| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC V P O JHAKRI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.6 L Quoted ₹2.7 L | L1 | Accepted-AOC Quoted rates at lower sides. |
| 2 | L2₹2.8 L+₹13,609 (5.11%)Rejected-Finance NIL | ₹2.8 L+₹13,609 (5.11%) | L2 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
| 3 | L3₹2.9 L+₹19,591 (7.35%)Rejected-Finance HIMACHAL PRADESH HP | ₹2.9 L+₹19,591 (7.35%) | L3 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
Tender Value
₹2.6 L
EMD Value
₹6,550
Closing Date
4 May 2026, 3:30 pmClosed
SR. XEN
ED RECKONG PEO
Tender for restoration of 22KV HT line and 22/0.4KV, 100KVA S/Stn. By proposing new 22KV HT line and 22/0.4KV, 100KVA S/Stn. at site of Brij Gopal Construction Company at Pooh, damaged and wasd away due to flash flood an dated 13/08/2025 in Electrica
2026_HPSEB_135161_1
RPO/ED/DB-11/2026-27/11
Open Tender
Supply and Erection
Percentage
30 days
POOH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹6,550
10 Jul 2026
27 Apr 2026
5 May 2026
27 Apr 2026
4 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ERRECTION OF 22KV H.T LINE | - | - | - | - |
| 2 | (i) Digging of pit, (ii) Erection of pole, Laying and concreting of RCC muff (iii) filling of pit & Ramming (iv) Drilling of holes in X-arms (v) fixing of insulator, X-arm, knee-bracing set, top clamp (vi) fixing of Barbed wire, Danger plate (vii) painting of pole S/Pole str. (Complete in all respect). | - | P/Str. | 6,033.34 | - |
| 3 | ERRECTION OF STAY SET | - | - | - | - |
| 4 | (i) Digging of pit (ii)fixing of stay rod (iii) Filling of pit (iv)Nozzeling & Tighting. | - | P/Set | 2,338.76 | - |
| 5 | Sagging of ACSR Conductor 6/1/3.35mm (Single wire). | - | - | - | - |
| 6 | Laying of conductor (i) stringing & sagging (ii) binding with insulator. | 1 | P/Km | 16,780.78 | ₹16,764 |
| 7 | MANNUAL CARRIAGE OF H.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.200 K.M. | 1 | P/Km | 14,112.8 | ₹14,098.69 |
| 8 | Erection of 100KVA S/Stn. | - | - | - | - |
| 9 | Digging of pit for pole and earthing, drilling of holes in x-arm, preparation of plate form, Str. Member C.I A.I. X-arm, knee bracing set, erection of D-pole, c.c.muff, erection of plate form, erection of x-arm, dropout fuse unit, lightning arrester, MCCB switch, L.T box, energy meter, erection of transformer, G.O switch, stay set, jumper earthing 3 sets, L.T cables, painting etc. (Complete in all respect). | - | Each | 90,921.36 | - |
| 10 | Mannual carriage of sub-station material for an average distance of 0.200Km. | - | P/Km. | 5,367.35 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_200138.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .