Loading…
Loading…
Tender ID
Tender Value
₹15.0 L
EMD Value
₹15,000
Closing Date
21 Feb 2026, 6:00 pmClosed
Executive Engineer, Panchayat Irrigation Division, Amreli
Raising of Existing Earthen Bund to Protect Mota Gokharavala Village During River Flood, Ta.Amreli
272444
17 of 2025-26
Open
Miscellaneous Works
Works
Amreli
8 documents required · 5 mandatory · 3 optional
₹900
Yes
Executive Engineer Panchayat Irrigation DIvision Amreli
₹15,000
Yes
6 Feb 2026
6 Feb 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Ite Description of Item (with brief specification and reference to book of Quantity Unit Rate In Amount
m specifications) figures
1. Jungle Clearance (Ganda Baval etc.) of Light/Heavy dence (work done by
manually or by machinery) including grabbing of & removing the roots & girth
completely from the ground & back fill with earth & making surface good as
directed including depositing & removing the material away from the site of
work at own risk and cost as and where directed etc. completed for following.
(b) Heavy density
2. Strengthening of existing earthen bund by obtaining earth from deepening
Bandhara using watering/ Pneumatic Temping work etc. Complete as 6,750.00 Cum. 104.90
suggested by Engineer in charge.
3. Providing and laying dry rubble stone pitching without base inverted filter/
murrum bedding and header stone including hand packing & trimming & 3,015.00 Sqmt. 253.00
dressing slopes etc complete. B) 23 cms thick stone pitching
Deputy Executive Engineer Divisional Accounts Officer Executive Engineer
MIP Sub Division Panchayat Irrigation Division Panchayat Irrigation Division
Amreli Amreli Amreli
ords) of the estimated rate
mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
In words In words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Documents to be submited.pdf
DTP SBD-Mota Gokharwala Bund 2026.pdf
Gokharvala BOQ.pdf
Notice No. 17 - 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .