Tender Value
₹14.9 Cr
EMD Value
₹29.7 L
Closing Date
26 Sept 2026, 6:00 pm
A.G.M (E-E)
O/o A.G.M (E-E), ATS Building, MBB Airport, Agartala-799009
Provision of ground mounted solar power plant at MBB Airport, Agartala.
2026_AAI_289733_1
AAI/AGT/ENGG(E)/ENIT-07/26-27
Open Tender
Electrical Works
Item Rate
MBB Airport, Agartala
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,540
AAI
₹29.7 L
Agartala, Tripura
4 Sept 2026
4 Sept 2026
1 Oct 2026
4 Sept 2026
26 Sept 2026
4 Sept 2026
4 Sept 2026 - 11 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH- I: DSITC Work
Design, Detailed Engineering, Supply, Installation, Testing and Commissioning (DSITC) of Grid Connected ground mounted Solar PV Power Generation Plant of 1600 kWp capacity with structure made up of aesthetically appealing hot dip GaIvanised MS structure with PV modules of minimum 560Wp, Half-Cut Mono Crystalline TopCon, Minimum Efficiency: 21% at STC, suitable for maximum 1500 VDC, fixed in anodized aluminium frame complete as required including elevated structural support systems, foundation for all components after proper soil investigation/treatment as per site conditions, proper Communication, Data, Control, Power Cables & Safety System for reverse power protection, min. IP65 rated DC DB/JB for connection of modules to inverters through DC copper cables of suitable capacity laid in HDPE pipes, Power Conditioning Units, String Monitoring Units, Meters, Surge & Lightning Protection System (as per NBC 2016), Earthing of modules & structures, extraction of groundwater through borewell and further suitable treatment, Water cleaning system with proper drainage, 33 kV HT evacuation & injection at suitable injection point as per site conditions through cables, switchgears, power transformers of suitable capacity for minimal voltage drop/losses, End terminations at 33 kV HT panel and cable laying for connection to existing electrical installations (cable laying should be in HDPE pipes of suitable size as per site conditions, MNRE guidelines & relevant IEC 62548 & IEC 61215 ,62804), Auxiliary & Control Supply System, Data Acquisition system (complete with Hardware, Software, Switchgear, Cabling, Air Conditioning of room etc.) for local & remote monitoring, communication & control cabling alongwith providing Fire Extinguishers of required numbers & capacity, LED type Internal and External Lighting for general illumination in Solar Plant, Control Room, Inverter/Transformer Room etc. i/c wiring / cabling, MCBs, DBs, Switches etc, Plant Solar Radiation & Environment Monitoring System, Shadow Analysis, Glare Analysis for safe flight operations, Clearance from DISCOM and approvals from other Statutory Agencies, Transportation & Insurance of material etc. and any other items/accessories/clearances/services required for successful commissioning of power plant on "Turnkey basis" complete in all respects as per the technical specifications, terms & conditions specified in the tender document and handing over the Solar PV Power Generation System to AAI. The complete system shall be under Defect Liability Period (DLP) of 02 years.
Scope of work also includes the following:
1) Supply, Installation, Testing and Commissioning (SITC) of 33 kV HT Panel comprising of 03 nos HT breaker at Evacuation Point.
2) Supply and laying of 33 kV power cable of suitable cross section in ground by using HDPE pipe through Horizontal Directional Drilling (HDD) from Solar Power Plant to HT Evacuation point. | 1 | Job | - | - |
| 2SH-II: Operation and routine maintenance after DSITC. Operation and routine maintenance viz regular cleaning, servicing, daily monitoring of system, compilation of solar generation and serviceability reports, minor troubleshooting etc of solar power plant for 12 years after completion of DSITC work (including DLP of 02 years) by deploying following manpower at site along with providing required tool and consumables for 6 days a week (including Saturday & Gazetted Holidays but excluding Sunday) to keep the system in healthy, serviceable state as per OEM recommendation, good engineering practices and as tender terms & conditions etc.complete as required and to the satisfaction of Engineer-in- Charge. a) Skilled - 1 No. in General Shift. b) Unskilled - 1 No. in General Shift. | |||||
| 2.01 | 1st year | 1 | Year | - | - |
| 2.02 | 2nd year | 1 | Year | - | - |
| 2.03 | 3rd year | 1 | Year | - | - |
| 2.04 | 4th year | 1 | Year | - | - |
| 2.05 | 5th year | 1 | Year | - | - |
| 2.06 | 6th year | 1 | Year | - | - |
| 2.07 | 7th year | 1 | Year | - | - |
| 2.08 | 8th year | 1 | Year | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tender_Documents.pdf
Tender Documents • 16.98 MB
BOQ_338170.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .