| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.2 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹10.2 L | L-1 | Accepted-AOC Accept |
| 2 | L-2₹10.3 L+₹10,565.03 (1.04%)Rejected-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹10.3 L+₹10,565.03 (1.04%) | L-2 | Rejected-AOC Accept |
| 3 | L-3₹10.5 L+₹30,515.49 (3.00%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | ₹10.5 L+₹30,515.49 (3.00%) | L-3 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | TRIBHUWAN ENTERPRISES L1 | TRIDEO CONSTRACTION L2 | CHAHAT CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.00 | A. Deck plate channel repairing work of the 303 and 304 belt conveyor Frame and roller dismantling cost. | 12.89 | MT | 2,600 ₹33,519.2 Lowest | 2,650 ₹34,163.8 | 2,700 ₹34,808.4 |
| 2.00 | Deck plate dismantling cost (90% of 5.102MT)=4.592MT & (90% of6.888MT)=6.199MT=4.592+6.199= | 10.79 | MT | 6,900 ₹74,457.9 Lowest | 6,950 ₹74,997.45 | 7,020 ₹75,752.82 |
| 3.00 | Old channel & support dismantling cost. (1.278+1.736MT)=3.014MT | 3.01 | MT | 6,900 ₹20,796.6 Lowest | 6,950 ₹20,947.3 | 7,020 ₹21,158.28 |
| 4.00 | Deck plate , channel & support fabrication cost. 5.102+2.130= 7.232MT and 6.888+2.893= 9.781MT | 17.01 | MT | 16,400 ₹2,79,013.2 Lowest | 16,500 ₹2,80,714.5 | 16,800 ₹2,85,818.4 |
| 5.00 | Frame and roller installation cost. (5.486+7.406)=12.892MT | 12.89 | MT | 5,200 ₹67,038.4 Lowest | 5,300 ₹68,327.6 | 5,500 ₹70,906 |
| 6.00 | B. Tail frame arramgement and Deck plate arramgement (a) Shifting of new item at site. (tail frme arrangement, deck plate arrangement.(2733.52+3839.18Kg)=6572.70Kg, Say-6.572MT and Shifting of old metrials to scrap yard. (6.572+3.943)=10.515MT | 21.03 | MT | 1,700 ₹35,754.4 Lowest | 1,750 ₹36,806 | 1,800 ₹37,857.6 |
| 7.00 | (b) Dismantling of idler with frame 90% of new (2.748)=2.473MT+T&H pulley =2.473+2.487=4.960MT | 9.92 | MT | 2,600 ₹25,792 Lowest | 2,650 ₹26,288 | 2,700 ₹26,784 |
| 8.00 | (c) Dismantling of tail base arrangement + deck plate arramgement 60% of new(6.573MT)=3.943MT | 7.89 | MT | 6,900 ₹54,413.4 Lowest | 6,950 ₹54,807.7 | 7,020 ₹55,359.72 |
| 9.00 | (d) Fabriction & erection of as above said works. | 13.15 | MT | 16,400 ₹2,15,594.4 Lowest | 16,500 ₹2,16,909 | 16,800 ₹2,20,852.8 |
| 10.00 | (e) Installation & alignment H&T pulley + frame with idler 2.487+2.748MT=5.235MT | 10.47 | MT | 5,219 ₹54,642.93 Lowest | 5,350 ₹56,014.5 | 5,500 ₹57,585 |
Tender Value
₹10.2 L
EMD Value
₹12,800
Closing Date
17 Jul 2026, 6:00 pmClosed
RAVI RANJAN
KEDLA WASHERY
Repairing and replacement of damaged 303 and 304 belt conveyor deck plate channel and replacement of damaged non-drive tail frame arrangement, deck plate arrngmnt top and bottom idler frame, tail ,head snub pulley of unit. no. 247 and 415 B/C of KW
2026_CCL_361726_1
PO/KW/E-Tender/26-27/08 , Date- 06.07.2
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,800
Yes
4 Sept 2026
6 Jul 2026
18 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
7 Jul 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. Deck plate channel repairing work of the 303 and 304 belt conveyor Frame and roller dismantling cost. | 12.89 | MT | - | - |
| 2 | Deck plate dismantling cost (90% of 5.102MT)=4.592MT & (90% of6.888MT)=6.199MT=4.592+6.199= | 10.79 | MT | - | - |
| 3 | Old channel & support dismantling cost. (1.278+1.736MT)=3.014MT | 3.01 | MT | - | - |
| 4 | Deck plate , channel & support fabrication cost. 5.102+2.130= 7.232MT and 6.888+2.893= 9.781MT | 17.01 | MT | - | - |
| 5 | Frame and roller installation cost. (5.486+7.406)=12.892MT | 12.89 | MT | - | - |
| 6 | B. Tail frame arramgement and Deck plate arramgement (a) Shifting of new item at site. (tail frme arrangement, deck plate arrangement.(2733.52+3839.18Kg)=6572.70Kg, Say-6.572MT and Shifting of old metrials to scrap yard. (6.572+3.943)=10.515MT | 21.03 | MT | - | - |
| 7 | (b) Dismantling of idler with frame 90% of new (2.748)=2.473MT+T&H pulley =2.473+2.487=4.960MT | 9.92 | MT | - | - |
| 8 | (c) Dismantling of tail base arrangement + deck plate arramgement 60% of new(6.573MT)=3.943MT | 7.89 | MT | - | - |
| 9 | (d) Fabriction & erection of as above said works. | 13.15 | MT | - | - |
| 10 | (e) Installation & alignment H&T pulley + frame with idler 2.487+2.748MT=5.235MT | 10.47 | MT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_374616.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .