| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAdmitted-Finance | ₹48.8 L | L1 | Admitted-Finance |
| 2 | L2₹52.1 L+₹3.3 L (6.74%)Admitted-Finance | ₹52.1 L+₹3.3 L (6.74%) | L2 | Admitted-Finance |
| 3 | L3₹53.0 L+₹4.1 L (8.49%)Admitted-Finance | ₹53.0 L+₹4.1 L (8.49%) | L3 | Admitted-Finance |
| 4 | L4₹55.1 L+₹6.3 L (12.9%)Admitted-Finance | ₹55.1 L+₹6.3 L (12.9%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M N NAIDU CONSTRUCTIONS L1 | V SURENDRA NAIDU L3 | CHINTHADA VENKATA RAO L2 | LINGAM RAVI KIRAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of brick work over stupa as a supportive wall in circular manner as a toe wall by Brick work with common burnt clay bricks etc., complete as directed by site-in-Charge. | 27 | Cu.m | 12,000 ₹3,24,000 | 12,500 ₹3,37,500 | 11,000 ₹2,97,000 Lowest | 13,000 ₹3,51,000 |
| 2.00 | Filling murrum over stupa top area to prevent the water stagnation includes cost of material and labour charges etc., complete as directed by the site in charge. | 340.31 | Cu.m | 1,331 ₹4,52,952.61 Lowest | 2,800 ₹9,52,868 | 2,700 ₹9,18,837 | 2,500 ₹8,50,775 |
| 3.00 | Removal of concrete layer over stupa includes cost of material and labour charges etc., complete as directed by the site in-charge. | 63 | Cu.m | 2,662 ₹1,67,706 | 1,600 ₹1,00,800 | 1,500 ₹94,500 Lowest | 1,800 ₹1,13,400 |
| 4.00 | Brick flooring over stupa with specially moulded bricks of size 38 x 30 x 8 cm in Lime Mortar and providing pointing to the joints in LM including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the site in-charge. | 420 | Sq.m | 3,555 ₹14,93,100 | 3,000 ₹12,60,000 | 2,900 ₹12,18,000 | 2,800 ₹11,76,000 Lowest |
| 5.00 | Water tightening to top of stupa with brick jelly lime concrete (1 lime:2 Sand:4 brick aggregate of size 20mm) to an average depth of 15 cm with proper slope including ramming, consolidating, by using necessary adhesive materials etc., complete as directed by the site in-charge. | 154.25 | Cu.m | 6,888 ₹10,62,474 Lowest | 10,250 ₹15,81,062.5 | 10,000 ₹15,42,500 | 11,500 ₹17,73,875 |
| 6.00 | Providing 20mm thick plastering over the top of stupa Lime mortar (1:2). Including cost, conveyance, loading and unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in-charge. | 1,520 | Sq.m | 909 ₹13,81,680 | 700 ₹10,64,000 Lowest | 750 ₹11,40,000 | 820 ₹12,46,400 |
Tender Value
₹50.3 L
EMD Value
₹1.3 L
Closing Date
9 Apr 2026, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_903054_1
59/NIT/2025-26/Amaravati/ Vijayawada Sub Circle
Open Tender
Civil Works
Works
180 days
Amaravati, Palnadu district
As per Tender document
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
12 May 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of brick work over stupa as a supportive wall in circular manner as a toe wall by Brick work with common burnt clay bricks etc., complete as directed by site-in-Charge. | |||||
| 2Filling murrum over stupa top area to prevent the water stagnation includes cost of material and labour charges etc., complete as directed by the site in charge. | |||||
| 3Removal of concrete layer over stupa includes cost of material and labour charges etc., complete as directed by the site in-charge. | |||||
| 4Brick flooring over stupa with specially moulded bricks of size 38 x 30 x 8 cm in Lime Mortar and providing pointing to the joints in LM including cost and conveyance of all materials, labour charges, curing etc., complete as directed by the site in-charge. | |||||
| 5Water tightening to top of stupa with brick jelly lime concrete (1 lime:2 Sand:4 brick aggregate of size 20mm) to an average depth of 15 cm with proper slope including ramming, consolidating, by using necessary adhesive materials etc., complete as directed by the site in-charge. | |||||
| 6Providing 20mm thick plastering over the top of stupa Lime mortar (1:2). Including cost, conveyance, loading and unloading of all materials, labour charges, GST and other applicable taxes etc., complete as directed by the site in-charge. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.49 MB
BOQ_949168.xls
BOQ • 0.32 MB
Cover1.pdf
Additional Documents • 3.76 MB
59SingedNIT.pdf
Additional Documents • 15.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .