Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC UPENDRAVILASAM STAIONKADVU KULATHOOR PO AE POTHENCODE PANCHAYATH | THIRUVANANTHAPURAM | KERALA | 695001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.6 L+₹86,374.09 (2.56%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Praveen L1 | R P UDAYAKUMAR L2 |
|---|---|---|---|---|---|
| 1.00MCF Construction | |||||
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 29.69 | cum | 13,397.34 ₹3,97,726.83 Lowest | 13,740.86 ₹4,07,924.91 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.12 | cum | 12,729.61 ₹1,92,471.7 Lowest | 13,056.01 ₹1,97,406.87 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 149.07 | sqm | 958.04 ₹1,42,815.02 Lowest | 982.6 ₹1,46,476.18 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 168 | sqm | 1,005.19 ₹1,68,871.92 Lowest | 1,030.96 ₹1,73,201.28 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,293.22 | kilogram | 112.05 ₹3,69,005.3 Lowest | 114.92 ₹3,78,456.84 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 201.42 | sqm | 760.34 ₹1,53,147.68 Lowest | 779.84 ₹1,57,075.37 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 45 | metre | 227.37 ₹10,231.65 Lowest | 233.2 ₹10,494 |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 732 | kilogram | 116.3 ₹85,131.6 Lowest | 119.28 ₹87,312.96 |
| 1.01 | OD441945/2025-2026:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses
etc.,
including cutting, hoisting, fixing position ,bending charge and applying a priming coat
of
approved steel primer, including welding and bolted with special shaped washers etc.
complete.Hot finished welded type tubes | 3,449.68 | kg | 217 ₹7,48,580.56 Lowest | 222.56 ₹7,67,760.78 |
Tender Value
₹3.5 L
EMD Value
₹50,000
Closing Date
18 Mar 2026, 4:00 pmClosed
Assiustant Engineer
O/O Assistant Engineer Kadinamkulam GP
Project No 297/25-26 Construction of MCF II nd phase in ward 23 Kadinamkulam GP
2026_LSGD_845036_1
06/2025/AE/LSGD/KDKM Dated 09.03.2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Kadinamkulam
Please refer Tender documents
9 documents required · 9 mandatory
₹2,760
₹50,000
2 Jul 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MCF Construction | |||||
| 1.001 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.002 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.003 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.008 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kilogram | - | - |
| 1.009 | OD441945/2025-2026:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses
etc.,
including cutting, hoisting, fixing position ,bending charge and applying a priming coat
of
approved steel primer, including welding and bolted with special shaped washers etc.
complete.Hot finished welded type tubes | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_1426898.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .