifts and other incidentas, as per direction of the Engineer-In -Charge.
Earth work in excavation for structures ie. in foundation & tranches etc as per drawing and technical specification clause 305 in all kinds of soil such as pick. jumper, blasting work or chiselling any other intermediate classification of soil in dry or saturated condition in all leads & lifts including timbering or tranches, shoring, bracing and strutting, dewatering, pumping or bailing out of water caused by rains, streams, sub soil water, canal or river seepage etc as may be necessary stacking the excavated serviceable and unserviceable material separately as directed by the Engineer in Charge and then returning the stacking soil in fifteen centimeter layers when required into plinth and sides of foundation etc. consolidation of each deposited layer by ramming, watering and then. disposing of all surplus unserviceable material as per the direction of the Engineer in Charge with-in all leads and lifts, disposed material to be lavelled and neatly dressed complete including carriage of materials within all leads and lifts and other incidentals. The rate including octroi, royalty. Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm ( One hundred millimetre)dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1206.6 including carriage of materials within all leads and lifts and other incidentals. The rate including octroi, royalty. Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying reinforced cement concrete pipe NP3 for culverts on 1st class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work and back filling and concrete work in head wall and parapets as per drawing and Technical Specification Clause 1101 complete including carriage of material with in all leads, lifts and other incidentals as per the direction of Engineer-in-Charge.
Construction of hill side V-Shape 0.45 x 0.25 metre laying 10 Cm thick M- 10 grade drain in accordance with the requirement of specification true to line and grade . Dimension and other particular as per drawing and technical specification clause 1606.1 including carriage of materials within all leads and lifts and other incidentals. The rate including octroi, royalty. Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and fixing 5 Km (Fifth Kilometre) Stone (precast) with reinforced cement concrete M15 grade standard design as per IRC 8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 complete including carriage of material with in all leads, lifts and other incidentals as per the direction of Engineer-in-Charge.
Providing and fixing Ordinary Kilometre Stone (Precast) with reinforced cement concrete MIS grade design as per IRC. 8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 complete including carriage of material with in all leads. lifts and other incidentals as per the direction of Engineer in Charge.
Providing and fixing 200 m (Twenty hundred metre) stone (precast) with reinforced cement concrete M15 grade design as per IRC 26 foong in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 complete including carriage of material with in all leads, lifts and other incidentals as per the direction of Engineer-in-Charge.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes . Thermo plastic road marking as per MORTH specification clause 803 including carriage of material with in all leads, lifts and other incidentals as per the direction of Engineer-in-Charge
Back filling with granular material behind abutments, wing walls, return walls and retaining walls as per drawing and techanical specification clause 1206.3, and 1604.7 complete including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. below WBM layer(Using gravel mix soil )including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 below C.C. pavement layer (Using gravel mix soil )including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge
Providing and laying boulder apron laid in wire crate with 4 mm dia wire confirming to IS 280 and 4826 in 100x100 mm mesh (Woven diagonally) including 10% extra for laps and joints laid with stone boulder weighing not less than 25 Kg each as per drawing and technical specification clause1301 complete including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge
Providing ,laying, spreading and compacting stone aggregate of specific size to water bond macadam specification including spreading in uniform thickness hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstices of course aggregate watering and compacting to the required density Grading –II as per technical specification clause 405 by manual mean complete including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge
Providing laying spreading and compacting stone aggregate of specific size to water bond macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstices of course aggregate watering and compacting to the required density Grading –III as per techanical specification clause 405 By manual mean complete including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Construction of P.C.C. Parapets with cement concrete 1:4:8 (1 cement:4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete and form work as per drawing techanical specification section 800 and 1200 including carriage of materials within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Construction of dry stone masonry for retaining walls, breast walls, revetment walls and parapets etc. for sub structure and super structure complete as per drawing and technical specification clause 704.6 and 1604 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 complete including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying concrete for plain / reinforcement concrete In open foundation as per drawing and technical specification section 800 and 1200 and 1203 PCC nominal mix 1:6:12 (one cement : six sand: twelve graded crushed stone aggregate 40mm (forty millimeter) nominal size) including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying concrete for plain / reinforcement concrete In open foundation as per drawing and technical specification section 800 and 1200 and PCC nominal mix 1:3:6 (one cement : three sand: six graded crushed stone aggregate 40mm (forty millimeter) nominal size) including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and fixing 2.00 kilometre sign board as per specification including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying concrete for plain / reinforcement concrete In open foundation as per drawing and technical specification section 800 & 1200 PCC nominal mix 1:4:8 (one cement : four sand: eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Stone masonry in cement mortar for sub structure complete as per drawing and technical specification clause 702,704,1202 and 1206 in Cement mortar 1:6 (1 Cement : 6 sand) Random Rubble masonry.including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Stone masonry in cement mortar for sub structure complete as per drawing and technical specification clause 702,704,1202 and 1206 in Cement mortar 1:5 (1 Cement : 5 sand) .including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701., fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying bitumenous macadum with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed stone aggregate of specified grading premixed with bitumenous binder transported to site, laid over as previously prepared surface with paver finisher to the required grade level and alignment rolling with smooth wheeled vibratory and tendem roller to achive the desired compaction as per drawing and techanical specification clause 504 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Construction of un-reinforced,dowl jointed at expention and construction joint only plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1500 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying bitumenous concrete 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per Hr using crushed stone aggregate of specified grading, premixed with bitumenous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site laying with a hydraulic paver finisher with senser control to the required grade level and alignment rolling with smooth wheeled vibratory and tendem roller to achieve the desired compaction as per MORTH specification clause 502 complete in all respect as per the direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidental .
Providing and fixing of typical PMGSY informatory sign board with logo as per MORD specification and drawing thre MS plate of 1.6 mm top and middle plate duly welded with MS flat iron 25x5 mm size on back on edge. The lower plate will be welded with MS angle iron frame of 25x25x5mm of 12 SWG steel tube post duly embedded in cement concrete M-15 grade blocks of 450x450x600 mm , 600 mm below ground level . The top most diamond plate will be welded to middle plate by 47x47 mm of 12 SWG steel plate tube . All MS will be stove enameled on both side. Lettering and painting arrows border etc. will be painted with ready mixed synthetic quality in required shade and colour. All section of framed posts and steel tube will be painted with primer and two coats epoxy paint as per drawing and technical specification saction 1700 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing And fixing of citizen information board as per specification and drawing two M.S. plate 1.6 mm thick duly welded with M.S. angle iron frame of 25 mm x 25 mm x 5 mm on edges , supported with 2 nos vertical post and 2 nos horizontal post mase of 75 mm x 75 mm of 12 SWG sheet tubes duly embedded in and including cement concrete M-15 grade blocks of 600 mm x 600 mm x 750 mm below ground level. All M.S . will be stove enameded on both side Lettering and painting with ready mixed synthic enamel paint of superior quality in required shade and colour. All section of framed post and steel tube will be painted with primer and two coats of epoxy paint as per specification saction 1700 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying dry rubble flooring as per drawing and technical specification clause 1303 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying concrete for plain / reinforcement conc. In Super structure as per drawing and technical specification clause 802,1401 PCC grade M-25 for nominal mix 1: 1.5 : 3( One cement : one point half sand three graded stone aggregate 20 mm ( twenty millimetre ) nominal size including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Supplying , fitting and placing bar reinforcement in super structure complete as per drawing and technical specification clause 1001 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Providing and laying concrete for plain / reinforcement concrete In open foundation as per drawing and technical specification clause 802,803,1202,1203 PCC grade M-20 for nominal mix including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Construction of RCC railing of M-25 grade cast in situ with 20 mm ( Twenty Millimetre) nominal size stone aggregate true to line and grade tolerance of vertical railing post not to exceed 1 in 500 centre to centre spacing between vertical post not to exceed 2000 mm as per drawing and technical specification clause 1404.3 including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Drainage spout complete as per drawing and technical specification clause 1404.5 complete including carriage of material within all leads, lifts and other incidental as per the direction of Engineer-in-Charge.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, sapling and tress of girth upto 300 mm (Three hundred millimeter), removal of stumps of such tress cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned, upto all leads including removal and disposal of top organic soil not exceeding 150 mm (One hundred Fifty millimeter) in thickness as per drawing and MORD Technical Specification Clause 201 including carriage of material with-in all leads, lifts and other incidentals as per the direction of Engineer-in-Charge.
Routine maintenance After completion of construction condition of bit document that is 4 (vi) Of contract data to general constitution of contact and technical specification of Ministry of rural development for rural roads August 2004 For rural roads including hauling/carriage of all labour equipment and material to various locations all mode of transportation in all leads and lifts to the entire satisfaction as per direction of the Engineer-in-Charge.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Sandeep Kumar Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .