| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-AOC | ₹26.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.3 LRejected-Finance | ₹30.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹31.4 LRejected-Finance | ₹31.4 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | rejith L3 | SHYNOJ N V L1 | P VIJAYAN NAIR L2 |
|---|---|---|---|---|---|---|
| 1.00Laying Sewer Line | ||||||
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 14.96 | cum | 445.99 ₹6,672.01 | 376.42 ₹5,631.24 | 430.38 ₹6,438.48 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 8.48 | cum | 3,753.49 ₹31,822.09 | 3,167.95 ₹26,857.88 | 3,622.12 ₹30,708.33 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 15 | cum | 1,223.94 ₹18,359.1 | 1,033.01 ₹15,495.15 | 1,181.1 ₹17,716.5 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 315.52 | cum | 693.26 ₹2,18,738.78 | 585.11 ₹1,84,615.08 | 669 ₹2,11,084.22 |
| 1.00 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 308.87 | cum | 827.19 ₹2,55,494.18 | 698.15 ₹2,15,637.59 | 798.24 ₹2,46,552.39 |
| 1.01 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 56.31 | cum | 961.12 ₹54,121.63 | 811.19 ₹45,678.92 | 927.48 ₹52,227.33 |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 432 | metre | 32.74 ₹14,143.68 | 27.63 ₹11,936.16 | 31.59 ₹13,646.88 |
| 1.01 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | 351 | sqm | 170.36 ₹59,796.36 | 143.78 ₹50,466.78 | 164.4 ₹57,704.4 |
| 1.01 | 2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m | 320.74 | sqm | 186.6 ₹59,850.08 | 157.49 ₹50,513.34 | 180.07 ₹57,755.65 |
Tender Value
₹31.4 L
EMD Value
₹50,000
Closing Date
20 Dec 2025, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer Sewerage Division, Kerala Water Authority,Pattoor. Thiruvananthapuram
State Plan 2025-26 - Replacing of old, under sized and damaged sewer line with new SW Sewer line, Rajiv Nagar - Sewer work-Sewerage Work
2025_KWA_821850_1
WRD/KWA-CE(SR)/TR/1201/2025
Open Tender
Civil Works - Others
300 days
Thiruvananthapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
Yes
₹50,000
Yes
29 May 2026
15 Dec 2025
23 Dec 2025
15 Dec 2025
20 Dec 2025
15 Dec 2025
Amount
Laying Sewer Line
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
OD200732/2024-2025:Providing steel sheet shoring to the sides of the trenches to depths of above 2.00m but not exceeding 4.00m using 6mm M.S. Sheet 0.50m wide stiffen on edges with 50mm x 50mm x 6mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50m below the bottom of the proposed excavation 0.50m above ground level suitably braced by horizontal walling pieces at 75mm x1 25mm x 8mm angles on either side at intervals not exceeding 1.50m and horizontal screw jack type struts at 1.50m intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.
OD200731/2024-2025:Alteration of water connection-Providing 20mm (3/4 inch) house connection from existing PVC / HDPE mains up to 110
100.43.4:Conveying, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc., complete (excluding cost of pipes): 250mm diameter pipe.
100.43.3:Conveying, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc., complete (excluding cost of pipes): 200mm diameter pipe.
100.98.99:Supply of SW Pipe 250mm, 0.6m long.
100.98.98:Supply of SW Pipe 200mm, 0.6m long.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Construction of Manholes
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD200730/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 2nd depth of 1.50m to 3.0m in all kinds of soil.
OD200724/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 3rd depth of 3.00m to 4.50m
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m
2.17.2:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
2.17.3:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.5 m
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD200723/2024-2025:Centering and shuttering including strutting propping etc and removal for Cover slab (circular)
OD200725/2024-2025:Centering and shuttering including strutting, propping etc and removal of form etc for Well steining - circular work
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
19.21.1:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 100 to 250 mm diameter
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design
OD200722/2024-2025:Conveying from casting yard and fixing the RCC cover slab of size 1.60 M dia,18 cm thick including cost of 5 Kg cement/E
OD200726/2024-2025:Supplying and fixing in position 560 mm dia. CI Cover (heavy duty-HD20) with frame as per IS 1726-1991
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD200729/2024-2025:Removal of excess earth by lorry for minimum mechanical conveyance and less royalty of earth
General Items
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.98.1008:Engaging Coolie.
100.98.1035:Engaging sewer man.
OD200717/2024-2025:Providing protection work to the electric post by using 3 nos of Kattadi poles and removing the same after the completion of work .
100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
OD200716/2024-2025:Plugging the full portion of the mouth of 225 to 300mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.
OD200715/2024-2025:Plugging the full portion of the mouth of 150mm to 200mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete
OD200719/2024-2025:Nu-Drain Ready made Inspection Chambers
OD200720/2024-2025: Domestic connection sewerage charges for each unit
OD202534/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
P VIJAYAN NAIR (BID ID -2446139)
rejith (BID ID -2445957)
Bidder Name
P VIJAYAN NAIR
rejith
SHYNOJ N V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1377534.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_1377534.xls
BOQ • 0.34 MB
NIT.pdf
Tender Documents • 7.50 MB
Download all tender documents and submit your bid