Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 101 102 FIRST FLOOR TIRUPATI TRADE CENTRE NAVGHAR VASAI ROAD EAST NAVGHAR PALGHAR MAHARASHTRA 401202 | PALGHAR | MAHARASHTRA | 401202 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
20 Jan 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
OFFLOADING FOR OVERHAULING OF ROUTINE / REPAIR OF PALFINGER CRANE ONBOARD IN SHIPS TARKASH NR 20 AND TRIKAND NR 20
2020_NAVY_408211_1
DYT/FAB/20-21/106A)2/PL-IN/ PALFINGER-TRIKAND/104
Single
Miscellaneous Services
Item Rate
180 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
NAVAL DOCKYARD MUMBAI
21 Jan 2021
30 Dec 2020
21 Jan 2021
30 Dec 2020
20 Jan 2021
11 Jan 2021
11 Jan 2021
180 days
Amount
For Services :- Pre-Refit Trials of PK18500M with/ without Load to identify defects, Abnormal Noise, Erratic Functioning
For Materials : Annual/100 Hrly Routine of Palfinger PK18500M : Carry out routine maintenance of equipment. This job involves serviceability checks for operation of functions of slewing unit CPGG0031, overload system 030.0100, lifting CPUP0127 system, outer principle boom system CPUP0105, Extension Ram 1 & 2 of S305T01-A system, S2.5R Winch and functioning of safety components as per OEM Instructions.
For Services :-Annual/100 Hrly Routine of Palfinger PK18500M : Carry out routine maintenance of equipment. This job involves serviceability checks for operation of functions of slewing unit CPGG0031, overload system 030.0100, lifting CPUP0127 system, outer principle boom system CPUP0105, Extension Ram 1 & 2 of S305T01-A system, S2.5R Winch and functioning of safety components as per OEM Instructions.
For Materials :- Dismantling of Defectibe Assembly / Rountine / Preventive Maintennace of components (High pressure Filters, Breather), Rope End Switch assembly BW405 components, trolley Head Assembly components, Load attachment EZ1600RI, Bottom sheaver UL115, Safety Latch, Limit Switches, Electrical Motor, HPU inner fittings, Oil Level Sight component R900007824 and Control system DE-091. Transportation from Naval Dockyard to Factory at VASAI
For Services :- Dismantling of Defectibe Assembly / Rountine / Preventive Maintennace of components (High pressure Filters, Breather), Rope End Switch assembly BW405 components, trolley Head Assembly components, Load attachment EZ1600RI, Bottom sheaver UL115, Safety Latch, Limit Switches, Electrical Motor, HPU inner fittings, Oil Level Sight component R900007824 and Control system DE-091. Transportation from Naval Dockyard to Factory at VASAI
For Materials : Overhauling / Renewal of defective oil seals, Hoses & pipes from HPU unit, Hoses & pipes from HPU unit, Hoses & pipes from slewing unit CPGG0031, Hoses & Pipes from lifting CPUP0127 system, Hoses & Pipes from outer principle boom system CPUP0105, Hoses & Pipes from Extension Ram 1 & 2 of S305T01-A system, Hoses & Pipes from S2.5R Winch, adapter flanges from Axial piston unit R910916805, Control System DE-091, power unit gaskets & testing of overhauling components on test bench prior assembly on equipment.
For Services :- Overhauling / Renewal of defective oil seals, Hoses & pipes from HPU unit, Hoses & pipes from HPU unit, Hoses & pipes from slewing unit CPGG0031, Hoses & Pipes from lifting CPUP0127 system, Hoses & Pipes from outer principle boom system CPUP0105, Hoses & Pipes from Extension Ram 1 & 2 of S305T01-A system, Hoses & Pipes from S2.5R Winch, adapter flanges from Axial piston unit R910916805, Control System DE-091, power unit gaskets & testing of overhauling components on test bench prior assembly on equipment.
For Materials :- Inspect the cable pulleys and check for serviceability, Inspect all Tubings, actuators, load holding units for their operation, peak pressure switch assembly, emergency cut-off and services as necessary. Check all load bearing Members (pulleys, Wires ropes, and Hooks). Gear Oil to be changed.
For Services :- Inspect the cable pulleys and check for serviceability, Inspect all Tubings, actuators, load holding units for their operation, peak pressure switch assembly, emergency cut-off and services as necessary. Check all load bearing Members (pulleys, Wires ropes, and Hooks). Gear Oil to be changed.
For Materials : - Check the attachment of the Crane to Ship's foundation and component clamps, Tube clips, stiffening plate, mounting bands, hose rings, protecting spirals. If necessary, ighten the joints and connections.
For Services :- Check the attachment of the Crane to Ship's foundation and component clamps, Tube clips, stiffening plate, mounting bands, hose rings, protecting spirals. If necessary, ighten the joints and connections.
For Services :- Re-Assembly & Installation of Components on Equipment
For Services :- Trials onboard Ship after complete integration of system
stage.html
html • 0.02 MB
finance_455835.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .