Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.2 L+₹1,151.55 (0.27%)Rejected-AOC | ₹4.2 L+₹1,151.55 (0.27%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BIJU M T L1 | RAHMATHULLA K K L2 |
|---|---|---|---|---|---|
| 1.00ANGANWADY FINISHING WORKS | |||||
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 7.39 | sqm | 882.92 ₹6,524.78 Lowest | 890 ₹6,577.1 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.82 | cum | 12,346.86 ₹10,149.12 Lowest | 12,350 ₹10,151.7 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 82.2 | kilogram | 103.26 ₹8,487.97 Lowest | 105 ₹8,631 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.15 | cum | 7,286.51 ₹22,981.65 Lowest | 7,287 ₹22,983.2 |
| 1.00 | 50.6.7.3:Laterate masonry with neatly dressed laterate stone of size 40x20x15 cm or nearest size in cement mortar 1:6 for superstructure above floor two level upto floor five level including all cost of materials, labour charges etc. | 1.5 | cum | 9,422.98 ₹14,134.47 Lowest | 9,425 ₹14,137.5 |
| 1.01 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 180.3 | sqm | 353.88 ₹63,804.56 Lowest | 355 ₹64,006.5 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 56.22 | sqm | 315.78 ₹17,753.15 Lowest | 316 ₹17,765.52 |
| 1.01 | 21.1.2.3:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Polyester powder coated aluminium (minimum thickness of polyester powder coating 50 micorn) | 37.61 | kg | 660.45 ₹24,840.85 Lowest | 662 ₹24,899.14 |
| 1.01 | 21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/sqm) | 7.71 | sqm | 1,174.62 ₹9,056.32 Lowest | 1,175 ₹9,059.25 |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
30 Aug 2025, 12:00 pmClosed
SECRETARY
KUNNAMANGALAM BLOCK PANCHAYATH
MLA-SDF-KGM BP 2025-26.Poyya Anganavady Completion in Kunnamangalam GP -..-General Civil Work
2025_CRD_789155_2
2055194
Open Tender
Civil Works - Buildings
Item Rate
KUNNAMANGALAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,593
Yes
22 May 2026
21 Aug 2025
1 Sept 2025
21 Aug 2025
30 Aug 2025
21 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1299791.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
pa.pdf
Tender Documents • 0.26 MB
POYAASBD.pdf
Tender Documents • 2.16 MB
BOQ_1299791.xls
BOQ • 0.31 MB
fot.pdf
Tender Documents • 0.25 MB
affdvt.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .