Loading…
Loading…
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer Panchayat Road and Building Division, Bhavnagar
Construction of Shed at Bhadbhid Village Near the Lake Ta. Bhavnagar, Dist. Bhavnagar
305407
1/2026-27 of Bhavnagar Sr. No.5
Open
Civil - All
Works
Bhavnagar
5 documents required · 5 mandatory
₹900
Executive Engineer Panchayat R&B Division Bhavnagar
₹6,000
15 May 2026
15 May 2026
15 May 2026
25 May 2026
15 May 2026
Name of Work :- Construction of Shed at Bhadbhid Village Near the Lake Ta. Bhavnagar,
Dist. Bhavnagar
Bill of Quantities
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
1 23.340 Cum Excavation for foundation up to 1.50 160.89 Rupees One One
MT depth including sorting out and Hundred Sixty Cubic
stacking of useful materials and And Paise Eighty metre
disposing the excavated stuff up to Nine Only
All lead (A) Dense or Hard soil
2 13.880 Cum Providing and laying cement concrete 3106.66 Rupees Three One
1:3:6 (1- Cement : 3- coarse sand : 6- Thousand One Cubic
Machine crushed stone aggregates 40 Hundred Six metre
mm nominal size) and curing And Paise Sixty
complete excluding cost of formwork Six Only
in (A) Foundation and Plinth (upto
3 1.820 Cum Providing and laying cement concrete 4048.88 Rupees Four One
work 1:1.5:3 (1- Cement : 1.5- Thousand Forty Cubic
Coarse sand : 3- graded stone Eight And Paise metre
aggregates 20 mm nominal size) and Eighty Eight
curing complete excluding cost of Only
formwork and reinforcement for
reinforced concrete work in (A)
Foundations, footings, Base or
columns and Mass concrete (upto
4 13.140 Cum Brick work using comon burnt clay 4279.97 Rupees Four One
building brick having crushing Thousand Two Cubic
strength not less then 35Kg/Sq.Cm. Hundred Seventy metre
In foundation and plinth in cement Nine And Paise
mortar 1:6 (1 Cement : 6 Fine sand) Ninety Seven
(B) conventional Only
5 29.010 Cum Filling in foundation and plinth with 137.47 Rupees One One
sand in layers of 20 cm thickness Hundred Thirty Cubic
including watering ramming and Seven And Paise metre
consolidating etc. Forty Seven Only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
6 1984.330 Kg Galvanized work welded in built up 121.20 Rupees One One
sections framed work including Hundred Twenty Kilogram
cutting, hoisting, fixing in position One And Paise
etc complete as directed by engineer Twenty Only
in charge . (D) In trussses and trussed
purlins, upto 25 M. span and 15 M.
ovarall height. (upto 10 ton)
7 291.200 Kg Providing TMT Bar FE 415 68.32 Rupees Sixty One
reinforcement for R.C.C. work Eight And Paise Kilogram
including bending, binding and Thirty Two Only
placing in position complete upto
floor two level
8 110.950 Sqm Providing corrugated G.I. sheet of 734.18 Rupees Seven One
class-3 roofing fixed with Hundred Thirty Squere
glavanished iron J or L Hooks, Bolts Four And Paise metre
and nuts 8mm diameter with bitumen Eighteen Only
and G.I. limpet washer or G.I. limpet
washer. filled with white lead
complete including Mobhayu But
excluding the cost of purlins, Rafters
and Trusses.(1) 0.80 mm thick sheet.
9 27.150 Sqm Providing 15mm thick cement plaster 176.14 Rupees One One
in single coat on Rough (Similar)side Hundred Seventy Squere
of single or half brick walls for Six And Paise metre
interior plastering upto floor two Fourteen Only
level and finished even and smooth in
(ii) Cement mortar 1:4(1-cement :4-
sand) Incl. cement paint etc.
10 106.750 Sqm Providing and laying polished Kota 1019.39 Rupees One One
stoneslab flooring over 20mm Thousand Squere
(Average) thick base of cement Nineteen And metre
mortar 1:6 (1-cement : 6-coarse sand) Paise Thirty Nine
or L.M. 1.1.5 (1-Lime putty:1.5 - Only
coarse sand) laid over and jointed
with grey cement slurry mixed with
pigment tomatch the shade of slab
including rubbingand polishing etc.
complete. (A) 25mm thick
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
11 21.780 Sqm Applying two coats of oil Paint with 132.01 Rupees One One
priming coat/Red oxide over new Hundred Thirty Squere
steel and other metel surface after Two And Paise metre
and including preparing the surface One Only
by throughly cleaning, oil,grease, dirt
and other foreign matter and scoured
with brushes fine steel wood,
scrapers and sand paper with ready
mixed priming paint brushing red
lead.Painting two coats (excluding
priming coat on new steel and other
metal surface with enamel paint,
brushing, interior to give an even
shade including cleaning the surface
an even shade including cleaning the
surface of all dirt, dust and other
foreign matter.
Rupees Five Lakh(s) Seventy Two Thousand Eight Hundred One And Paise Forty Nine Total Rs.
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow
percent ( Should be written in figures and words ) of the estimated rate mentioned above.
Amount of My \ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Bhavnagar Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR SBD.pdf
Tender Notice No.1 2026-27 with sudharo.pdf
1.SBD Shed work Bhadbhid.pdf
2.Schedule-B-Shed work Bhadbhid.pdf
DRG Shed work Bhadbhid.pdf
Specification Shed work Bhadbhid.pdf
Test Schedule-Shed work Bhadbhid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].