| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66,000Admitted-Finance 197 KRISHNA NAGAR JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L1 | Admitted-Finance | |
| 2 | L2₹98,000+₹32,000 (48.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.6 L+₹89,000 (134.8%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Vinay Construction Power Private Limited L2 | M/S JCM CONSTRUCTIONS L3 | MOHAN LAL L1 |
|---|---|---|---|---|---|---|
| 1.00Detailed survey and preparation of DPR for shifting of 220 KV / 132 KV DC/SC T/L for realignment of existinng transmission lines | ||||||
| 1.10 | a) Detailed Survey of Transmission Line using Modern Survey Equipments like GPS/DGPS/Total Stations/Digital Theodolites and using computer aided techniques like ALTM as well as other activities as detailed in the scope of work (The bidder has to submitt tower profile & schedule Single Line Diagram, span lengths, ascertaining the quantity of conductor, OPGW, tower type ,type of foundations , etc required for Detailed survey and preparation of DPR including Geotechnical studies for each location(complete job) for onstruction/Realignment of 220/132 KV DC/SC T/L under the jurisdiction of TLMD-III Division JKPTCL Udhampur. | 1 | KM | 59,000 ₹59,000 | 75,000 ₹75,000 | 33,000 ₹33,000 Lowest |
| 2.00Detailed survey and preparation of DPR for Construction of 220 KV / 132 KV DC/SC T/L for new transmission lines | ||||||
| 2.10 | a) Detailed Survey of Transmission Line using Modern Survey Equipments like GPS/DGPS/Total Stations/Digital Theodolites and using computer aided techniques like ALTM as well as other activities as detailed in the scope of work (The bidder has to submitt tower profile & schedule Single Line Diagram, span lengths, ascertaining the quantity of conductor, OPGW, tower type ,type of foundations , etc required for Detailed survey and preparation of DPR including Geotechnical studies for each location(complete job) for construction of 220/ 132 KV DC/SC T/L for new Transmission lines under the jurisdiction of TLMD-III Division JKPTCL Udhampur. | 1 | KM | 39,000 ₹39,000 | 80,000 ₹80,000 | 33,000 ₹33,000 Lowest |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
21 Jul 2025, 2:00 pmClosed
Executive Engineer
Executive Engineer TLMD-III JKPTCL Udhampur
Rate contract for Detailed survey and preparation of DPR for Construction of 220 KV / 132 KV DC/SC T/L for realignment of transmission lines and construction of new transmission lines under various heads under the jurisdiction of TLM
2025_PDD_278538_1
TLMD-III/udh/06 of 2025-26 dated 10-06-2025
Open Tender
Survey and Investigation Services
Item Rate
Udhampur
Please refer Tender Document
3 documents required · 3 mandatory
₹1,000
Executive Engineer TLMD-III JKPTCL Udhampur
₹6,000
Executive Engineer TLMD-III JKPTCL Udhampur
13 Sept 2025
11 Jun 2025
22 Jul 2025
11 Jun 2025
21 Jul 2025
11 Jun 2025
11 Jun 2025 - 17 Jun 2025
17 Jun 2025
Detailed survey and preparation of DPR for shifting of 220 KV / 132 KV DC/SC T/L for realignment of existinng transmission lines
a) Detailed Survey of Transmission Line using Modern Survey Equipments like GPS/DGPS/Total Stations/Digital Theodolites and using computer aided techniques like ALTM as well as other activities as detailed in the scope of work (The bidder has to submitt tower profile & schedule Single Line Diagram, span lengths, ascertaining the quantity of conductor, OPGW, tower type ,type of foundations , etc required for Detailed survey and preparation of DPR including Geotechnical studies for each location(complete job) for onstruction/Realignment of 220/132 KV DC/SC T/L under the jurisdiction of TLMD-III Division JKPTCL Udhampur.
Detailed survey and preparation of DPR for Construction of 220 KV / 132 KV DC/SC T/L for new transmission lines
a) Detailed Survey of Transmission Line using Modern Survey Equipments like GPS/DGPS/Total Stations/Digital Theodolites and using computer aided techniques like ALTM as well as other activities as detailed in the scope of work (The bidder has to submitt tower profile & schedule Single Line Diagram, span lengths, ascertaining the quantity of conductor, OPGW, tower type ,type of foundations , etc required for Detailed survey and preparation of DPR including Geotechnical studies for each location(complete job) for construction of 220/ 132 KV DC/SC T/L for new Transmission lines under the jurisdiction of TLMD-III Division JKPTCL Udhampur.
Vinay Construction Power Private Limited (BID ID -2403156)
M/S JCM CONSTRUCTIONS (BID ID -2403465)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .