Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹3.6 L (1.59%)Rejected-AOC KARIMKUTTIYIL BUILDINGS ANGADI P O RANNI PATHANAMTHITTA 689 674 | PATHANAMTHITTA | KERALA | 689674 | ₹2.3 Cr+₹3.6 L (1.59%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M K KAVITHA L1 | DORA INFRASTRUCTURES AND PROPERTIES Pvt LIMITED L2 |
|---|---|---|---|---|---|
| 0.00CIVIL WORKS | |||||
| 1.00SITE CLEARANCE | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 465.63 | sqm | 17.95 ₹8,358.06 Lowest | 18 ₹8,381.34 |
| 1.02EARTH WORK AND EXCAVATION | |||||
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 270.74 | cum | 355.04 ₹96,123.88 Lowest | 360 ₹97,466.76 |
| 1.04 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 311.36 | cum | 314.33 ₹97,870.1 Lowest | 320 ₹99,635.52 |
| 1.05 | Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 15.84 | cum | 129.32 ₹2,048.43 Lowest | 130 ₹2,059.2 |
| 1.06PCC | |||||
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 64.5 | cum | 7,829.76 ₹5,05,043.01 Lowest | 8,000 ₹5,16,024 |
| 1.08 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | 60 | sqm | 164.48 ₹9,868.8 Lowest | 165 ₹9,900 |
Tender Value
₹2.3 Cr
EMD Value
₹1 L
Closing Date
4 Oct 2025, 3:00 pmClosed
ASSOCIATE VICE PRESIDENT
HLL Lifecare Limited, HLL Bhavan, No26/4, Tambaram-Velachery Main Road, Pallikaranai, Chennai 600 100, Tamilnadu
Construction of New OP Building at CHC Elanthoor, Pathanamthitta District, Kerala
2025_HCDPS_802908_1
HLL/CMO/HCD/CHC/ETR-PTA/25-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
CHC Elanthoor
Please refer Tender documents.
20 documents required · 20 mandatory
₹8,850
Yes
₹1 L
Yes
1 Nov 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
4 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .