Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.9 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹2.0 LRejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹2.0 L | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹2.0 LRejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹2.0 L | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
JOBS TO BE DONE :-
SL.
NO. DESCRIPTION QNTY.
1- Dismantling & Fitting Complete Clutch Plate Pressure Plate, Fly Wheel Assly. Clutch Bearing Collector Ring etc. 1 Set.
2- Dismantling & Fitting Complete Gear Box Assly. PTO Pump Assly. All Diesel Pipe Line, Inter Cooler Pipe Lines, Diesel Pipe Lines and all hoses etc. 1 Set.
3- Fly Wheel Assly. Complete Refacing. 1 No.
4- Clutch Booster Complete Removing & Changing, Fitting. 1 No.
5- Tie Rod, Push Rod Dismantling and Changing, Fitting. 4 Sets.
6- Dismantling & Fitting, Greesing Clutch and Brake Paddle & Setting. 1 Set.
7- Rear Both Side Spring Leaf Removing & Necessary Recambering Fitting. 2 Sets.
8- Rear Both Side Spring Shackle Removing Fitting. 2 Nos.
9- Rear Both Side Spring Hanger Removing & Bolt Changing, Fitting. 4 Nos.
10- Rear Both Side Spring U. Bolt Cutting & Changing, Fitting. 4 Nos.
11- Rear Both Side Spring Cutting, Welding. 4 Nos.
12- Air Brake Unloader Valve Overhauling, Fitting. 1 No.
13- Air Brake Treadle Valve Overhauling, Fitting. 1 No.
14- Air Brake Unloader Valve Returning Hose Removing Changing, Fitting. 2 Nos.
15- Complete Air Section Pipe Line Removing Checking, Repairing ‘O’ Ring Replacement Fitting, Air Leakage Problem Rectifying. 1 Set.
16- Complete Diesel Section Pipe Line Removing Checking, Repairing and Air Lock Problem Rectifying. 1 Set.
17- Complete Silencer Cutting, Welding, Repairing and Removing Fitting, Bolt, Nut, Clamps Replacement Fitting, Including Materials with Labour Cost. 1 Set.
18- Both Side Operator Cabin Door Lock with Handle Removing Changing, Fitting & Setting Greesing & Door Opening, Closing Problem Rectifying. 2 Sets.
19- Front Both Side Wheel Mudguard Damaged Portion Cutting & Necessary Damaged Sheet Changing, Welding, Denting, Repairing, Including Materials with Labour Cost. 2 Nos.
20- Both Side Looking Glass with Frame Removing & Changing, Fitting. 2 Sets.
21- Chassis U. Bolt Cutting & Changing, Fitting. 4 Nos.
SPARES/MATERIALS REQUIRES ITEMS :-
SL.
NO. DESCRIPTION QNTY.
1- Clutch Plate Assly Complete. 1 No.
2- Pressure Plate Assly. Complete. 1 No.
3- Clutch Bearing with Yoke Assly. 1 Set.
4- Clutch T.H. Cover with Oil Seal. 1 Set.
5- Clutch Collector Ring. 1 No.
6- Clutch Booster Assly. Complete. 1 No.
7- Tie Rod Push Rod Repair Kit. 4 Sets.
8- Brake Unloader Valve Repair Kit. 1 Set.
9- Brake Treadle Valve Repair Kit. 1 Set.
10- Brake Hose. 2 Nos.
11- Locking Glass with Bracket Bolt Nut. 2 Sets.
12- Chassis U. Bolt with Washer. 4 Sets.
13- Rear Spring Pin with Bush. 4 Sets.
14- Rear Spring 2nd Leaf. 2 Nos.
15- Rear Spring 4th Leaf. 2 Nos.
16- Rear Spring Clamp with Bolt. 4 Sets.
17- Rear Spring U. Bolt 4 Nos.
18- Rear Spring Cotter Pin Bolt & Hanger Bolt. 8 Nos.
19- Rear Spring Side Washer. 8 Nos.
20- Door Lock with Handle. 2 Sets.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 1,89,995 ₹1.9 L | 2,00,800 ₹2.0 L | 2,02,950 ₹2.0 L |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.0 L
EMD Value
₹2,485
Closing Date
26 Jan 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA OFFICE
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of complete clutch system assly, brake unloader valve, treadle valve overhauling, repairing of rear both side spring leaf, removing and fitting and operator cabin door lock replacement fitting, both side mudguard cutting, welding, repairing
2026_BCCL_351224_1
BCCL/KA-VI/EXC/E-TEN/25-26/136
Open Tender
Excavation Department Work
10 days
ADIC KUSUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,485
Yes
1 Mar 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
26 Jan 2026
14 Jan 2026
Item Description/ Heading
Jobs to be done: JOBS TO BE DONE :- SL. NO. DESCRIPTION QNTY. 1- Dismantling & Fitting Complete Clutch Plate Pressure Plate, Fly Wheel Assly. Clutch Bearing Collector Ring etc. 1 Set. 2- Dismantling & Fitting Complete Gear Box Assly. PTO Pump Assly. All Diesel Pipe Line, Inter Cooler Pipe Lines, Diesel Pipe Lines and all hoses etc. 1 Set. 3- Fly Wheel Assly. Complete Refacing. 1 No. 4- Clutch Booster Complete Removing & Changing, Fitting. 1 No. 5- Tie Rod, Push Rod Dismantling and Changing, Fitting. 4 Sets. 6- Dismantling & Fitting, Greesing Clutch and Brake Paddle & Setting. 1 Set. 7- Rear Both Side Spring Leaf Removing & Necessary Recambering Fitting. 2 Sets. 8- Rear Both Side Spring Shackle Removing Fitting. 2 Nos. 9- Rear Both Side Spring Hanger Removing & Bolt Changing, Fitting. 4 Nos. 10- Rear Both Side Spring U. Bolt Cutting & Changing, Fitting. 4 Nos. 11- Rear Both Side Spring Cutting, Welding. 4 Nos. 12- Air Brake Unloader Valve Overhauling, Fitting. 1 No. 13- Air Brake Treadle Valve Overhauling, Fitting. 1 No. 14- Air Brake Unloader Valve Returning Hose Removing Changing, Fitting. 2 Nos. 15- Complete Air Section Pipe Line Removing Checking, Repairing ‘O’ Ring Replacement Fitting, Air Leakage Problem Rectifying. 1 Set. 16- Complete Diesel Section Pipe Line Removing Checking, Repairing and Air Lock Problem Rectifying. 1 Set. 17- Complete Silencer Cutting, Welding, Repairing and Removing Fitting, Bolt, Nut, Clamps Replacement Fitting, Including Materials with Labour Cost. 1 Set. 18- Both Side Operator Cabin Door Lock with Handle Removing Changing, Fitting & Setting Greesing & Door Opening, Closing Problem Rectifying. 2 Sets. 19- Front Both Side Wheel Mudguard Damaged Portion Cutting & Necessary Damaged Sheet Changing, Welding, Denting, Repairing, Including Materials with Labour Cost. 2 Nos. 20- Both Side Looking Glass with Frame Removing & Changing, Fitting. 2 Sets. 21- Chassis U. Bolt Cutting & Changing, Fitting. 4 Nos. SPARES/MATERIALS REQUIRES ITEMS :- SL. NO. DESCRIPTION QNTY. 1- Clutch Plate Assly Complete. 1 No. 2- Pressure Plate Assly. Complete. 1 No. 3- Clutch Bearing with Yoke Assly. 1 Set. 4- Clutch T.H. Cover with Oil Seal. 1 Set. 5- Clutch Collector Ring. 1 No. 6- Clutch Booster Assly. Complete. 1 No. 7- Tie Rod Push Rod Repair Kit. 4 Sets. 8- Brake Unloader Valve Repair Kit. 1 Set. 9- Brake Treadle Valve Repair Kit. 1 Set. 10- Brake Hose. 2 Nos. 11- Locking Glass with Bracket Bolt Nut. 2 Sets. 12- Chassis U. Bolt with Washer. 4 Sets. 13- Rear Spring Pin with Bush. 4 Sets. 14- Rear Spring 2nd Leaf. 2 Nos. 15- Rear Spring 4th Leaf. 2 Nos. 16- Rear Spring Clamp with Bolt. 4 Sets. 17- Rear Spring U. Bolt 4 Nos. 18- Rear Spring Cotter Pin Bolt & Hanger Bolt. 8 Nos. 19- Rear Spring Side Washer. 8 Nos. 20- Door Lock with Handle. 2 Sets. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_363977.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_363977.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid