| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹7.6 Cr+₹26.7 L (3.61%)Accepted-AOC | ₹7.6 Cr+₹26.7 L (3.61%) | L3 | Accepted-AOC other than lowest |
| 2 | L1₹7.4 CrRejected-AOC F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹7.4 Cr | L1 | Rejected-AOC Lowest bidder |
| 3 | L2₹7.5 Cr+₹13.2 L (1.78%)Rejected-AOC | ₹7.5 Cr+₹13.2 L (1.78%) | L2 | Rejected-AOC other than lowest |
| 4 | L4₹8.2 Cr+₹81.2 L (11.0%)Rejected-AOC | ₹8.2 Cr+₹81.2 L (11.0%) | L4 | Rejected-AOC other than lowest |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Others-Firm have uploaded the registration certificate having work capacity of Rs. 750.00 lakh which is less than the DNIT amount and does not fulfil the NIT criteria. |
Tender Value
₹8.5 Cr
EMD Value
₹8.5 L
Closing Date
23 Aug 2021, 5:00 pmClosed
EE JS Division Sundernagar
EE JS Division Sundernagar
SH Upgradation of existing 3.54 MLD STP in MBBR technology including tertiary treatment automation of STP to upgraded capacity of 4.50 MLD including operation and maintenance of STP for five years
2021_HPIPH_51164_1
EE JSD SNR ES Tender/2020-7162-7210 dt. 12.08.2021
Open Tender
Miscellaneous Works
Item Rate
450 days
Sundernagar
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,500
EE Sundernagar
₹8.5 L
23 Dec 2021
12 Aug 2021
24 Aug 2021
12 Aug 2021
23 Aug 2021
12 Aug 2021
Amount
Upgradation,Capacity enhancement of existing 3.54 MLD STP at Chandpur Sunder Nagar, presently working on extended aeration technology, to 4.50 MLD, by way of retrofitting the existing infrastructure on the basis of MBBR technology followed by teritiary treatment including design, construction, site development, hydraulic testing, commissioning and giving satisfactory trials. The work shall include construction of all necessary civil structures (with use of existing units including necessary repais of clarifier and other units) like R.C.C inlet chambers, coarse screen channel (mechanical). Grit chambers, intermediate sewage holding chambers. Equalizatioin tanks, anoxic tanks, tube settlers, Volute Press Machine, DWPE dosing tank, DMF and Disinfection system house etc, including all primary and secondary treatment units, electrical, instrumentation and mechanical works in limited identified land space as per the requirment of designed CPHEEO norms, relevant IS codes etc. with use of existing units & necessary piping work with required valves, gates, drains, internal roads, path ways, compound wall, tools and plants, treated effluent arrangements complete as turn key job with all requisit civil, electrical, instrumentation and mechanical works as per detailed specifications for civil, electrical, instrumentation and mechanical components complete to achieve latest CPCB/HPPCB/CPHEEO dischage standards BOD<10ppm, TSS<10ppm, biological TN<10ppm, and PO4<2ppm, to get the recyclable quality of water for industrial/agricultrual purposes. The coagulant system shall be provided as an optional/backup. Disinfection system by UV disinfection/Gaseous chlorination shall be provided. All STP units shall be interconnected. Sewage Treatment Plant shall be equipped with DG set of required capacity and with SCADA system and PLC System to ensure the online monitoring of all the units and outlet monitoring. Existing Laboratory shall be strengthened by providing equipments/Instruments as per CPHEEO and NABL norms. All units shall be provided with suitable R.C.C. overhead walkways at the STP component as per scope and confirming norms as mentioned above. This also includes Operation and Maintenace of existing Sewage Treatment Plant and Plant after proposed retrofitting by the way of MBBR Technology.The Contractor/Firm shall be responsible for operating and maintaining the plant properly as per CPHEEO manual on operation and maintenance of Sewerage and Sewage Treatment System for achieving the desired results as per CPCB during the execution of the upgradation work. The Contractor shall operate, maintain and repair the entire Plant & associated Civil, Electrical and Mechanical components/works including cost of chemicals/Poly-electrolytes for a total upgradation period of five years. All necessary repairs, maintenance, overhaul, replacements etc, shall be made during the O & M period.
Operation and maintenance of sewage treatment plant as per CPHEEO mannual on operation and maintenance of Sewerage and sewage treatment plant for achieving the desired results as per CPCB BS and terms & conditions attached.The Contractor shall operate, maintain and repair the entire Plant & associated Civil, Electrical and Mechanical components/works including cost of chemicals/Poly-electrolytes for a operation and maintenacne period of five years. All necessary repairs, maintenance, overhaul, replacements etc, shall be made during the O & M period. Ist year
2nd year
3rd year
4th year
5th year
21st Century Enviro Engineers Pvt. Ltd.
Oasis EPC Solutions Ltd
RK Gupta AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .