| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC C 125 NARAINA INDUSTRIAL AREA PHASE I NARAINA NEW DELHI DELHI 110028 | NEW DELHI | DELHI | 110028 | ₹4.3 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹4.7 Cr+₹41.2 L (9.67%)Rejected-Finance 8 34A FATHIMAPURAM TAMILNADU | TAMILNADU | ₹4.7 Cr+₹41.2 L (9.67%) | L2 | Rejected-Finance Higher rate |
Tender Value
₹4.9 Cr
EMD Value
₹1 L
Closing Date
7 Jun 2021, 5:00 pmClosed
Deputy Chief Engineer, Electrical Circle,Tvpm
Deputy Chief Engineer, Electrical Circle, Power House, Trivandrum
Laying HT and LT UG cable in the existing and excavated duct , providing feeder piller box and service connection
2021_KSEB_422929_1
KSEBL/EC-TVM/SPST/ PHASEII/01/2021-22 dtd 19.05.21
Open Tender
Electrical Works
Turn-key
120 days
Aroung Sree Padmanabha Swamy Temple
Refer PQ bid Part I and II
6 documents required · 6 mandatory
₹8,850
₹1 L
Office of Deputy Chief Engineer, Electrical Circle
2 Nov 2021
12 May 2021
14 Jun 2021
12 May 2021
7 Jun 2021
20 May 2021
19 May 2021
Amount
Supply, laying testing and commissioning of 11kV, XLPE UG(3*300sqmm) cable Supply, laying testing and commissioning of 11kV, XLPE UG(3*300sqmm) cable after meggering in already formed/built in /permanent cable duct after removing covering slabs of ducts dewatering if required at locations /GI (250 Meters suitable for 3* 300 sqmm cable)/HDPE pipe (750 Meter suitable for 3* 300 sqmm )/ culvert/ Bridges, rising cables at a height of 1.5M from ground level and support at Transformer and poles,etc taking to the transformer yard/RMU side/cable rising poles, providing cable tag at an interval of 5m, supply and doing straight through joint/termination , connecting cable to RMU/ structure using necessary supports, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying straight joint kit(shear bolt type) as per the requirement of site conditions, out door and indoor termination kit and carrying out straight joints and out door/indoor terminations, providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, laying testing and commissioning of 11kV, XLPE UG( 3*150 sqmm cable : Supply, laying testing and commissioning of 11kV, XLPE UG(3*150sqmm) cable after meggering in already formed/built in /permanent cable duct after removing covering slabs of ducts dewatering if required at locations /GI (250 Meters suitable for 3* 150 sqmm cable)/HDPE pipe (750 Meter suitable for 3* 150 sqmm cable)/ culvert/ Bridges, rising cables at a height of 1.5M from ground level and support at Transformer and poles,etc taking to the transformer yard/RMU side/cable rising poles, providing cable tag at an interval of 5m, supply and doing straight through joint/termination , connecting cable to RMU/ structure using necessary supports, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying straight joint kit(shear bolt type) as per the requirement of site conditions, out door and indoor termination kit and carrying out straight joints and out door/indoor terminations, providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Earth work excavation for laying HT UG cable if required for item 1 (a) -Earth work excavation in all class of soil/rock/tar/concrete for a minimum depth of 1.2m and width 0.6 m with out damaging the existing cables, pipe lines, other utility crossings and installations, observing safety precautions, shoring of pits and dewatering the trench wherever necessary, spreading the bottom of the trench with 10cm sieved excavated earth and after laying of HT cable (Cable laying measured separately) doing straight joint as per the requirement of site conditions filling with sieved earth on both side of the cable and on the top to a level of 10cm above the cable, covering the same with RCC interlocking slab (60x30x5cm),back filling the trench with excavated earth, consolidating in layers of 15 cm with suitable machinery, disposing surplus earth and debris after refilling ,clearing the site including supplying 125mm dia HDPE pipe for drawing cable through the pipe at road crossings, wherever required depth of trench could not be achieved due to other obstructions, for maintaining working clearance and for crossing other utilities. rising the cable etc, as directed by the Engineer- in charge, providing cable route markers at 100 m interval and at deviations , & straight joint markers as per approved drawings, including cost of all materials , labour charges, hire charges, transportation etc complete excluding the cost of GI pipe and road restoration charges and cost of cable and laying charges.
c. Earth work excavation for laying LT UG cable : Earth work excavation in all classes of soil/rock/tar/concrete for a minimum depth of 1 meter and width 40 cm without damaging the existing cable /pipeline and other utility crossing observing safety precautions shoring of pits and dewatering the trench wherever necessary, spreading the bottom of the trench with 10 cm sieved excavated earth after laying LT cable using GI/HDPE pipe (1.5 times of required cable diameter ) at locations culvert/ Bridges ,backing filling the duct and consolidating the soil with suitable machinery ,disposing surplus earth and cleaning the site and providing cable route markers at 100m intervals
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 2x4sqmm - sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe (1.5 times of cable dia - 23400 Meter)/ culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar/Automatic Street Light Controller and then to consumer premises/ street lighting, providing cable tag at an interval of 5m, supply and doing joints through cable glands, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x6 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe (1.5 times of cable dia - 2500 Meter) / culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to consumer premises, providing cable tag at an interval of 5m, supply and doing joints through cable glands, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x25 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe(1.5 times of cable dia - 400 Meter)/ culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to consumer premises, providing cable tag at an interval of 5m, supply and doing joints through cable glands, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x50 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe (1.5 times of cable dia - 200 Meter)/ culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to consumer premises, providing cable tag at an interval of 5m, supply and doing joints through cable glands, all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x95 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe (1.5 times of cable dia - 200 Meter) / culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to consumer premises, providing cable tag at an interval of 5m, supply and doing joints through cable glands , all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all material
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x120 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe(1.5 times of cable dia - 450 Meter)/ culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to other feeder pillars , providing cable tag at an interval of 5m, supply and doing joints through cable gland , all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Laying testing and commissioning of LT UG cable(Al armoured) of 3.5x150 sqmm sizes after meggering in already formed/built in /permanant cable duct after removing covering slabs of ducts at locations /GI/HDPE pipe (1.5 times of cable dia - 300 Meter)/ culvert/ Bridges, rising cables at a height of 1M from ground level and support at feeder pillar and then to transformer LT panel , providing cable tag at an interval of 5m, supply and doing joints through cable glands , all charges for transporting, handling, uncoiling and paving of cable in trenches using standard cable laying equipments as per IS specifications, opening the cable trench cover and closing the cover after laying the cable, after observing all safety precautions and without damaging the existing installations etc complete including supplying cable glands, and carrying out joints and providing loop as per standard , testing and commissioning and submission of final as built cable route drawings as per specifications including cost of all materials
Supply, Installation, Testing and Commissioning of automatic street light controller : Supply, Installation,( 2*4 sqmm 1500 m)Testing and Commissioning of automatic street light controller (SMC Box) , connecting cables , including construction of suitable foundation, providing location name, labelling, danger boards etc, earthing, conducting pre-commissioning tests as required ,including cost of all materials and transportation charges.
Supply, Installation,wiring , Testing of 3ph dust and vermin proof SMC meter box -Supply, Installation,wiring through 20 mm PVC pipe and accessories (750 meter PVC pipe and Al armoured cable 3.5* 6 sqmm sqmm 3760 m)where ever necessary, Testing of 3ph dust and vermin proof SMC meter box with 32 Amp cutout fuse and neutral link at consumers premises ,shifting of existing 3 ph meters on newly erected SMCbox ,wiring upto db,Earthing ,etc. ,including cost of all materials,labour and transportation charges.
Supply, Installation,wiring , Testing of 1ph dust and vermin proof SMC meter box -Supply, Installation(1000 meter PVC pipe and Al armoured cable 2*4 sqmm 24000 m)Testing of 1ph dust and vermin proof SMC meter box with 16 Amp cutout fuse and neutral link at consumers premises ,shifting of exixting 1 ph meters on newly erected SMCbox ,wiring upto DB, Earthing etc. ,including cost of all materials,labour and transportation charges.
Supply, Installation, Testing and Commissioning of metallic Feeder Pillar Box--Supply, Installation, Testing and Commissioning of metallic Feeder Pillar Box with 400 Amp isolator at both ends , provision for connecting incoming cable and using required glands out going cables ,minimum 15 nos. of out going terminals with HRC fuse(16 Amp to 63 Amp) protection for giving service connections including construction of suitable foundation providing location name, labelling, danger boards etc, earthing, conducting pre-commissioning tests as required ,including cost of all materials and transportation charges.
Fathima Engineering Co. Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .