| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC NA | NA | NA | 121004 | ₹18.5 L | L1 | Accepted-AOC AOC IS ACCEPTED DUE TO L1 |
| 2 | L2₹18.6 L+₹6,758.95 (0.36%)Rejected-Finance | ₹18.6 L+₹6,758.95 (0.36%) | L2 | Rejected-Finance REJECTED DUE TO L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICAL IS REJECTED DUE TO NOT QUALIFIED IN TECHNICAL |
Tender Value
Refer Docs
EMD Value
₹95,000
Closing Date
18 Mar 2024, 2:00 pmClosed
EXECUTIVE ENGINEER, MGCCD 14, GARHMUKTESHWAR
OFFICE OF THE EXECUTIVE ENGINEER, MGCCD 14, GARHMUKTESHWAR
CONSTRUCTION OF PRB AT KM. 1.482 OF RAMPUR MINOR
2024_UPIDC_909220_9
04/EE/2023-24
Open Tender
Civil Works - Canal
Item Rate
120 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹95,000
25 May 2025
2 Mar 2024
18 Mar 2024
2 Mar 2024
18 Mar 2024
2 Mar 2024
2 Mar 2024 - 18 Mar 2024
Amount
Scraping old painted surface including disposal of all scrapped material by mechanical means including all cost of material, labour, T&P etc. as per directed by engineer in charge for proper completion of work.
Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge.
Providing & Laying of C.C M-10 A20(1:3:6) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Providing & Laying of C.C M-25 A20 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge.
Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work
Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Fixing 20mm expenssion joint with angle iron on both side and 6 mm thick steal plate over angle iron welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing Nomitox board in expension joints including cost of all labour and T&P etc. required for proper complition of work.
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.(up to 10mm)
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. (Above10mm)
Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 110 mm dia PVC pipe for utility service including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 75 mm dia PVC drainage spout pipe 600 mm long including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing steel Angle 50 x50 x 8 mm at vertical joints edge including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing sign caution board in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing year plate in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing B.M plate in position including cost of all mterial, labour and T&P for proper complition of work.
Providing & Fixing wheel guard in position including cost of all mterial, labour and T&P for proper complition of work.
Earth work in filling in making canal section, approaches and diverson including all lead lift, compaction dressing as requied for proper completion of work including all cost of labour, material and T&P etc. as Directed By Engineer in Charge.
Supplying & laying of RBM on approaches and diverson including all lead lift, compaction, dressing as required for proper completion of work including all cost labour, material and T&P etc. completeor as Directed By Engineer in Charge.
M/S VASUDEV CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .