Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC 497339 | KOREA | CHHATTISGARH | 497339 | ₹3.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ARUN KUMAR JAISWAL L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 32.4 | cum | 101 ₹3,272.40 |
| 2.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 16.32 | cum | 2,711 ₹44,232.68 |
| 3.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 12.15 | cum | 3,548 ₹43,108.20 |
| 4.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.98 | cum | 4,185 ₹25,009.56 |
| 5.01 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.75 | cum | 4,394 ₹3,304.29 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 18.12 | sqm | 148 ₹2,681.76 |
| 7.01 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 14.4 | sqm | 345 ₹4,968 |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 4.96 | sqm | 270 ₹1,339.20 |
| 9.01 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 14.4 | sqm | 305 ₹4,392 |
Updated dates
Tender Value
₹5.6 L
EMD Value
₹7,100
Closing Date
18 Feb 2026, 5:00 pmClosed
SO(Civil), SECL, Baikunthpur Area
SO(Civil), SECL, Baikunthpur Area
Estimate for repair and renovation of existing Platform for installation of new DG set for 1 x 1010KVA/ 3.3KV DG at Katkona Sub Area of Baikunthpur Area
2026_SECL_352224_1
SECL /BKP/ DGM(C) / e-T / 83
Open Tender
Civil Works - Others
45 days
Katkona
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,100
9 Jun 2026
3 Feb 2026
20 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
3 Feb 2026 - 7 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_365015.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid