| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC 20 1 2024 | ₹23.9 L | L1 | Accepted-AOC lowest |
| Sl No | Description | Qty | Unit | ABDUL GAFOOR L1 |
|---|---|---|---|---|
| 1.00Building Construction | ||||
| 1.01 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 36.3 | cum | 298.8 ₹10,847.93 |
| 1.02 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 23.51 | cum | 260.19 ₹6,117.85 |
| 1.03 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 6.67 | cum | 6,857.61 ₹45,726.54 |
| 1.04 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.75 | sqm | 337.42 ₹2,953.10 |
| 1.05 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 58.77 | sqm | 820.89 ₹48,240.42 |
| 1.06 | 5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 48.92 | metre | 205.21 ₹10,038.87 |
| 1.07 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 32.13 | sqm | 653.89 ₹21,009.49 |
| 1.08 | 5.9.19 : Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 7.56 | sqm | 908.21 ₹6,866.07 |
| 1.09 | 5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level | 0.81 | cum | 9,472.55 ₹7,701.18 |
Tender Value
₹23.9 L
EMD Value
₹50,000
Closing Date
23 Jul 2025, 4:00 pmClosed
EXECUTIVE ENGINEER KSHB WAYANAD
EXECUTIVE ENGINEER KSHB MEENANGADI WAYANAD
NATIONAL AYUSH MISSION - EXTENSION WORK GOVT AYURVEDA DISPENSARY AT PINANGODE, WAYANAD CIVIL AND ELECTRICAL WORK
2025_KSHB_776727_1
02B/2025-2026/DB/WYD
Open Tender
Civil Works - Buildings
180 days
PINANGODE
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
₹50,000
26 Mar 2026
15 Jul 2025
25 Jul 2025
15 Jul 2025
23 Jul 2025
15 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1270112.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid